    Electricity in medical rooms

    room groups 0, 1, and 2, medical IT systems and insulation monitoring, alternative supply and changeover time, equipotential bonding, periodic testing, and work boundaries

    The yellow insulation-monitoring lamp in an intensive care unit lights up at night, and a nurse asks the technician on duty to switch off its sound. This chapter explains why electricity in medical rooms is treated differently from ordinary building electricity: a patient connected to an applied part can be harmed by currents far smaller than the danger limit for a healthy person, and loss of supply in certain rooms can be fatal. It covers room groups 0, 1, and 2, the touch-voltage limit and RCDs, medical IT systems and insulation monitoring devices, changeover-time classes of the alternative supply, supplementary equipotential bonding, initial and periodic verification, and the division of work among building technicians, licensed installers, electromedical technicians, and medical staff. The technical figures come from Permenkes 2306/2011, which as of November 2026 is recorded as revoked by Permenkes 6/2026 with no technical replacement found, so its status is stated as it is.

    High-risk material

    This material involves real hazards. A concept explanation doesn’t replace site procedures, competency, energy isolation, the latest SDS, or a work permit.

    Section you’re reading: Chapter opening

    At two in the morning, a small panel on the wall of a hospital intensive care unit starts to sound, and next to its green lamp a yellow lamp is now lit. The nurse on duty phones the electrical technician: “Please switch it off, the patients are being disturbed.” Six patients in the room are connected to monitors, infusion pumps, and ventilators, and not a single device has stopped. The sound may be silenced, but the yellow lamp is designed so that it cannot be switched off: the insulation of the room’s supply system has dropped below the threshold, while the supply is deliberately left flowing so that life-support equipment does not go dark.

    Scope

    This chapter covers the fixed electrical installation in medical locations from the building technician’s side. The general basics are not repeated: TN, TT, and IT systems are in Chapter 20 on grounding systems, general equipotential bonding in Chapter 29, insulation testing in Chapter 17, grounding and RCD testing in Chapter 18, RCD types in Chapter 22, generator sets and transfer switches in Chapter 36, isolation and switching off in Chapter 31, the SLO in Chapter 39, work permits in Chapter 76, and the effects of current on the body in Chapter 75 on electrical hazards to the body. Medical devices are in Chapter 103 on medical devices from the building technician’s side, gas outlets in Chapter 29 · Buildings & Facilities on hospital medical gas systems, and the generator test program in Chapter 31 · Buildings & Facilities on hospital facility and utility management.

    The technical details in this chapter follow Permenkes (Minister of Health Regulation) 2306/MENKES/PER/XI/2011 tentang Persyaratan Teknis Prasarana Instalasi Elektrikal Rumah Sakit (technical requirements for hospital electrical installation infrastructure). As of November 2026, JDIH (legal documentation and information network) Kemenkes records that regulation as no longer in force because it was revoked by Article 84 of Permenkes 6/2026 tentang Rumah Sakit (on hospitals), which only requires facilities and infrastructure to meet technical requirements in accordance with laws and regulations; no replacement technical regulation containing these figures has been found. The figures in this chapter are used to understand the technical reasoning; the requirements binding on a given building are checked against the PUIL edition in force, the hospital’s design documents, and the supervising authority.

    This chapter gives no steps for live work, for switching off or connecting circuits in a room that is in use by patients, for changing the settings of the insulation monitor, or for testing equipment connected to a patient. That work belongs to authorized installers and electrical technicians, electromedical technicians, and medical staff; the building technician recognizes conditions, records them, keeps the alarms working, and reports.

    Why medical rooms are different

    A healthy person who touches a live part is protected by their skin, which has a high resistance. Patients often lose that protection because their skin is pierced by an infusion needle, a catheter, or an electrode.

    Applied part is a part of medical electrical equipment that, in normal use, needs physical contact with the patient for the equipment to work, can be brought into contact with the patient, or needs to be touched by the patient. Intracardiac procedure is a procedure that places an electrical conductor inside the patient’s heart or possibly in contact with it, while that conductor is accessible from outside the body, for example a pacemaker electrode or an insulated tube filled with conductive fluid.

