    Buildings & Facilities · Chapter 31Applied

    By Kurnia · Published November 11, 2026 · Version 1 · 21 min read

    Hospital facility and utility management

    critical utilities, maintenance planning, generator set and transfer switch testing, clean water and hot water, emergency preparedness, and records and accreditation

    When the power fails before dawn, the hospital generator set starts and the intensive care unit stays lit, but the ward taps run dry because the water transfer pump is not on the generator circuit. This chapter covers hospital facility and utility management from the building technician’s side: critical utilities and their critical components, the inventory and the risk register, maintenance planning and how to measure it, periodic testing of the generator set and transfer switch and the fuel reserve, clean water quantity and reserves, hot water temperatures and Legionella testing, emergency preparedness, and the records that the hospital accreditation standard asks for. Its basis is Permenkes 6/2026 on Hospitals, the hospital accreditation standard KMK HK.01.07/MENKES/1596/2024, the annex of Permenkes 7/2019 that is still in force, and WHO and CDC guidance as comparisons. Work on panels, generator sets, fuel tanks, and pressurized systems is set out as work for competent personnel and authorized parties.

    Section you’re reading: Chapter opening

    At 02:10 in the morning, the utility supply to a 200-bed hospital fails because of a fault at the substation. The generator set starts, the automatic transfer switch moves the essential load within a few seconds, and the intensive care unit stays lit. An hour later the ward taps run dry. The transfer pump from the ground water tank to the rooftop tank turns out to be fed from a panel that is not on the generator circuit, so the rooftop tank empties and the sterilization unit postpones its cycles. The logbook shows that the generator set was run every week for ten minutes without load, but it had never been tested by transferring the actual building load.

    The machine worked that night; what failed was its management. The list of critical utilities did not connect water with power, and the tests checked the machine but not the system. A building technician who understands how a hospital manages its utilities can find a gap like that before the next outage.

    Scope

    This chapter covers hospital facility and utility management from the side of the building technician and the person responsible for the facility: critical utilities, the inventory and the risk register, maintenance planning, testing of the standby power and water sources, clean water and hot water, emergency preparedness, and records for accreditation. Clinical procedures and medical decisions are not covered. Status of the rules as of November 2026: Permenkes 6/2026 (Minister of Health Regulation) on Hospitals revokes Permenkes 40/2022 on the technical requirements for hospital buildings, infrastructure, and medical equipment. Permenkes 3/2026 revokes Permenkes 7/2019 on Hospital Environmental Health except Article 3, Article 10, and Article 11 together with the Annex, even though the Ministry of Health JDIH page labels Permenkes 7/2019 “Tidak Berlaku” (not in force); check with the legal unit or the health office before using it for permits.

    Generator sets and transfer switches are in Chapter 36 · Electrical & Control on generator sets, transfer switches, and standby supply, and the replacement supply for medical rooms is in Chapter 102 · Electrical & Control on electricity in medical rooms. Fire alarms are in Chapter 19 to Chapter 23, lifts in Chapter 24 and Chapter 25, steam and hospital laundry utilities in Chapter 18 and Chapter 12 · Utilities, and incident investigation in Chapter 12 · Safety.

    Work outside the facility technician’s authority: opening panels and changing electrical connections, adjusting timers on or bypassing the transfer switch, connecting a test load to the generator set, opening fuel tanks and fuel lines, opening pressurized water heaters or steam lines, and chemical disinfection of the water system. That work belongs to authorized electricians, generator or plumbing contractors, and the environmental health unit, with a work permit and energy isolation as in Chapter 76 · Electrical & Control on safe work and Chapter 4 · Safety on non-electrical energy isolation. The facility technician inspects, reads the instruments on the front of the panel when assigned, records, and reports.

    Critical utilities and critical components

    The hospital accreditation standard, KMK HK.01.07/MENKES/1596/2024 (Minister of Health Decree), defines utilities as systems and equipment that support services essential to patient safety: the electrical network, water, ventilation and airflow, medical gas including oxygen outlets with flowmeters, and steam. The hospital also manages the critical components of power, water, and medical gas, such as piping, switches, and relays, and ensures that water and power are available 24 hours a day, 7 days a week.

