    Safety · Chapter 14Quantitative

    By Kurnia · Published November 15, 2026 · Version 1 · 21 min read

    Fire evacuation drills in hotels

    emergency response plans, the engineering team’s role, alarms and announcements, calculating evacuation time, assembly points, and drill evaluation

    During an evacuation drill at a 12-story hotel, the final exit door of one stairway was blocked by a linen trolley, two laundry staff did not hear the alarm, and the head count at the assembly point was completed only fourteen minutes after the alarm sounded. This chapter covers fire evacuation drills from the building technician’s side: emergency response plans and the fire response unit under Kepmenaker KEP.186/MEN/1999, the engineering team’s role during an alarm and during a drill, alarms and announcements, how to estimate evacuation time from reaction time, travel distance, and the capacity of doors and stairs, assembly points and head counts, and planning and evaluating drills. The figures for escape route capacity, escape time, and travel distance come from the UK government’s fire risk assessment guides for sleeping accommodation and large places of assembly, and are presented as UK data. Designing escape routes, configuring the alarm system, and leading firefighting are stated to be the work of designers, alarm contractors, the fire response unit, and the fire department.

    Section you’re reading: Chapter opening

    At 10:00 on a Tuesday, a 12-story hotel ran an evacuation drill that had been announced a week earlier. The alarm sounded, the evacuation announcement was heard in the guest room corridors, and most staff went down the two fire stairways. At the bottom of stairway B, the final exit door opened only halfway because a linen trolley had been parked outside, so the flow of people was held up. Two laundry staff in the basement came out only after someone fetched them, because the sounder in the washing machine room could not be heard over the machines. The last person left the building seven minutes after the alarm, but the attendance list at the assembly point was complete only fourteen minutes after the alarm, because the per-shift staff list had not been brought. The technician acting as an observer needs to know what is being tested, how long the evacuation should take, and how findings become improvements.

    Scope

    This chapter covers fire evacuation drills in hotels from the building technician’s side: emergency response plans and the fire response unit, the engineering team’s role during an alarm and during a drill, alarms and announcements as part of the drill, how to estimate evacuation time, assembly points and head counts, and planning and evaluating drills.

    The fire alarm system is covered in Chapter 19 · Buildings & Facilities to Chapter 23 · Buildings & Facilities: the panel, detectors, wiring, power supply and warning devices, and periodic testing. Sound systems and voice evacuation announcements are in Chapter 109 · Electrical & Control on building sound and paging systems, emergency lighting and exit signs in Chapter 106 · Electrical & Control, lift emergency response in Chapter 25 · Buildings & Facilities, fire protection and fire pumps in Chapter 17 · Buildings & Facilities, fire doors and door closers in Chapter 38 · Buildings & Facilities, automatic lobby doors in emergency mode in Chapter 43 · Buildings & Facilities, and incident investigation in Chapter 12. Visual alarms and tactile guidance paths are in the R23 chapter on building accessibility (Chapter 46 · Buildings & Facilities), and AEDs and first aid boxes in the R23 chapter on AEDs and first aid boxes (Chapter 15).

    Outside the building technician’s authority: designing or altering escape routes, door widths, and stairways; setting the building’s risk classification; changing the settings, zones, or logic of the alarm panel; isolating detectors or silencing sounders outside the procedure in Chapter 19 · Buildings & Facilities; fighting a real fire without training; and operating lifts for evacuation. That work belongs to the building’s designers and technical assessors, alarm contractors, the trained fire response unit, lift contractors, and the fire department.

    Emergency response plans and the fire response unit

    An emergency response plan is a written document that sets out how people are warned, who does what, which routes people take out, where they assemble, and how the fire department is called and met. An evacuation drill tests this plan; without a written plan, a drill only tests habits.

    In Indonesia, Kepmenaker (Minister of Manpower Decree) KEP.186/MEN/1999 on fire response units in the workplace requires the management or employer to prevent, reduce, and extinguish fires. That obligation includes, among other things, providing detection, alarm, extinguishing, and evacuation facilities, forming a fire response unit, holding fire response exercises and drills periodically, and a fire emergency response plan book for workplaces that employ more than 50 workers or have a medium or high fire hazard potential. The plan book contains information on hazard sources and their prevention, the types and maintenance of fire protection facilities, work procedures related to fire prevention, and procedures for dealing with emergencies. As of November 2026, JDIH Kemnaker lists this decree as in force.