    When skin resistance is bypassed by an infusion, a catheter, or exposed pacemaker leads, the patient becomes sensitive to microshock, the condition in which current entering directly near the heart produces the same effect as a current about a thousand times larger passing through the skin. During open-heart surgery, currents as small as 20 µA can be used to stop the heart. For patients like this, the current thresholds in Chapter 75 shift down to microamperes.

    The second reason is continuity. In an operating room or an intensive care unit, loss of supply can stop a ventilator or a pump that keeps a patient alive. The installation of a medical room therefore balances two demands: leakage current must be very small, but the supply must not be easily interrupted.

    Room groups 0, 1, and 2

    Medical location is a location intended for diagnosis, treatment (including cosmetic treatment), monitoring, and care of patients. Medical locations are divided into three groups according to how applied parts are used:

    GroupMeaningExamples from the guidance table
    0no applied parts are intended to be usedwaiting room, outpatient registration room
    1applied parts are used externally or inserted into any part of the body, except those that belong to group 2inpatient room, examination room
    2applied parts are used for intracardiac procedures, operating or surgical rooms, and vital treatment where failure of the supply can cause deathoperating room, intensive care unit, burns unit

    The example table in the regulation is only guidance, because room use differs between hospitals. Classification is decided by agreement with the medical staff, who indicate which procedures will be carried out in the room, and the possibility of a use that calls for a higher group is decided through risk management. For the building technician, the room group is read from the design documents and the room signage, not guessed from the room name. A procedure room converted into a cardiac catheterization room moves up a group, and its installation is adapted before it is used.

    Shock protection in groups 1 and 2

    Basic protection in medical locations may only take the form of insulation of live parts or barriers and enclosures; protection by obstacles and by placing out of reach is not permitted. SELV and PELV extra-low-voltage circuits in groups 1 and 2 are limited to 25 V a.c. rms or 60 V ripple-free d.c. The TN-C system is not permitted in medical locations and medical buildings downstream of the main distribution board; its combined neutral and protective conductor carries load current along the path that serves as the potential reference for equipment enclosures.

    The conventional touch-voltage limit in groups 1 and 2 is lowered to 25 V, half of the 50 V used in ordinary installations. For a TT system with an RCD, the condition is written as in Chapter 18 on grounding and RCD testing:

    RA×IΔn≤ULR_\text{A} \times I_{\Delta\text{n}} \le U_\text{L}

    where RAR_\text{A} is the grounding resistance of the equipment enclosure and its protective conductor in ohms, IΔnI_{\Delta\text{n}} is the rated residual operating current of the RCD in amperes, and ULU_\text{L} is the touch-voltage limit in volts. This formula assumes that all of the fault current passes through RAR_\text{A} and is not used to assess microcurrents to the heart.

    In a TN system, final circuits up to 32 A in group 1 use an RCD with a residual operating current of at most 30 mA as additional protection. In group 2 the rule is reversed: a 30 mA RCD is used only for circuits supplying the operating table, X-ray units, equipment above 5 kVA, and non-critical equipment that is not life support, because a trip on a life-support circuit is itself the hazard. Where an RCD is required in group 1 or 2, only type A or type B is chosen, according to the fault current that may arise (Chapter 22).

    Medical IT systems and insulation monitoring devices

    Medical IT system is an IT electrical system with specific requirements for medical use. In group 2, this system supplies medical electrical equipment for life support, surgical applications, and other equipment in the patient environment, except the RCD-protected circuits above, and each group of rooms serving the same function needs at least one separate medical IT system.