    A critical utility is a utility whose failure directly threatens patients or stops an essential service. A critical component is a part of a utility system that, when it fails, shuts down that system or an important part of it. The transfer switch is a critical component of the electrical system; the transfer pump is a critical component of the water system.

    Under the accreditation standard, the utility management program covers at least:

    1. Availability of water and power 24 hours a day, 7 days a week.
    2. An inventory of utility system components, a map of their distribution, and periodic updates.
    3. Inspection, maintenance, and repair of all components on the inventory.
    4. A schedule of inspection, functional testing, and maintenance based on manufacturer recommendations, risk level, and the hospital’s experience.
    5. Labeling of utility system control levers to help with a full or partial emergency shutdown during a fire.

    The inventory marks the components that affect life support, infection control, environmental support, and communication, and their risks are assessed every year in the risk register. The transfer pump affects infection control, because sterilization and handwashing depend on it, and a distribution map that shows which panel feeds which pump reveals the gap in the opening case on paper. One way to rank risks is:

    R=P×DR = P \times D

    where RR is the risk score, PP is the score for the likelihood of failure, and DD is the score for the impact on patients and services, each an integer on a scale such as 1 to 5. The scale and the priority thresholds are set by the hospital’s risk management program, and the score only ranks; it does not replace technical inspection.

    Maintenance planning and how to measure it

    Permenkes 6/2026 includes maintenance of facilities, infrastructure, and medical devices among the minimum services a hospital provides, which may be provided through cooperation with a third party, and the hospital’s installations carry out the function of managing and maintaining facilities and infrastructure. Maintenance may be contracted out, but the hospital keeps the program.

    The accreditation standard separates the annual inventory, periodic inspection, periodic testing against set criteria, maintenance, and repair. Inspection looks at condition; testing proves function. A full oil level is a result of inspection, while a transfer switch that moves the load is a result of testing. Strategy per component is covered in Chapter 11 · Systems, Diagrams & Diagnosis on maintenance strategy. The first measure that is easy to calculate from the records is planned maintenance compliance:

    K=ncompletednscheduled×100 %K = \frac{n_\text{completed}}{n_\text{scheduled}} \times 100\,\%

    where nscheduledn_\text{scheduled} is the number of planned maintenance work orders in a period and ncompletedn_\text{completed} is the number completed. Postponed work is recorded with its reason, because a high KK means nothing if work orders can be removed from the schedule without a trace. The second measure is availability, from Chapter 10 · Systems, Diagrams & Diagnosis on reliability and availability:

    A=MTBFMTBF+MTTRA = \frac{\text{MTBF}}{\text{MTBF} + \text{MTTR}}

    where MTBF is the mean time between failures (hours) and MTTR is the mean time to repair (hours), assuming random failures. Two parallel components, each able to carry the load on its own, have a combined unavailability of about the product of the two, provided they do not fail from a common cause. Two pumps fed from one panel without a generator fail together in an outage (Example 5).

    Generator set and transfer switch testing from the manager’s side

    The accreditation standard asks that standby power be tested according to a plan that proves the load is what is needed, at least once every 6 months or more often if regulations or the condition of the power source require it, with the results documented. At purchase, the capacity of the generator set is tested with a dummy load, and the hospital decides how much fuel to store unless another authority has set a rule.

    The WHO hospital safety index gives a stricter comparison, as an assessment tool and not an Indonesian regulation. A high rating is given when the standby source starts automatically in less than 10 seconds and covers more than 70 percent of demand in critical areas, when the generator set is tested at full load at least monthly, and when fuel lasts at least 72 hours at the hospital’s maximum capacity. A hospital without tanks that relies on a contract with a fuel station is given a low rating.