    The decree’s annex places hotel, restaurant, and hospital buildings in the light fire hazard class, but laundries and parking areas in medium fire hazard class 1 and warehousing in medium class 3. A hotel with a laundry, basement parking, and storerooms is therefore not automatically “light” throughout. The classification used is set by the management together with a K3 expert or the labor inspector, not guessed by the technician.

    The fire response unit consists of fire role officers, a fire response team, a unit coordinator, and a K3 (occupational safety and health) fire specialist as the person technically responsible. The numbers are set as follows:

    Unit elementRequired number
    Fire role officersat least 2 persons for every 25 workers
    Unit coordinatorlight and medium I hazard: at least 1 person for every 100 workers; medium II, medium III, and high: at least 1 person for every work unit
    Fire response team and K3 fire specialistlight and medium I hazard employing 300 persons or more, or every workplace with medium II, medium III, and high hazard

    The duties of fire role officers include extinguishing fires at the initial stage and directing the evacuation of people and goods, and an officer must have completed the basic level I technical fire response course. In a drill, they are the ones who sweep the floors and direct people. The decree does not state how many drills a year; “periodically” is filled in by the hotel’s emergency response plan.

    The UK government’s fire risk assessment guide for sleeping accommodation, including hotels, suggests that the emergency response plan cover, among other things, how people will be warned, how the evacuation is carried out, where people assemble and how to check that the building is empty, arrangements for people especially at risk, and contingency plans for when life safety systems are out of order.

    The engineering team’s role during an alarm and during a drill

    During a real alarm, the duty technician goes to the alarm panel, reads the active zone and address, and reports to the unit coordinator without resetting or isolating anything (Chapter 19 · Buildings & Facilities). Other technicians make sure the fire pump is ready and the monitored valves are open (Chapter 17 · Buildings & Facilities), check that the lifts return to the ground floor under their fire function and are not used by guests (Chapter 25 · Buildings & Facilities), and stand by in the electrical panel room if the procedure requires certain supplies to be shut off. The UK guide includes how to stop machines and processes and isolate power supplies, where appropriate, in staff training. Building drawings, master keys, and information on special hazards are prepared for the fire department.

    For a drill, the engineering team prepares the systems first: the alarm panel is free of faults and isolated zones, the alarm receiving center is informed if the alarm is monitored off-site, and equipment that must not stop suddenly is handled according to procedure. The UK guide suggests starting the drill by asking a randomly chosen member of staff to set off the alarm at the nearest manual call point with the test key, to see whether staff know where it is. After the drill, the panel returns to normal, fire doors are closed again (Chapter 38 · Buildings & Facilities), automatic lobby doors return to normal mode (Chapter 43 · Buildings & Facilities), and the lifts return to service.

    As an observer, the technician records sounders that cannot be heard, exit doors that are hard to open, emergency lights that are out (Chapter 106 · Electrical & Control), loudspeakers that are unclear (Chapter 109 · Electrical & Control), and routes obstructed by goods.

    Alarms and announcements

    The alarm is the start of the evacuation time. Sounders, flashing beacons, and voice announcements must reach every occupied space, including the laundry, kitchen, machine rooms, and rooms of deaf guests. The opening case shows a common failure: the sounder was drowned out by machine noise. Design and testing of sound levels are in Chapter 22 · Buildings & Facilities and Chapter 23 · Buildings & Facilities; a drill finds the places that are not yet reached.

    Simultaneous evacuation is evacuation of the whole building at the same time as soon as the alarm sounds. Phased evacuation is evacuation that gives priority to the most threatened floors or zones, while other zones wait for the next announcement. The choice is set by the building design and the emergency response plan, and voice announcements (Chapter 109 · Electrical & Control) are the main tool of phased evacuation.

    A good announcement is short, repeated, and gives an action: leave by the nearest stairway, do not use the lifts, go to the assembly point. The UK guide asks that staff be trained on the reason for not using lifts, except those specifically installed or nominated for the purpose following a fire risk assessment. Sweeping staff walk the corridors and public areas to direct people to the nearest escape route, not to the route they normally use.