    A medical IT system is formed by an isolating transformer whose secondary is not grounded. A first insulation fault carries only a small current, because its return path runs through the insulation resistance of the other conductor to ground. If cable capacitance is neglected,

    Id≈U0RisoI_\text{d} \approx \frac{U_0}{R_\text{iso}}

    where IdI_\text{d} is the first-fault current in amperes, U0U_0 is the secondary voltage in volts, and RisoR_\text{iso} is the insulation resistance of the healthy conductor to ground in ohms. A current that small does not operate the protective device, so the equipment keeps working, but its safety reserve is gone: a second fault on the other conductor becomes a short circuit through the equipment enclosures (Chapter 20).

    So that the first fault is detected, every medical IT system is fitted with an insulation monitoring device (IMD; Indonesian gawai monitor insulasi, GMI) with these requirements:

    1. internal a.c. impedance of at least 100 kΩ;
    2. test voltage of not more than 25 V d.c.;
    3. injected current, even under fault conditions, of not more than 1 mA peak;
    4. indication at the latest when the insulation resistance falls to 50 kΩ, and the device is fitted with a test button.

    Its alarm panel is always visible and audible to the medical staff: a green lamp for normal operation, a yellow lamp that lights when the insulation resistance reaches the minimum setting and cannot be cancelled or disconnected, an audible alarm that may be silenced, and a yellow lamp that goes out by itself once the fault has cleared. In the opening case, the sound may be silenced, but the yellow lamp stays lit until the fault has been removed.

    The medical IT transformer sits in a cabinet or enclosure near, inside, or outside the medical location, with a secondary voltage of not more than 250 V a.c.; for group 2, the leakage current of the output winding and the enclosure without load must not exceed 0.5 mA, and its single-phase transformers are rated 0.5 to 10 kVA. Overload and high temperature of the transformer are monitored, and overload protection is not permitted on the feeders upstream and downstream of the transformer. Another chapter of the same regulation gives different figures (secondary at most 230 V, rating 3.15 to 8 kVA), so the figures for a given room are read from the design documents and the transformer nameplate.

    Outlets on the medical IT system in a room that also has TN-S or TT circuits are made so that they cannot be used on the other system or are marked clearly and permanently, and at each patient care position the outlets are supplied by at least two separate circuits or protected one by one, so that a single tripped device does not cut off all the equipment at one bed.

    Alternative supply and changeover-time classes

    Changeover time is the interval between the loss of the normal supply and the availability of supply from the source for safety services. That source is classified by its automatic changeover time:

    ClassAutomatic supply available
    0without interruption
    0.15within 0.15 seconds
    0.5within 0.5 seconds
    15within 15 seconds
    more than 15in more than 15 seconds

    “Within” means less than or equal to. The safety supply takes over automatically when the voltage at the main distribution board drops by more than 10 percent on one or more conductors.

    Operating-table lamps and other essential luminaires, for example for endoscopy, are maintained by a dedicated source with a changeover time of not more than 0.5 seconds for at least 3 hours. Class 15 equipment, including safety lighting and group 2 medical electrical equipment for surgery or other vital procedures specified by the medical staff, is connected within 15 seconds to a source that lasts at least 24 hours when the voltage drops by more than 10 percent for more than 3 seconds; the 24 hours may be reduced to 3 hours if procedures can be stopped and the building evacuated sooner. Sterilization, air conditioning, refrigeration, cooking equipment, and battery chargers may wait more than 15 seconds.

    Safety lighting with a changeover time of at most 15 seconds covers escape routes, exit signs, the location of the generator panel and main panel, and medical rooms: in group 1 at least one luminaire per room, in group 2 at least 50 percent of the lighting. The generator set is designed to pick up the load with stable voltage and frequency within 10 seconds after the normal supply is lost. The 2022 regulation on hospital building requirements, revoked by the same article, required a generator set with changeover of at most 15 seconds plus a UPS with batteries for at least 15 minutes.

    As a result, a generator set alone is never enough for a class 0.5 load. An operating lamp that goes dark for 10 seconds waiting for the generator does not meet the requirement; that gap is closed by a battery or UPS in the path of that load (Chapter 36).