    A test schedule distinguishes three kinds of test. A no-load run checks that the engine starts and runs steadily. A building-load test transfers real load through the transfer switch and would find the pump panel left behind in the opening case. A full-load test with a dummy load proves capacity without putting patients at risk. All three are planned by the person responsible for utilities and carried out by an authorized electrician or the generator contractor, and a building-load test requires notice to the critical clinical units and a plan for the case where the generator set fails.

    A test record contains the time of the outage signal and the time of transfer, the voltage and frequency on the panel instruments, the load in kW, the test duration, the fuel level, alarms, and panels that were not supplied. The load fraction and the fuel requirement are calculated with:

    f=PPnVfuel=P×b×tf = \frac{P}{P_\text{n}} \qquad V_\text{fuel} = P \times b \times t

    where PP is the measured load (kW), PnP_\text{n} is the rated active power of the generator set (kW), that is, the rated kVA multiplied by the rated power factor as in Chapter 36 · Electrical & Control, VfuelV_\text{fuel} is the fuel volume (L), bb is the specific fuel consumption at that load (L/kWh) from the generator set data sheet, and tt is the operating time (hours). Specific consumption changes with load, so the figure for one load point is not used for another. The annex of Permenkes 7/2019 also requires an emission test of the stack of a generator set below 1,000 kVA once a year by an accredited laboratory.

    Clean water: quantity, reserve, and quality

    The annex of Permenkes 7/2019 sets the quantity of water for hospitals.

    NeedValueUnit
    Drinking water, all classes5 to 7.5L/bed/day
    Hygiene and sanitation, class A and B hospitals400 to 450L/bed/day
    Hygiene and sanitation, class C and D hospitals200 to 300L/bed/day
    Outpatients, already included in the class figures5L/person/day

    The hygiene and sanitation figures already include linen, the nutrition kitchen, cleaning, and watering, and the upper limit is meant to encourage saving water. The annex uses classes A to D, whereas Permenkes 6/2026 classifies hospitals per service group as paripurna, utama, madya, and dasar (comprehensive, main, intermediate, and basic). The correspondence between the old classes and the new classification cannot yet be confirmed, so the figure to use is asked of the environmental health unit and the health office.

    For emergencies, the same annex requires a hygiene and sanitation water tank with a capacity of at least 3 times the daily need, or able to supply water for at least 3 days after the supply stops. Staff inspect the tank volume, the tank should have a low-level alarm, and the hospital prepares a backup source: deep groundwater if the water comes from the regional water company, or a clean water supplier if the water comes from groundwater. The hospital also asks the water company or supplier for a written statement that tanker deliveries to the hospital are given priority. The reserve volume is:

    V=N×q×dV = N \times q \times d

    where VV is the volume (L), NN is the number of beds, qq is the need per bed per day (L), and dd is the number of days. The WHO index uses 72 hours and advises at least 300 L per bed per day, apart from the water reserve for firefighting. That WHO figure does not replace the Permenkes figure.

    The frequency of water quality testing is not quite the same in the two documents.

    TestAnnex of Permenkes 7/2019Accreditation standard
    Hygiene and sanitation water, chemicalevery 6 monthsat least every 6 months
    Hygiene and sanitation water, biologicalevery monthnot separated; quality monitoring at least once a year
    Residual chlorine, pH, turbidity at vulnerable pointsevery 24 hours when chlorine powder is usednot mentioned
    Draining and disinfecting tanksevery 6 monthsnot mentioned
    Water for dialysiscovered separatelybacteria and endotoxin every month, chemicals every year

    The accreditation standard also states monitoring at least once every 3 months, which differs from its own annual item. Where the provisions differ, the hospital schedule uses the more frequent one, and the environmental health unit sets it. Samples are sent to a nationally accredited laboratory.

    Hot water and Legionella control

    The basics of Legionella growth, dead legs, and tank stratification are in Chapter 13 on building hot water. On the management side, the annex of Permenkes 7/2019 requires that hot water, cooling towers, eyewash stations, and emergency body showers be tested for Legionella spp once a year, with the facilities cleaned every week.

