    Building distribution transformers

    oil-filled and dry types, rating and loading, temperature and cooling, visual and oil inspection, losses and efficiency, and records

    After a new chiller and imaging equipment are installed, a hospital technician records the oil temperature indicator on a 1,000 kVA transformer far higher than the month before, an oil stain under a valve, rainwater in the containment pit, and ventilation louvers blocked by cardboard, while the peak load approaches 89 percent of rating. This chapter covers building distribution transformers from the technician’s side: nameplate data, oil-filled and dry-type transformers, a kVA rating set by temperature, loading and overload, insulation classes and temperature rise, cooling methods, the visual inspection that can be made from outside, oil testing by authorized parties, PCBs in old transformers, no-load and load losses, efficiency and the United States efficiency standards, annual energy losses, oil containment pits, and transformer records. It draws on United States military facility criteria and maintenance guidance, United States Department of Energy efficiency rules, EPA, and Indonesian regulations on distribution, electricity safety, and electrical OHS. Opening the transformer, taking oil samples or topping up oil, changing taps, and testing the transformer are stated as work for PLN or for certified electrical OHS personnel working under a work permit.

    High-risk material

    This material involves real hazards. A concept explanation doesn’t replace site procedures, competency, energy isolation, the latest SDS, or a work permit.

    Section you’re reading: Chapter opening

    A 280-bed hospital adds a chiller and an imaging room during the dry season. Three weeks later, on the midday round, the electrical technician records the oil temperature indicator on the 1,000 kVA transformer in the backyard substation reading 18 °C higher than the record at the same hour the month before. There is an oil stain under the drain valve, the containment pit under the transformer holds rainwater, and the substation ventilation louvers are blocked by a pile of cardboard from the new equipment packaging. The currents at the main distribution board show a load of about 89 percent of the transformer rating. The engineering manager asks whether the transformer has to be replaced at once.

    The technician opens nothing and does not top up the oil. They photograph the indicator, record the room temperature and the currents, then report to the technical officer in charge, who calls in the transformer maintenance contractor to take an oil sample and check for leaks. The answer to the manager’s question depends on what the kVA rating means, how load relates to temperature, how to read a transformer from outside, and the losses actually being paid for.

    Scope

    This chapter covers building distribution transformers that step 20 kV down to 400/230 V, from the building technician’s side: nameplate data, oil-filled and dry types, rating and loading, temperature and cooling, visual inspection, transformer oil, losses and efficiency, and records. It is learning material, not a work instruction. This chapter contains no steps for opening a transformer, taking oil samples, topping up or replacing oil, changing taps, or testing the transformer.

    Transformer principles, core loss, copper loss, and vector groups are covered in Chapter 12 on transformers. Substations, switchgear panels, the APP, and the ownership boundary between PLN and the customer are in Chapter 110 on building medium-voltage substations and service connections. Electrical codes are in Chapter 3, grounding systems in Chapter 20, isolation and disconnection in Chapter 31, safe work and LOTO in Chapter 76, surges and lightning in Chapter 35, generator sets and transfer switches in Chapter 36, harmonics in Chapter 10, and hazardous waste in Chapter 35 · Water & Water Treatment.

    Work outside the building technician’s authority: opening the cover, terminal box, or enclosure door of the transformer, approaching live parts, taking oil samples, topping up or replacing oil, changing taps, resetting temperature alarms, testing insulation resistance or turns ratio, and thermal scanning close to live parts. That work belongs to PLN if the transformer belongs to PLN, or to personnel with competency and electrical OHS certification appointed by the owner, under a work permit. The building technician reads indicators from outside, records, keeps the room and its ventilation in order, and reports.

    The nameplate and the role of the distribution transformer

    A building distribution transformer is the transformer that receives medium voltage from the switchgear and delivers low voltage to the main distribution board. Its nameplate shows the kVA rating, primary and secondary voltages, frequency, percent impedance, vector group, cooling method, basic impulse insulation level, temperature rise or insulation class, tap position, and the weight or volume of oil.

    According to a technical paper of the United States military electrical working group (TSEWG TP-5), impedance determines how much the voltage drops as the load changes and limits the maximum fault current; it commonly ranges from 3 to 6 percent. A high impedance limits short-circuit current but worsens voltage regulation, and vice versa.

    A tap is a connection point on a winding that changes the turns ratio so that the secondary voltage can be raised or lowered slightly. The United States military specification for secondary unit substations calls for four 2.5 percent taps, two above and two below the rated primary voltage, with a tap changer operated when the transformer is de-energized. Low voltage at the distribution board is therefore not corrected by the building technician turning the tap; tap changes are carried out by authorized personnel after the transformer has been de-energized.