    Supplementary equipotential bonding

    Microshock does not need a dangerous voltage. A potential difference of a few tens of millivolts between metal objects around a patient with a catheter in the heart is already enough to drive a current of microamperes, and the remedy is to keep all conductive parts around the patient at almost the same potential.

    Supplementary equipotential bonding is a conductor that connects conductive parts in the patient environment to one busbar so that the potential difference between them is as small as possible. In group 1 and 2 locations, the parts bonded are protective conductors, extraneous conductive parts, electrical interference screens, conductive floor grids, and the metal screen of the isolating transformer if present; fixed non-electrical patient supports, such as the operating table, should also be connected.

    In group 2, the resistance of the conductor together with its connections between the protective terminal of an outlet, fixed equipment, or an extraneous conductive part and the bonding busbar must not exceed 0.2 Ω. The busbar is located inside or near the medical location, and each of its connections is clearly visible and easy to disconnect one by one. The older chapter of the regulation adds that in group 2 rooms, within 2.5 m of the patient position, the voltage difference between the busbar and fixed equipment must not be more than 10 mV under fault conditions, and that the 0.2 Ω limit with a 2.5 mm² copper conductor means a length of at most 20 m.

    The resistance of a conductor is calculated with

    R=ρLAR = \rho \frac{L}{A}

    where RR is the resistance in ohms, ρ\rho is the resistivity of copper in Ω mm²/m, LL is the length in meters, and AA is the cross-sectional area in mm². The contact resistance of terminals is not included, even though it can be a significant part of the 0.2 Ω limit. Outlets and switches are installed at least 0.2 m from every medical gas outlet, measured center to center, to reduce the risk of ignition.

    Initial and periodic verification

    The date and result of every verification must be recorded. Before commissioning, and after alterations or repairs, there are five checks alongside the general PUIL tests: functional test of the IMD and alarm, measurement of supplementary equipotential bonding, verification of the integrity of the bonding facilities, verification of the safety services, and measurement of the leakage current of the medical IT transformer without load.

    Where there is no more specific regional or national regulation, the recommended periodic intervals are as follows.

    CheckInterval
    functional test of the changeover device12 months
    functional test of the IMD12 months
    visual check of protective device settings12 months
    measurement of supplementary equipotential bonding36 months
    verification of the integrity of the equipotential bonding facilities36 months
    monthly functional test of battery-powered sources15 minutes
    monthly functional test of combustion-engine sourcesuntil rated running temperature is reached
    endurance test of combustion-engine sources12 months, 60 minutes
    capacity test of battery-powered sourcesperiodic, no number of months in the text
    measurement of IT transformer leakage current36 months
    RCD trip check at IΔnI_{\Delta\text{n}}at least every 12 months

    In tests of the safety source, 50 to 100 percent of rated power is taken over. The text of the regulation writes the RCD interval as “not less than 12 months”; this chapter reads it as at least once every 12 months, and that reading is confirmed with the person responsible for the installation. How to test insulation and RCDs is in Chapter 17 and Chapter 18.

    Work boundaries and who does what

    Work in medical rooms is divided by authority, because a single mistake can reach the patient directly.

    • Medical staff decide the procedures in the room, and from that the room group and the life-support equipment. Medical staff also decide when equipment may be disconnected from a patient.
    • Authorized installers and electrical technicians design, install, modify, and test the installation, including bonding measurements, IMD tests, and changeover tests, under a work permit and in coordination with the head of the unit (Chapter 39).
    • Electromedical technicians handle medical devices, including their electrical safety tests (Chapter 103).
    • Building technicians read the alarm panels and signage, record events, make sure the yellow lamp is not covered, check that there are no multi-outlet adapters or extension cord reels at patient beds, prepare access to the panel, and report.

    The building technician’s checks are limited to what can be seen without opening a panel, including test records that are overdue. Opening a group 2 room panel, touching bonding terminals, or pressing the IMD test button in a room with patients is not their job.

    Worked example

    The numbers in the examples below are practice numbers, unless their origin is stated.