    Calculating evacuation time

    Evacuation time is the interval from the start of a fire until the last person reaches a place of reasonable safety: a protected stairway, another fire compartment that has an exit, or a final exit. That time is divided into three parts:

    tevac=tdetect+tpre+tmovet_{evac} = t_{detect} + t_{pre} + t_{move}

    where tdetectt_{detect} is the time until the fire is detected and the alarm sounds, tpret_{pre} is the pre-movement time, that is, the time people take to notice, gather information, and decide to move, and tmovet_{move} is the time spent walking and queuing to reach a place of reasonable safety, all in seconds or minutes. The UK guide notes that studies of human behavior in emergencies have shown that about two thirds of the time available to escape is taken up by the initial reaction, and the remaining third by actual movement away from the fire. That is why travel distances are limited: the time available for walking is far less than people imagine.

    For large places of assembly, the UK guide gives reasonable escape times of 2 minutes for higher risk premises, 2.5 minutes for normal risk, and 3 minutes for lower risk, and these times are already allowed for in the suggested travel distances. For sleeping accommodation, the suggested travel distances to a place of reasonable safety are as follows:

    RouteBedroom and higher risk areaNormal risk areaLower risk area
    More than one route18 m35 m45 m
    Single route only9 m18 m25 m

    Movement time is estimated from distance and queuing:

    tmove≈Lv+NF×Wt_{move} \approx \frac{L}{v} + \frac{N}{F \times W}

    where LL is the travel distance to the door that forms the constriction (m), vv is walking speed (m/s or m/min), NN is the number of people using that door or stairway, WW is the effective width (m), and FF is the specific flow, the number of people passing through each meter of effective width per minute (persons/(m·min)). The first term is the walking time of the farthest person; the second is the time for the whole queue to pass the constriction. Adding the two gives a simple upper estimate, on the assumption that the queue has already formed when the farthest person arrives. The model does not apply to dense smoke, panicking crowds, or people who need assistance; for those, drill results and the judgment of a competent person are used.

    Effective width is the narrowest clear width along the route; for a door, the clear width when the door leaf is open at right angles to the frame. The UK guide gives general capacities of escape routes by width and risk:

    Width of at leastHigher riskNormal riskLower risk
    750 mm80 persons100 persons120 persons
    1,050 mm160 persons200 persons240 persons

    For each additional 15 persons, or part of 15, the width is increased by 75 mm. An escape route is at least 750 mm wide, except for fewer than five people, and 900 mm where wheelchair users are likely to use it. Stairways are as a general rule at least 1,050 mm wide. Where there is more than one exit, the widest exit is assumed to be unavailable because it has been compromised by fire.

    If the capacity of 100 persons for a width of 750 mm is read as the number of people passing in 2.5 minutes at normal risk, the implied rate is F=100/(0.75×2.5)=53.3F = 100/(0.75 \times 2.5) = 53.3 persons/(m·min). This is this chapter’s interpretation for calculation practice, not a figure in the guide. Flow rates and speeds on stairs are lower than on level floors; their values are chosen by the designer from the applicable design standard.

    Assembly points and head counts

    An assembly point is a place outside the building, far enough from it, where people gather after evacuation so that they can be counted. A good assembly point does not block fire engines, is not under facade glass or on a vehicle road, is large enough, and has a backup if the main one is affected by smoke or bad weather.

    The UK guide asks that a roll call of staff be carried out as soon as possible at the assembly point, or that reports be received from wardens designated to sweep the building, and that anyone unaccounted for be noted. In a real evacuation, that information is passed to the fire department on arrival. In a hotel, the head count combines the per-shift staff list, the list of occupied rooms from the front office, and the list of contractors and event guests, in a form that remains readable during a power outage.

    As long as one person is unaccounted for, the fire department may send a crew inside to search, and that crew bears the danger. That is why the time at which the head count is complete is a key measure of a drill.

    Planning and running a drill

    The UK guide suggests that fire drills be carried out at least annually or as determined by the fire risk assessment, and more often if staff turnover is high. The objectives are set in advance, for example identifying weaknesses in the evacuation strategy, familiarizing new staff with procedures, and testing the arrangements for disabled people. In buildings with more than one escape route, one exit or stairway is treated as unavailable, for example by placing a person at a given point, and the route closed off changes at each drill.

    The same guide suggests informing all staff about the drill and their duty to take part, making sure equipment can be safely left, nominating observers, informing the alarm receiving center, and informing guests who are in the building. Surprise drills may not be beneficial, because the health and safety risks they introduce may outweigh the benefits.

    The night shift usually has the fewest people, while guests are asleep, so drills are not held only on the morning shift. The UK guide notes that a drill provides information such as the time required to waken people. Night staff can rehearse their sequence of duties without waking guests, time how long it takes until every floor has been swept, and record staffing gaps.