    The Electricity Distribution Code requires every transformer connected to the distribution system to have lightning protection and overload and short-circuit protection in the form of fuse switches or circuit breakers. That protection is in the outgoing switchgear panel and the main distribution board (Chapter 110); as of November 2026 the status of that 2009 code cannot be confirmed from JDIH ESDM.

    Oil-filled and dry-type transformers

    A liquid-immersed transformer has its core and windings immersed in an insulating liquid that also carries heat to the tank walls and radiator fins. A dry-type transformer is cooled primarily by air flowing inside its enclosure. The voltage class of a dry-type transformer for 20 kV is stated by its manufacturer on the nameplate.

    The United States military specification names two types of dry-type transformer for substations: cast coil windings, recommended where the transformer will be de-energized for long periods, installed outdoors, or in a highly corrosive environment, and vacuum pressure impregnated (VPI) windings, recommended for clean, limited indoor spaces in continuous service. The same specification notes that dry-type transformers are generally less efficient and more expensive than oil-filled transformers.

    Insulating liquids differ in their fire hazard. The United States military criteria for exterior distribution allow mineral-oil-filled transformers only outdoors, while transformers filled with a less-flammable liquid, a liquid with a fire point of not less than 300 °C, may be used indoors or outdoors. The criteria also ask for oil spill containment to be considered for substation transformers. Those rules apply to United States military facilities; in other buildings, the location of oil-filled transformers follows the design, permits, and local fire protection rules (Chapter 17 · Buildings & Facilities).

    Old transformers hold another hazard. EPA records that PCBs (polychlorinated biphenyls) were manufactured in the United States from 1929 until their manufacture and import were banned in 1979, and that products made before that ban, including transformers and capacitors, may still contain PCBs. These are United States data, but transformers and their oil move across borders. A transformer of unknown age with no label for its oil type is treated as possibly containing PCBs until a test result is available, and used oil and materials contaminated with oil are handled as hazardous waste (Chapter 35 · Water & Water Treatment).

    kVA rating and loading

    The kVA rating is the output a transformer can deliver at rated voltage and frequency without exceeding a specified temperature rise set from insulation life and ambient temperature. TSEWG TP-5 stresses that the real limit is the current that can flow without exceeding that temperature rise, and that a transformer can be loaded above its rating with no loss of life expectancy only when operated within the limits stated by the manufacturer. The rating is not a limit that destroys the transformer at once, but it also must not be exceeded without manufacturer data.

    The load fraction is the ratio of the load to the rating:

    x=SSrx = \frac{S}{S_\text{r}}

    where xx is the load fraction (dimensionless), SS is the apparent power of the load (kVA), and SrS_\text{r} is the transformer rating (kVA). Apparent power is read from the current in each phase on the low-voltage side as in Chapter 110.

    Most building transformers run well below their rating. TSEWG TP-5 and the United States military criteria for interior installations cite nationwide United States surveys showing average dry-type transformer loading of about 35 percent in commercial facilities and 50 percent in industrial facilities. The United States military distribution maintenance guidance records average transformer loading of about 20 to 25 percent of rating at peak demand at more than 50 air bases, and recommends that replacement transformers be sized to the actual load.

    Some designs provide continuous overload capability. The United States military criteria for interior installations call for low-voltage dry-type transformers with 220 °C insulation and a temperature rise not exceeding 115 °C that can carry 115 percent of rating continuously at a maximum ambient temperature of 40 °C, or transformers with an 80 °C rise that can carry 130 percent when additional capacity is needed. For oil-filled transformers, the United States military substation specification mentions 55/65 °C insulation, which gives a continuous overload of 12 percent without exceeding a 65 °C winding temperature rise. That capability belongs to particular transformer types and is stated in their manufacturer data; without that data, the nameplate rating remains the limit.

    Harmonics add heat. TSEWG TP-5, citing IEEE C57.110, states that a transformer should be capable of carrying its rated current provided the total harmonic distortion is less than 5 percent, and that beyond this a derating or a K-factor transformer may be needed. Electronic loads such as medical equipment power supplies, UPS units, and VFDs are covered in Chapter 10.