    Example 1: millivolt potential differences and microcurrents. The bed frame and the infusion stand in a group 2 room differ in potential by 50 mV because the bonding of the infusion stand has come loose. If the current path through a catheter to the patient’s heart has a resistance of 500 Ω, the current is I=0.05/500=0.0001I = 0.05/500 = 0.0001 A, that is, 100 µA, five times the 20 µA that is enough to stop the heart in open surgery. With the bonding intact and the potential difference held to 10 mV, the current is 0.01/500=0.000020.01/500 = 0.00002 A, that is, 20 µA. This is why the limit is written in millivolts, and why a loose bonding conductor is reported even though no one has felt a shock.

    Example 2: the 25 V touch-voltage limit and grounding resistance. In a group 1 room with a TT system and a 30 mA RCD, the condition RA×IΔn≤25R_\text{A} \times I_{\Delta\text{n}} \le 25 V gives RA≤25/0.03=833R_\text{A} \le 25/0.03 = 833 Ω, while in an ordinary room the limit is 50/0.03=1,66750/0.03 = 1{,}667 Ω. A measured result of 1,000 Ω passes for an ordinary room but fails for a group 1 room, so a measurement is always read together with the room group.

    Example 3: first-fault current and the IMD threshold. A 230 V medical IT system in an intensive care unit initially has an insulation resistance of 2 MΩ, so the first-fault current is roughly Id≈230/2,000,000=0.000115I_\text{d} \approx 230/2{,}000{,}000 = 0.000115 A or 0.115 mA. A pinched infusion-pump cable lowers the insulation resistance to 50 kΩ, the IMD indication threshold, and the current becomes 230/50,000=0.0046230/50{,}000 = 0.0046 A or 4.6 mA. Nothing goes dark, but the system is now one fault away from a short circuit, so the fault is located by authorized personnel together with the unit staff.

    Example 4: length of the bonding conductor. A 2.5 mm² copper conductor 20 m long with ρ=0.0175\rho = 0.0175 Ω mm²/m has a resistance of 0.0175×20/2.5=0.140.0175 \times 20/2.5 = 0.14 Ω. Adding two terminal connections of 0.03 Ω each, the total is 0.14+0.06=0.200.14 + 0.06 = 0.20 Ω, exactly at the 0.2 Ω limit. A new route 25 m long gives 0.0175×25/2.5+0.06=0.2350.0175 \times 25/2.5 + 0.06 = 0.235 Ω and fails. With 4 mm² on the same route, 0.0175×25/4+0.06=0.1690.0175 \times 25/4 + 0.06 = 0.169 Ω and it complies; the choice of conductor or additional busbar is the installation designer’s decision.

    Example 5: a generator set is not enough for the operating lamp. The generator set picks up the load within 10 seconds after the PLN (Indonesia’s state electricity company) supply is lost, while the operating lamp needs class 0.5, so the gap of 10−0.5=9.510 - 0.5 = 9.5 seconds is closed by another source. A 300 W operating lamp that must last 3 hours needs an energy of 300×3=900300 \times 3 = 900 Wh at the output. If the inverter efficiency is 0.85, the battery must deliver 900/0.85=1,059900/0.85 = 1{,}059 Wh; at a battery voltage of 48 V that is equivalent to 1,059/48=22.11{,}059/48 = 22.1 Ah, and if the battery may only be discharged to 80 percent, its rated capacity is at least 22.1/0.8=27.622.1/0.8 = 27.6 Ah.

    Example 6: an overdue verification schedule. The records of an operating room as of November 2026: last IMD test July 2025, bonding measurement March 2023, IT transformer leakage current December 2023, and changeover test October 2025. Their due dates: IMD July 2026 (four months overdue), bonding March 2026 (eight months overdue), transformer leakage current December 2026 (not yet), and changeover October 2026 (one month overdue). The building technician does not carry out the tests, but hands those three findings to the person responsible for the installation to be scheduled together with the head of the operating suite.