    CDC guidance (United States data) states that cold water in health-care facilities is stored and distributed below 20 °C, while hot water is stored above 60 °C and circulated with a return temperature of at least 51 °C, or the highest temperature allowed by local regulations. To reduce the risk of scalding, CDC recommends thermostatic mixing valves at the point of use or warning signs at each tap. In Indonesia, cold water in a rooftop tank is often warmer than 20 °C because of the air temperature, so that requirement cannot simply be copied.

    The temperature record contains the heater outlet, return pipe, and farthest-point temperatures, the dates when showerheads were cleaned, and the flushing schedule for rarely used taps. A large temperature drop between the outlet and the return pipe points to heat loss or an unbalanced circulation flow (Example 6). Thermal or chemical disinfection after a positive finding is decided by the environmental health unit and the infection prevention team and carried out by the plumbing contractor under a written procedure, because very hot water and high-strength chlorine injure people.

    Emergency preparedness and planned disruptions

    The accreditation standard asks the hospital to identify the areas at highest risk if power fails or water is disrupted, such as areas that need lighting, refrigerators, life support, and water for sterilization. For disasters, the hospital carries out a hazard vulnerability analysis every year, builds its disaster management program from the results, and holds a drill at least once a year, including a debriefing.

    A hazard vulnerability analysis is a periodic assessment of the disasters that may occur in the hospital’s area and their effect on the building, utilities, and services. For the technician, the results become concrete questions: can the generator room flood, and can a water tanker truck reach the filling point when the main road is closed. The WHO Europe emergency response checklist asks for appropriate backup for essential lifelines, including water, power, and oxygen.

    For disruptions of the outside water supply, CDC asks for a contingency plan that estimates the water demand of the whole facility, compliance with boil-water advisories, and, after an advisory is lifted, running taps at full flow for at least 5 minutes or flushing the system with hot water or chlorination. In Indonesia the procedure is set by the environmental health unit.

    A planned disruption, that is, a deliberate shutdown of one utility for repair or renovation, is managed like construction: the accreditation standard asks for a pre-construction risk assessment that covers utilities, air quality, infection prevention, noise, fire, and emergency procedures, plus an infection control risk assessment. This means that no main valve is closed and no panel is switched off before the affected units have been notified, a replacement source is ready, and the work permit is signed.

    Records, program, and accreditation

    The Manajemen Fasilitas dan Keselamatan (MFK, facility management and safety) chapter of the accreditation standard covers leadership and planning, safety, security, hazardous and toxic materials and their waste, fire protection, medical equipment, utility systems, emergencies and disasters, construction and renovation, and training. A competent person responsible for MFK reports directly to the director, draws up the MFK program every year, maintains the risk register, oversees testing and monitoring, submits an annual report, and manages incident reports. Safety risk monitoring is reported to the hospital leadership every 6 months.

    Training on the MFK program, including utility systems, is given to all staff on all shifts every year with a test of knowledge, including vendors and contract workers according to their roles. Article 10 of Permenkes 7/2019, which is still in force, requires environmental health records and reports, including inspection results, to be submitted to the director.

    A surveyor reads records to see whether the process is running, and test sheets in which all the figures are the same or the load column is always empty show tests that were not done or not measured. An honest record with one failure, its cause, and the corrective action is more useful, because that is the material for an investigation as in Chapter 12 · Safety on incident investigation. Gaps are written down as they are, not filled in after the event.

    Worked example

    The numbers in the examples below are practice numbers unless their origin is stated.

    Example 1: volume of a three-day water reserve. A 200-bed hospital uses 400 L per bed per day, as decided by the environmental health unit. The daily need is 200×400=80,000200 \times 400 = 80{,}000 L, that is, 80 m³, and the three-day reserve is 3×80=2403 \times 80 = 240 m³. A ground water tank of 150 m³ and a rooftop tank of 30 m³ total 180 m³, enough for 180/80=2.25180/80 = 2.25 days, 60 m³ short. With the WHO figure of 300 L for 72 hours, the need is 200×300×3=180,000200 \times 300 \times 3 = 180{,}000 L, that is, 180 m³, the same as the tank contents. The tanks meet the WHO advice but do not yet meet the requirement of three times the daily need.