    Temperature and cooling

    Temperature rise is the difference between the average winding temperature and the ambient temperature at rated load. The winding hot-spot temperature is estimated from

    θh=θa+Δθb+Δθh\theta_\text{h} = \theta_\text{a} + \Delta\theta_\text{b} + \Delta\theta_\text{h}

    where θh\theta_\text{h} is the hot-spot temperature (°C), θa\theta_\text{a} is the ambient temperature (°C), Δθb\Delta\theta_\text{b} is the average winding temperature rise (°C), and Δθh\Delta\theta_\text{h} is the hot-spot allowance (°C). This formula explains how insulation classes are built up, not the temperature of a transformer in operation.

    TSEWG TP-5 explains the insulation classes of dry-type transformers in this way. Class 105 consists of an ambient temperature of 40 °C, an average rise of 55 °C, and a hot-spot allowance of 10 °C. Class 150 allows an 80 °C rise plus 30 °C, class 185 a 115 °C rise plus 30 °C, and class 220 a 150 °C rise plus 30 °C, each above an ambient of 40 °C. For oil-filled transformers, the United States military specification uses a 65 °C average winding temperature rise above a 30 °C ambient.

    This means the kVA rating applies only when the ambient temperature does not exceed its design value. The United States military criteria for interior installations call for derating according to the manufacturer’s guidance for maximum ambient temperatures above 40 °C, and for adequate ventilation of transformer spaces so that the temperature rise does not exceed the rating.

    The cooling method is shown on the nameplate. The most common oil-filled transformers are naturally cooled: the oil circulates naturally and air flows naturally over the fins (ONAN); the ONAN/ONAF variant adds fans. Dry-type transformers are self-cooled by natural air (AA), forced-air cooled (AFA), or a combination of both (AA/FA), and self-cooled dry-type transformers need adequate room ventilation. In the opening case, the cardboard blocking the louvers reduced the cooling air just as the load rose.

    The United States military specification calls for oil-filled transformers to have a liquid level indicator, a pressure-vacuum gauge, a liquid temperature indicator, and a pressure relief device on top of the tank; dry-type transformers have a winding temperature indicator. Temperature alarm and trip settings are set by the manufacturer and the designer, and the technician compares readings with those settings and with earlier records at similar load and ambient temperature, not with memorized figures.

    Visual inspection and transformer oil

    The United States military distribution maintenance guidance recommends visual and mechanical inspection of power transformers every year, while general inspections may be made whenever the transformer is visited, with results tracked for trend analysis. The following items can be observed by the building technician from outside without approaching live parts:

    • the physical condition of the tank, fins, and enclosure, including rust and seepage;
    • grounding connections that are still in place;
    • PCB labeling, if present;
    • cooling fans running when they should be running;
    • the correct liquid level on its indicator;
    • positive pressure on gas-blanketed transformers; and
    • the integrity of the oil containment dike or pit, and rainwater collected in it.

    Other items in the same list, such as cleaning bushings, testing alarm and trip circuits, checking bolted connections, and testing taps, are work for authorized personnel with the transformer in a safe condition.

    Electrical tests and oil tests are carried out by authorized parties. The same guidance recommends insulation testing and gas analysis annually or every five years depending on the role of the transformer, particularly for transformers of 500 kVA or more, and testing after any fault event. Oil samples are tested for, among other things, dielectric breakdown voltage, acid number, water content, interfacial tension, color, and power factor, and dissolved gas analysis (DGA) is used to detect damage inside the transformer; furan testing estimates the aging of the paper insulation. The building technician makes sure the sample date, results, and recommendations are recorded in the transformer log.

    Thermal scanning is also a maintenance item. The guidance recommends infrared scanning at the highest possible load, preferably not less than 40 percent of rating, with a camera able to resolve 1 °C at 30 °C. Scanning close to live parts is work for authorized personnel; thermography is covered in Chapter 21 · Physics.

    Losses and efficiency

    No-load loss P0P_0 is the core loss that flows for as long as the transformer is energized, even with no load. Load loss PkP_\text{k} is the winding loss at rated load, which is proportional to the square of the current. TSEWG TP-5 notes that winding losses decrease with the square of the load. Total loss and efficiency at load fraction xx are

    Prugi=P0+x2PkP_\text{rugi} = P_0 + x^2 P_\text{k}η=x Srcos⁡φx Srcos⁡φ+P0+x2Pk\eta = \frac{x \, S_\text{r} \cos\varphi}{x \, S_\text{r} \cos\varphi + P_0 + x^2 P_\text{k}}

    where PrugiP_\text{rugi} (total loss), P0P_0, and PkP_\text{k} are in kW, SrS_\text{r} is in kVA, cos⁡φ\cos\varphi is the load power factor, and η\eta is the efficiency (dimensionless). The formula neglects the effect of temperature on winding resistance. Maximum efficiency occurs when the load loss equals the no-load loss, that is, at

    xmaks=P0Pkx_\text{maks} = \sqrt{\frac{P_0}{P_\text{k}}}

    The derivation is in Chapter 12. At low load, the no-load loss dominates, and a transformer that is too large for its load wastes energy all day.