    Stop conditions

    1. The yellow IMD lamp is lit or the insulation alarm is sounding: do not cover or disconnect the yellow lamp and do not switch off the room supply; silence the sound if necessary, inform the head of the unit and the person responsible for the electrical installation, and hand the fault search to an authorized electrical technician working together with the medical staff.
    2. The work involves a shutdown, opening a panel, or switching off a circuit in a group 1 or 2 room that is in use by patients: postpone it until there is a work permit and the approval of the head of the unit or the physician in charge; the work is done by authorized personnel (Chapter 76 and Chapter 31).
    3. Someone asks for live work on the grounds that the room cannot be shut down: refuse and report to the person responsible for the installation; live work is not done by the building technician.
    4. The operating lamp or essential luminaires do not come back on within the time of their class, or their battery does not last through the test: report it as a critical finding to the person responsible for the installation and the head of the operating suite; the repair is done by an authorized power-supply technician.
    5. The generator set or transfer switch fails to pick up the load during a test or an outage: report to the person responsible for the generator set and follow the hospital emergency plan (Chapter 36 and Chapter 31 · Buildings & Facilities).
    6. An equipotential bonding conductor appears loose or broken, or a measured bonding resistance exceeds the limit: mark the location, do not reconnect it yourself, and report to the person responsible for the installation.
    7. A multi-outlet adapter or an extension cord reel is found supplying equipment at a patient bed, or non-medical equipment is plugged into a medical IT outlet: do not unplug equipment that is connected to a patient; report to the head of the unit and the electromedical technician.
    8. The medical IT transformer gives an overload or high-temperature alarm, smells of burning, or is abnormally hot: do not open its cabinet; inform the head of the unit and the person responsible for the installation.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    A yellow IMD lamp means a short circuit, so the supply must be cut immediately.

    Why is it wrong?

    The yellow lamp indicates a first insulation fault. The supply is deliberately left flowing so that life-support equipment keeps working, and the fault is located and removed before a second fault occurs.

    Common misconception

    A 30 mA RCD is safest, so fit it on every circuit in the operating room.

    Why is it wrong?

    In group 2, RCDs are only for certain circuits such as the operating table and X-ray. Life-support circuits are supplied by the medical IT system because a trip on the first fault would itself endanger the patient.

    Common misconception

    There is a generator set, so all critical loads are safe when PLN fails.

    Why is it wrong?

    The generator set picks up the load within seconds. Operating lamps and essential luminaires need class 0.5, which can only be achieved by a battery or UPS in the path of that load.

    Common misconception

    If no one feels a shock, a small potential difference is not dangerous.

    Why is it wrong?

    A patient with a catheter or electrode near the heart is sensitive to microampere currents, which a potential difference of tens of millivolts can drive.

    Common misconception

    The room group can be read from the room name.

    Why is it wrong?

    The example table in the regulation is only guidance. The group is decided from the procedures carried out, together with the medical staff, and read from the design documents.

    Chapter 20 on grounding systems explains the first and second faults of an IT system. Chapter 103 on medical devices from the building technician’s side continues to the equipment plugged into this room’s outlets, Chapter 29 · Buildings & Facilities on hospital medical gas systems covers the gas outlets that keep their distance from electrical devices, and Chapter 31 · Buildings & Facilities on hospital facility and utility management places generator tests and test records within the maintenance program.

    Exercises and worked solutions

    The numbers in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. An outpatient examination room is to be used for temporary cardiac catheter placement. What does this mean for the room group, and who decides it?

      Check my answer
      See the worked solution

      Placing a catheter into the heart is an intracardiac procedure, so the room becomes group 2 and needs a medical IT system, stricter bonding, and a class 0.5 supply for essential luminaires. The group is decided together with the medical staff who indicate the procedure, and the installation is adapted by the designer and installer before the room is used.

    2. In a 230 V medical IT system, the insulation resistance falls from 1 MΩ to 100 kΩ. Calculate the first-fault current before and after, and explain whether the IMD should already have given an indication.