    A personal emergency evacuation plan (PEEP) is a written plan for one person who needs assistance, stating who helps, by which route, and with what equipment. The list of rooms of guests who need assistance is kept by the front office and brought to the assembly point.

    Evaluating the drill

    During the drill, the person in charge and the observers pay attention to several points named in the UK guide: communication difficulties during the roll call, use of the nearest escape routes as opposed to common circulation routes, difficulties opening final exit doors, difficulties experienced by people with disabilities, the roles of designated staff, inappropriate actions such as stopping to collect belongings or attempting to use lifts, and windows and doors not being closed as people leave. An on-the-spot debrief after the drill gathers feedback; the observers’ reports are then collated and reviewed, and the conclusions and remedial actions are recorded and implemented.

    Measures that can be compared from drill to drill:

    1. Time from the alarm until the last person leaves the building, per stairway and per final exit.
    2. Time from the alarm until the head count is complete.
    3. Number of people who did not hear the alarm or were slow to move, with their locations.
    4. Equipment findings: sounders, loudspeakers, emergency lights, doors, and obstructed routes.
    5. Number of remedial actions completed before the next drill.

    If the actual time is far above the estimate, the cause is investigated as in incident investigation in Chapter 12: the sequence of events, the queuing points, and people’s decisions. Equipment findings are handled by their owners, for example the alarm contractor for sounders and security for goods on escape routes.

    Worked example

    The figures in the examples below are practice figures, unless their origin is stated.

    Example 1: number of fire response unit officers. A hotel employs 260 workers, and management has classified it as light fire hazard. Fire role officers number at least 2 for every 25 workers. With 260/25=10.4260/25 = 10.4, if an incomplete group is counted as a group, 2×11=222 \times 11 = 22 officers are needed; if only complete groups count, 2×10=202 \times 10 = 20. This chapter uses 22 and asks the labor inspector how to count. The unit coordinator is at least 1 for every 100 workers, that is, 3 persons with the same rounding. A fire response team and K3 fire specialist are not yet required because 260 is below 300, and the emergency response plan book is required because 260 is above 50.

    Example 2: ballroom door capacity. A ballroom holding 420 people has three exit doors with effective widths of 1.05 m, 1.05 m, and 1.80 m, and is assessed as normal risk. A 1.05 m door accommodates 200 persons. The 1.80 m door is wider by 1.80−1.05=0.751.80 - 1.05 = 0.75 m, that is, 750/75=10750/75 = 10 times 75 mm, so it accommodates 200+10×15=350200 + 10 \times 15 = 350 persons. The three together give 200+200+350=750200 + 200 + 350 = 750 persons, but the widest door is assumed unavailable, so the counted capacity is 200+200=400200 + 200 = 400 persons, 20 short of 420. This finding is handed to management and the building’s technical assessor, not decided by the technician.

    Example 3: movement time on a guest room floor. The farthest room is 30 m from the stairway door, walking speed is 1.2 m/s, and the 60 people on that floor use a stairway door 1.05 m wide with F=53.3F = 53.3 persons/(m·min). Walking time is 30/1.2=2530/1.2 = 25 seconds, and queuing time is 60/(53.3×1.05)=1.0760/(53.3 \times 1.05) = 1.07 minutes, that is, 64 seconds. The upper estimate is 25+64=8925 + 64 = 89 seconds. If half the people use the second stairway, queuing time becomes 32 seconds and the estimate drops to 25+32=5725 + 32 = 57 seconds; that is why both stairways must be equally familiar to guests and staff.

    Example 4: how much time is left for walking. With an escape time of 2.5 minutes, that is, 150 seconds, two thirds go to the initial reaction, 23×150=100\tfrac{2}{3} \times 150 = 100 seconds, and the remaining 150−100=50150 - 100 = 50 seconds go to movement. At 1.2 m/s, a person walks only 50×1.2=6050 \times 1.2 = 60 m. A travel distance of 35 m for a normal risk area with two routes leaves 60−35=2560 - 35 = 25 m in reserve for slower people, turns, and queues. This calculation explains the reason for the limit; it does not replace the design.