    Example 2: water use from meter readings. The main meter reads 12,480 m³ on Monday at 08:00 and 13,070 m³ the following Monday, so the weekly use is 590 m³. Per bed per day, 590,000/(7×200)=421590{,}000/(7 \times 200) = 421 L, within the range of 400 to 450 L. If the next week’s use is 700 m³, the figure is 700,000/(7×200)=500700{,}000/(7 \times 200) = 500 L, above 450 L, and the cause is sought, for example a leak or a stuck float valve.

    Example 3: fuel for 72 hours. The generator load during an outage is 320 kW, and the data sheet gives a specific consumption of 0.26 L/kWh at that load. The fuel rate is 320×0.26=83.2320 \times 0.26 = 83.2 L/hour, so 72 hours require 83.2×72=5,99083.2 \times 72 = 5{,}990 L. A 1,000 L day tank and a 4,000 L main tank hold 5,000 L, but only 90 percent is usable, that is, 5,000×0.9=4,5005{,}000 \times 0.9 = 4{,}500 L, enough for 4,500/83.2=54.14{,}500/83.2 = 54.1 hours. The shortfall is 5,990−4,500=1,4905{,}990 - 4{,}500 = 1{,}490 L. Adding a tank is work for a licensed contractor.

    Example 4: reading a generator test record. A 500 kVA generator set with a rated power factor of 0.8 has an active power of 500×0.8=400500 \times 0.8 = 400 kW. The authorized electrician gives the outage signal, and the record shows that the transfer switch moved the load 13 seconds later. The measured load is 150 kW, so f=150/400=0.375f = 150/400 = 0.375, that is, 37.5 percent. A time of 13 seconds is above the 10 seconds that the WHO index uses for the average and high ratings, and a load of 37.5 percent does not prove full capacity. The facility technician records and reports without resetting the timer, and the transfer time for medical rooms is assessed according to Chapter 102 · Electrical & Control.

    Example 5: maintenance compliance and pump availability. Of 52 planned maintenance work orders, 46 were completed, so K=46/52×100 %=88.5 %K = 46/52 \times 100\,\% = 88.5\,\%. A transfer pump with an MTBF of 2,000 hours and an MTTR of 8 hours has A=2,000/2,008=0.99602A = 2{,}000/2{,}008 = 0.99602, or (1−0.99602)×8,760=34.9(1 - 0.99602) \times 8{,}760 = 34.9 hours unavailable per year. Two independent parallel pumps give 0.003982=0.00001580.00398^2 = 0.0000158, or 0.0000158×8,760=0.140.0000158 \times 8{,}760 = 0.14 hours per year. If both are fed from the same panel without a generator, one outage stops both, and the figure of 0.14 hours no longer applies.

    Example 6: heat loss in a hot water circulation loop. Water leaves the heater at 62 °C, the return pipe is at 49 °C, and the cold water in the rooftop tank is at 29 °C. The return temperature is below the 51 °C in the CDC guidance, and the cold water is above 20 °C. A drop of 62−49=1362 - 49 = 13 K at a circulation flow of 0.25 L/s, with 1 L of water about 1 kg and a specific heat of 4.19 kJ/(kg·K), means a heat loss of 0.25×4.19×13=13.60.25 \times 4.19 \times 13 = 13.6 kW that the heater supplies continuously. That figure points to damaged insulation or an unbalanced circulation flow, and the finding is reported to the person responsible for plumbing and to the environmental health unit.