      Check my answer
      See the worked solution

      Before, 230/1,000,000=0.00023230/1{,}000{,}000 = 0.00023 A or 0.23 mA; after, 230/100,000=0.0023230/100{,}000 = 0.0023 A or 2.3 mA. The indication must appear at the latest at 50 kΩ, so at 100 kΩ the IMD has not necessarily given an indication; the threshold depends on the setting recorded in the installation documents.

    3. A head of unit asks for the yellow lamp of the insulation alarm panel to be covered with tape because it is glaring. What is the technician’s answer?

      Check my answer
      See the worked solution

      The yellow lamp is deliberately made so that it cannot be cancelled or disconnected, so that an insulation fault is always visible, so the lamp is not covered. What may be done is to silence the sound and report the fault so that it is removed by authorized personnel.

    4. A 2.5 mm² copper bonding conductor is 18 m long with two connections of 0.03 Ω each. Does it meet 0.2 Ω? Use ρ=0.0175\rho = 0.0175 Ω mm²/m.

      Check my answer
      See the worked solution

      0.0175×18/2.5=0.1260.0175 \times 18/2.5 = 0.126 Ω, plus 0.06 Ω gives 0.186 Ω, below 0.2 Ω. The remaining margin is only 0.014 Ω, so a loose connection can make it fail at the next measurement.

    5. Why is the ventilator circuit in an intensive care unit not given a 30 mA RCD, while the operating table circuit may be?

      Check my answer
      See the worked solution

      A ventilator is life-support equipment, and an RCD trip on the first fault would stop it, so its circuit is supplied by the medical IT system, which keeps flowing on the first fault. The operating table is on the list of circuits that may have an RCD because losing the operating table supply does not directly stop a life-support function.

    6. A monthly test shows that the battery source of the operating lamp comes back on within 0.3 seconds but goes out after 2 hours. What is the conclusion, and to whom is it reported?

      Check my answer
      See the worked solution

      The changeover time meets class 0.5, but the endurance is less than the 3 hours required for operating-table lamps. This is reported as a critical finding to the person responsible for the installation and the head of the operating suite, and the battery is repaired or replaced by an authorized power-supply technician.

    References

    External sources

    • Peraturan Menteri Kesehatan Nomor 2306/MENKES/PER/XI/2011 tentang Persyaratan Teknis Prasarana Instalasi Elektrikal Rumah Sakitjdih.kemkes.go.id
    • Peraturan Menteri Kesehatan Nomor 6 Tahun 2026 tentang Rumah Sakitjdih.kemkes.go.id
    • Peraturan Menteri Kesehatan Nomor 40 Tahun 2022 tentang Persyaratan Teknis Bangunan, Prasarana, dan Peralatan Kesehatan Rumah Sakitjdih.kemkes.go.id
    • College Physics 2eopenstax.org

    Revision history

    DateVersionChange
    November 11, 20261First published

    How to cite

    Kurnia (2026). Electricity in medical rooms: room groups 0, 1, and 2, medical IT systems and insulation monitoring, alternative supply and changeover time, equipotential bonding, periodic testing, and work boundaries. ARSTEMA Academy. Revised November 11, 2026. arstema.com/en/academy/konsep/listrik-ruang-medis-kelompok-ruang-0-1-dan-2-sistem-it-medis-dan-pemantau-isolasi-catu-pengganti-dan-waktu-alih-ikatan-ekuipotensial-pengujian-berkala-serta-batas-pekerjaan

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated

    Safety limits still apply. This quiz tests reasoning; it doesn’t authorize mixing, adjusting, dismantling, live measurement, or field action.

    1

    An outpatient examination room is to be used for temporary cardiac catheter placement. What does this mean for the room group, and who decides it?

    2

    In a 230 V medical IT system, the insulation resistance falls from 1 MΩ to 100 kΩ. Calculate the first-fault current before and after, and explain whether the IMD should already have given an indication.

    3

    A head of unit asks for the yellow lamp of the insulation alarm panel to be covered with tape because it is glaring. What is the technician’s answer?