    Example 5: a fire stairway serving many floors. Ten guest room floors each hold 40 people, so 400 people use one stairway 1.05 m wide with a stair flow of 40 persons/(m·min). The time for the whole queue to pass through the stairway is 400/(40×1.05)=9.5400/(40 \times 1.05) = 9.5 minutes. With two stairways used evenly, the time is 200/(40×1.05)=4.8200/(40 \times 1.05) = 4.8 minutes. This is longer than 2.5 minutes, and multistory buildings do rely on protected stairways: once a person enters a stairway protected by fire doors, they are already in a place of reasonable safety. A stairway door wedged open removes that protection (Chapter 38 · Buildings & Facilities).

    Example 6: reading the drill record and the assembly point area. The drill record: alarm 10:00:00, last person out 10:07:10, head count complete 10:14:00. The time until the last person left is 7×60+10=4307 \times 60 + 10 = 430 seconds, and the head count was complete only 14−7.17=6.8314 - 7.17 = 6.83 minutes later, about 6 minutes 50 seconds. The hotel plan’s target is 6 minutes to leave the building, so the drill was late by 430−360=70430 - 360 = 70 seconds. The assembly point measures 15 m by 12 m, that is, 180 m², and 380 people at 0.5 m² per person need 380×0.5=190380 \times 0.5 = 190 m², 10 m² short. The plan is corrected by dividing people between two assembly points and bringing the per-shift staff list.

    Stop conditions

    1. During the drill, signs of a real fire appear, such as smoke, a burning smell, or the panel shows an alarm from a zone not included in the scenario: end the drill status, treat it as a real fire, and hand command to the fire response unit coordinator, who calls the fire department according to the emergency response plan.
    2. Before the drill, the alarm panel shows a fault or isolated zones, or sounders in part of the building do not sound when tested: postpone the drill and hand the repair to the alarm technician or alarm contractor according to Chapter 19 · Buildings & Facilities and Chapter 23 · Buildings & Facilities.
    3. A final exit door is locked, cannot be opened from inside, or is blocked by goods that cannot be removed at once: direct people to another route, report immediately to the duty manager and security, and do not treat the area as safe to occupy until the door works; fire door repairs according to Chapter 38 · Buildings & Facilities.
    4. Someone falls, faints, or is injured on a stairway or in a corridor: stop the flow of people on that part of the stairway, call a trained P3K (first aid) officer and emergency medical services, and do not move the casualty unless there is immediate danger, according to the R23 chapter on AEDs and first aid boxes (Chapter 15).
    5. Someone is trapped in a lift, or someone intends to use an ordinary lift for evacuation: do not open the lift doors or move the car; call the lift contractor or a person trained to rescue passengers according to Chapter 25 · Buildings & Facilities.
    6. There is a request to silence sounders, isolate detectors, or run the drill without informing the alarm receiving center so that guests are not disturbed: refuse, and hand the decision to the unit coordinator or the K3 fire specialist.
    7. Emergency lights are out in a stairway or the evacuation announcement cannot be heard in a zone: record the location, direct people with sweeping staff, and hand it to the electrical technician or sound system contractor according to Chapter 106 · Electrical & Control and Chapter 109 · Electrical & Control.
    8. The assembly point is affected by smoke or heavy rain, or lies on the fire engine route: move people to the backup assembly point according to the plan, under the direction of security and the unit coordinator.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    A drill is successful if the alarm sounds and everyone gets out.

    Why is it wrong?

    A drill tests the plan: who was late, which door jammed, and how long the head count took. Without observers and records, a drill produces no improvements.

    Common misconception

    Exit capacity is the sum of the capacities of all the doors.

    Why is it wrong?

    Where there is more than one exit, the widest is assumed to be unavailable because it has been compromised by fire, as in Example 2.

    Common misconception

    Evacuation time is the same as the walking time to the door.

    Why is it wrong?

    Most of the available time is taken up by noticing and deciding, so a clear alarm and trained staff shorten an evacuation more than walking fast does.

    Common misconception

    Lifts may be used if they are faster than the stairs.

    Why is it wrong?

    Ordinary lifts are not used during a fire, except lifts specifically installed or nominated for evacuation following a risk assessment.

    Common misconception

    A surprise drill is the most realistic, so it is the best.

    Why is it wrong?

    The risk of falls on stairs, panic, and disruption to running equipment can outweigh the benefits. Drills are announced to staff and run with observers.