    Stop conditions

    1. The generator set fails to start, the transfer switch does not move the load, or a panel is not supplied during a test or an outage: do not bypass the transfer switch, do not connect temporary cables, and do not open the panel. Report to the person responsible for utilities, put the electrical emergency plan into action, and hand the repair to an authorized electrician or the generator contractor.
    2. There is a smell of fuel, a diesel spill in the generator room, or a leak in a fuel tank or fuel line: stop the test, keep ignition sources away, do not turn any switch on or off in that area, and hand over to the person responsible for occupational safety and health (K3) and the generator contractor.
    3. A building-load test would transfer the load of the intensive care unit, operating rooms, or life-support units without notice to the clinical units, without a plan for the case where the generator set fails, or without an authorized electrician on site: postpone the test until the person responsible for MFK approves the plan.
    4. The outside water supply has stopped and the reserve is less than planned, or the low-level alarm sounds and the transfer pump is not working: put the water emergency plan into action and report to the person responsible for utilities and the environmental health unit, which contacts the priority water supplier; a pump panel that smells burnt is not opened by the facility technician.
    5. Water test results deviate from the quality standard, Legionella is found, or there is a boil-water advisory: stop using the affected water for drinking and procedures as decided by the environmental health unit and the infection prevention and control team, which take over the next decisions.
    6. The work requires opening a panel, changing connections of the generator set or transfer switch, connecting a test load, opening a pressurized water heater or a steam line, or thermal and chemical disinfection: hand it over to competent personnel or an authorized contractor with a work permit and energy isolation.
    7. A planned disruption of power, water, or medical gas is about to start without a pre-construction risk assessment, without notice to the affected units, or without a ready replacement source: postpone it until the person responsible for MFK and the affected units approve.
    8. A test or maintenance record is incomplete, or there are signs that it was filled in without a test: do not sign it, and report to the person responsible for MFK.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    The generator set runs every week, so it has been tested.

    Why is it wrong?

    A no-load run only proves that the engine can start. The transfer switch, panels left behind, and capacity are proven only by a building-load test and a test with a dummy load.

    Common misconception

    Once maintenance is contracted out, the responsibility moves to the contractor.

    Why is it wrong?

    Permenkes 6/2026 allows cooperation with a third party, but the program, the risk register, and the test evidence stay with the hospital through the person responsible for MFK.

    Common misconception

    A full rooftop tank means the water reserve is enough.

    Why is it wrong?

    The reserve is calculated from the daily need multiplied by the number of days, and a rooftop tank without a transfer pump on the generator supply empties within hours.

    Common misconception

    WHO and CDC figures are Indonesian rules.

    Why is it wrong?

    The WHO index is an assessment tool, and the CDC temperatures are United States guidance. Both are comparisons, and their figures can differ from the Permenkes figures, as with the water reserve in Example 1.

    Common misconception

    Accreditation is only about documents.

    Why is it wrong?

    A surveyor uses the documents to see whether tests were actually done, and uniform records without measured values show a process that is not running.

    Chapter 36 · Electrical & Control on generator sets, transfer switches, and standby supply explains the machine tested here, and Chapter 102 · Electrical & Control on electricity in medical rooms covers transfer time. Other systems in the MFK program are covered in Chapter 29 on hospital medical gas systems, Chapter 30 on air conditioning for special hospital rooms, Chapter 103 · Electrical & Control on medical equipment from the building technician’s side, and Chapter 36 · Water & Water Treatment on hospital medical waste. Building clean water is in Chapter 5, backflow in Chapter 11, maintenance strategy in Chapter 11 · Systems, Diagrams & Diagnosis, and reliability in Chapter 10 · Systems, Diagrams & Diagnosis.

    Exercises and worked solutions

    The numbers in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. A 120-bed hospital uses 200 L per bed per day for hygiene and sanitation. What is the minimum volume of the three-day reserve tank?

      Check my answer
      See the worked solution

      The volume is 120×200×3=72,000120 \times 200 \times 3 = 72{,}000 L, that is, 72 m³, because the annex of Permenkes 7/2019 requires a tank of at least 3 times the daily need. If the environmental health unit uses the upper limit of 300 L, the reserve is 108 m³, so the figure to use is decided first.

    2. A hospital tests its generator set under load only once a year during a major service. Does that meet the accreditation standard?

      Check my answer
      See the worked solution

      No, because the accreditation standard requires a test of the standby power source at least once every 6 months, or more often if regulations or the condition of the power source require it. The WHO index even gives a high rating only for a full-load test at least monthly.