    The United States Department of Energy sets minimum efficiencies for distribution transformers at 50 percent of nameplate load for oil-filled and medium-voltage dry-type transformers. For a 1,000 kVA three-phase oil-filled transformer, the minimum efficiency since January 1, 2016 is 99.43 percent, and the April 2024 rule raises it to 99.46 percent for transformers manufactured from five years after that rule was published. For a 1,000 kVA three-phase medium-voltage dry-type transformer with a basic impulse insulation level of 46 to 95 kV, the figures are 99.20 percent and 99.28 percent. These are United States standards, not Indonesian rules, but they are useful as a benchmark for manufacturer loss data. The Department of Energy also notes that at 50 percent load, the no-load loss makes up a significant part of the total loss.

    Every kilowatt of loss also becomes heat in the transformer room that the ventilation has to remove, and it counts toward the building’s carbon footprint (Chapter 19 · Fluids & Thermal).

    Transformer records

    Permen ESDM 10/2021 places the maintenance of an installation on its owner, carried out by a licensed maintenance service company or in-house technical staff holding competency certificates, and covering inspection, servicing, repair, and retesting. Permenaker 12/2015 provides that maintenance of installations at more than 50 volts alternating current is carried out by an Electrical OHS Expert or, for installation and maintenance, an Electrical OHS Technician; as of November 2026 JDIH Kemnaker lists its status as in force.

    A useful transformer log contains:

    1. nameplate data, a photo of the nameplate, installation date, owner, and SLO;
    2. the insulating liquid type, volume, and PCB status if known;
    3. routine readings: date, time, ambient temperature, liquid or winding temperature, liquid level, pressure, phase currents, and fans;
    4. visual findings: seepage, rust, sound, smell, the containment pit, and ventilation;
    5. reports of oil tests, DGA, insulation tests, and thermography with their recommendations; and
    6. events: trips, faults, large load changes, and contractor work.

    A temperature reading without the ambient temperature and the current at the time is hard to interpret: the 18 °C rise in the opening case means something different if the load stayed the same than if the load rose from 70 to 89 percent on a hotter day.

    Worked example

    The numbers in the examples below are practice figures unless their source is stated.

    Example 1: load fraction in the opening case. The main distribution board currents at peak hour read 1,320 A, 1,250 A, and 1,290 A at 230 V. The apparent power is S=230×(1,320+1,250+1,290)=887,800S = 230 \times (1{,}320 + 1{,}250 + 1{,}290) = 887{,}800 VA, which is 887.8 kVA, so x=887.8/1,000=0.888x = 887.8/1{,}000 = 0.888. Before the chiller and the imaging room were installed, the records showed 700 kVA, that is, x=0.70x = 0.70. The increase of 887.8−700=187.8887.8 - 700 = 187.8 kVA is almost equal to the new load installed.

    Example 2: insulation class and ambient temperature. Class 220 is built up from 40+150+30=22040 + 150 + 30 = 220 °C and class 185 from 40+115+30=18540 + 115 + 30 = 185 °C. If a fully loaded class 220 dry-type transformer stands in a room at 45 °C because its ventilation is blocked, its hot spot is estimated at 45+150+30=22545 + 150 + 30 = 225 °C, which is 5 °C above its insulation limit. A high ambient temperature is therefore reported, and the derating is determined according to the manufacturer’s guidance.

    Example 3: losses and efficiency at several loads. A 1,000 kVA oil-filled transformer has P0=1.0P_0 = 1.0 kW and Pk=7.2P_\text{k} = 7.2 kW, with a load at unity power factor. At 50 percent load, its total loss is 1.0+0.52×7.2=2.81.0 + 0.5^2 \times 7.2 = 2.8 kW and its efficiency is 500/(500+2.8)=0.99443500/(500 + 2.8) = 0.99443, which is 99.443 percent. At full load, 1,000/(1,000+1.0+7.2)=0.991871{,}000/(1{,}000 + 1.0 + 7.2) = 0.99187, and at 25 percent, 250/(250+1.0+0.45)=0.99423250/(250 + 1.0 + 0.45) = 0.99423. Maximum efficiency occurs at xmaks=1.0/7.2=0.373x_\text{maks} = \sqrt{1.0/7.2} = 0.373, which is about 373 kVA.