    Chapter 19 · Buildings & Facilities to Chapter 23 · Buildings & Facilities on fire alarms provide the signal that starts an evacuation, Chapter 109 · Electrical & Control on sound systems provides the evacuation announcements, Chapter 106 · Electrical & Control on emergency lighting lights the escape routes, Chapter 25 · Buildings & Facilities covers lifts during a fire, and Chapter 12 on incident investigation untangles drill findings. The R23 chapters on building accessibility (Chapter 46 · Buildings & Facilities) and on AEDs and first aid boxes (Chapter 15) complete the plan for guests who need assistance and for casualties.

    Exercises and worked solutions

    The figures in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. A light fire hazard hotel employs 140 workers. What is the minimum number of fire role officers and unit coordinators, and is an emergency response plan book required?

      Check my answer
      See the worked solution

      Fire role officers 2×⌈140/25⌉=2×6=122 \times \lceil 140/25 \rceil = 2 \times 6 = 12 persons, and coordinators ⌈140/100⌉=2\lceil 140/100 \rceil = 2 persons, rounding up as in Example 1. The emergency response plan book is required because there are more than 50 workers, while a response team and K3 fire specialist are not yet required because the number is still below 300.

    2. A normal risk meeting room has two doors with effective widths of 750 mm and 1,050 mm. How many people can be counted as able to get out?

      Check my answer
      See the worked solution

      The widest door, 1,050 mm, is assumed unavailable because it has been compromised by fire. What remains is the 750 mm door with a capacity of 100 persons at normal risk, so only 100 people are counted.

    3. The farthest person walks 32 m at 1.0 m/s, then 45 people pass through a door 0.9 m wide at a rate of 53.3 persons/(m·min). Estimate the movement time.

      Check my answer
      See the worked solution

      Walking time is 32/1.0=3232/1.0 = 32 seconds and queuing time is 45/(53.3×0.9)=0.93845/(53.3 \times 0.9) = 0.938 minutes, that is, 56 seconds. The upper estimate is 32+56=8832 + 56 = 88 seconds, on the assumption that the queue has already formed when the farthest person arrives.

    4. A manager wants a surprise drill at 02:00 without informing the alarm receiving center so that it is “like a real event.” How does the technician respond?

      Check my answer
      See the worked solution

      The UK guide suggests informing the alarm receiving center and considers that surprise drills can carry more risk than benefit, all the more so while guests are asleep. The technician suggests a night staff drill that is announced to staff and has observers, and hands the decision to the unit coordinator.

    5. During a drill, a staff member intends to use a guest lift to take elderly guests down. What should be done?

      Check my answer
      See the worked solution

      Ordinary lifts are not used for fire evacuation, and a drill should practice the same habits as a real event. Staff follow that guest’s personal emergency evacuation plan or the written assistance procedure, and a lift is used only if it is a designated evacuation lift operated by trained people.

    6. At the assembly point, three kitchen staff are missing from the attendance list. What is done in a drill, and how does it differ in a real fire?

      Check my answer
      See the worked solution

      In a drill, the observers record the time and find out by radio or through the sweepers where the three are, and the finding goes into the evaluation. In a real fire, their names and last known locations are handed to the fire department on arrival, and staff do not go back into the building to search.

    References

    External sources

    • Fire safety risk assessment: sleeping accommodationassets.publishing.service.gov.uk
    • Fire safety risk assessment: large places of assemblyassets.publishing.service.gov.uk
    • Keputusan Menteri Tenaga Kerja Republik Indonesia Nomor KEP.186/MEN/1999 tentang Unit Penanggulangan Kebakaran di Tempat Kerjajdih.kemnaker.go.id

    Revision history

    DateVersionChange
    November 15, 20261First published

    How to cite

    Kurnia (2026). Fire evacuation drills in hotels: emergency response plans, the engineering team’s role, alarms and announcements, calculating evacuation time, assembly points, and drill evaluation. ARSTEMA Academy. Revised November 15, 2026. arstema.com/en/academy/konsep/latihan-evakuasi-kebakaran-di-hotel-rencana-tanggap-darurat-peran-tim-teknik-alarm-dan-pengumuman-menghitung-waktu-evakuasi-titik-kumpul-serta-evaluasi-latihan

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated
    1

    A light fire hazard hotel employs 140 workers. What is the minimum number of fire role officers and unit coordinators, and is an emergency response plan book required?

    2

    A normal risk meeting room has two doors with effective widths of 750 mm and 1,050 mm. How many people can be counted as able to get out?

    3

    The farthest person walks 32 m at 1.0 m/s, then 45 people pass through a door 0.9 m wide at a rate of 53.3 persons/(m·min). Estimate the movement time.