    3. The generator load during an outage is 250 kW, the specific consumption is 0.27 L/kWh, and the usable fuel is 3,000 L. For how many hours can the generator set run, and does that meet the 72 hours in the WHO index?

      Check my answer
      See the worked solution

      The fuel rate is 250×0.27=67.5250 \times 0.27 = 67.5 L/hour, so 3,000 L lasts 3,000/67.5=44.43{,}000/67.5 = 44.4 hours. That figure is below 72 hours, so the fuel reserve shortfall is recorded in the risk register and reported to the person responsible for utilities.

    4. At 23:00 the low-level alarm of the rooftop tank sounds, the transfer pump does not run, and the pump panel smells burnt. What does the facility technician do, and who takes over?

      Check my answer
      See the worked solution

      The technician does not open the panel that smells burnt, puts the water emergency plan into action, and reports to the person responsible for utilities and the environmental health unit, which contacts the priority water supplier. The panel is examined by an authorized electrician, because a burnt smell indicates insulation damage that can turn into a fire.

    5. This month there are 45 planned maintenance work orders: 38 completed, 4 postponed for spare parts, and 3 not done without explanation. Calculate the compliance and explain what is recorded.

      Check my answer
      See the worked solution

      The compliance is 38/45×100 %=84.4 %38/45 \times 100\,\% = 84.4\,\%. The four postponed jobs are recorded with the reason and a new date, while the three that disappeared without explanation are reported as a finding, because they hide risk.

    6. A surveyor finds six months of generator test sheets in the same handwriting, with identical voltage and frequency values and an empty load column. What is the problem?

      Check my answer
      See the worked solution

      Identical values and the same handwriting suggest that the sheets were probably filled in without a test, and an empty load column means the load was never measured. Sheets like that prove nothing, so the finding is reported to the person responsible for MFK and the test is repeated with a complete record.

    References

    External sources

    • Peraturan Menteri Kesehatan Nomor 6 Tahun 2026 tentang Rumah Sakitjdih.kemkes.go.id
    • Keputusan Menteri Kesehatan Nomor HK.01.07/Menkes/1596/2024 tentang Standar Akreditasi Rumah Sakitjdih.kemkes.go.id
    • Peraturan Menteri Kesehatan Nomor 7 Tahun 2019 tentang Kesehatan Lingkungan Rumah Sakitjdih.kemkes.go.id
    • Peraturan Menteri Kesehatan Nomor 3 Tahun 2026 tentang Penanggulangan Penyakitjdih.kemkes.go.id
    • Hospital safety index: guide for evaluatorsiris.who.int
    • Part II. Recommendations for Environmental Infection Control in Health-Care Facilitiescdc.gov
    • Hospital emergency response checklist: an all-hazards tool for hospital administrators and emergency managersiris.who.int
    • D. Watercdc.gov

    Revision history

    DateVersionChange
    November 11, 20261First published

    How to cite

    Kurnia (2026). Hospital facility and utility management: critical utilities, maintenance planning, generator set and transfer switch testing, clean water and hot water, emergency preparedness, and records and accreditation. ARSTEMA Academy. Revised November 11, 2026. arstema.com/en/academy/konsep/manajemen-fasilitas-dan-utilitas-rumah-sakit-utilitas-kritis-rencana-pemeliharaan-uji-genset-dan-sakelar-alih-air-bersih-dan-air-panas-kesiapan-darurat-serta-catatan-dan-akreditasi

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated
    1

    A 120-bed hospital uses 200 L per bed per day for hygiene and sanitation. What is the minimum volume of the three-day reserve tank?

    2

    A hospital tests its generator set under load only once a year during a major service. Does that meet the accreditation standard?

    3

    The generator load during an outage is 250 kW, the specific consumption is 0.27 L/kWh, and the usable fuel is 3,000 L. For how many hours can the generator set run, and does that meet the 72 hours in the WHO index?

    Self-assessment progress0%