    Example 4: comparing with the United States standard. Assuming an output of 500 kW at 50 percent load and unity power factor, an efficiency of 99.43 percent allows a loss of at most 500×(1/0.9943−1)=2.866500 \times (1/0.9943 - 1) = 2.866 kW, and an efficiency of 99.46 percent only 500×(1/0.9946−1)=2.715500 \times (1/0.9946 - 1) = 2.715 kW. The transformer in Example 3, with a loss of 2.8 kW, meets the 2016 figure but not the new figure. This comparison assesses manufacturer data, not compliance with Indonesian rules.

    Example 5: annual energy losses. The load on the transformer in Example 3 averages x=0.8x = 0.8 for 10 hours and x=0.35x = 0.35 for 14 hours every day. The daily load loss is 7.2×(0.82×10+0.352×14)=7.2×8.115=58.4287.2 \times (0.8^2 \times 10 + 0.35^2 \times 14) = 7.2 \times 8.115 = 58.428 kWh, and the no-load loss is 1.0×24=241.0 \times 24 = 24 kWh, so 82.42882.428 kWh per day or 82.428×365=30,08682.428 \times 365 = 30{,}086 kWh per year. An old transformer with P0=2.4P_0 = 2.4 kW and Pk=11P_\text{k} = 11 kW on the same pattern loses 2.4×24+11×8.115=146.8652.4 \times 24 + 11 \times 8.115 = 146.865 kWh per day or 53,606 kWh per year, which is 53,606−30,086=23,52053{,}606 - 30{,}086 = 23{,}520 kWh per year more.

    Example 6: a containment pit filled with rainwater. A transformer holding 650 L of oil stands over a pit 2.0 m by 1.6 m and 0.25 m deep, with a volume of 2.0×1.6×0.25=0.82.0 \times 1.6 \times 0.25 = 0.8 m³, which is 800 L, enough for all the oil. If rainwater 0.15 m deep already fills the pit, the water takes up 2.0×1.6×0.15=0.482.0 \times 1.6 \times 0.15 = 0.48 m³, and the remaining space is only 0.8−0.48=0.320.8 - 0.48 = 0.32 m³, which is 320 L, less than half of the oil. Rainwater in the pit is therefore drained according to the building procedure, and water that smells of oil is reported first.

    Stop conditions

    1. Oil is dripping or seeping from the tank, fins, valves, or bushings, or the liquid level indicator shows below the normal mark: do not top up the oil and do not tighten anything; record and report to the technical officer in charge, and call the transformer maintenance contractor.
    2. The liquid or winding temperature indicator has reached its alarm, the fans are not running when they should, or the temperature is far above the records at similar load and ambient temperature: do not reset the alarm and do not open the enclosure door of a dry-type transformer; report to the technical officer in charge so that the load is reduced according to procedure, and call the HVAC technician if the room ventilation is impaired.
    3. A much louder or changed hum, a hiss, or a bang is heard, a burning smell is noticed, or smoke is visible: leave the room, keep people away, and report to the technical officer in charge and to PLN or electrical OHS personnel; if there is fire, follow the building fire procedure and tell the fire service that there is an energized, oil-filled transformer.
    4. The pressure-vacuum gauge shows an abnormal value, the pressure relief device appears to have operated, or the tank appears to be bulging: keep away from the transformer and report immediately; the transformer is inspected by authorized personnel after it has been de-energized.
    5. The work would require opening the cover or enclosure, taking an oil sample, changing taps, testing insulation, or thermal scanning close to live parts: stop; that work belongs to PLN or to certified electrical OHS personnel under a work permit.
    6. Oil has spilled onto the floor or out of the containment pit, or the oil type of an old transformer is unknown: do not touch the oil without oil-resistant gloves, do not discharge it to a drain, and report. The oil and materials contaminated with oil are handled as hazardous waste until their PCB status is known.
    7. A new load is about to be connected, or the peak load is approaching the nameplate rating: postpone adding the load until the engineer has assessed the load, the temperature, and the manufacturer data.
    8. The transformer room ventilation is blocked, the room is used as storage, or water has entered the room: report; goods are moved under the direction of the technical officer in charge without approaching live parts.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    A dry-type transformer needs no inspection because it holds no oil.

    Why is it wrong?

    A dry-type transformer still heats up, needs room ventilation, and has a winding temperature indicator. Dust, blocked ventilation, and a high ambient temperature reduce its capability.

    Common misconception

    As long as the protection does not trip, any load is safe for the transformer.

    Why is it wrong?

    The kVA rating is set by temperature rise and insulation life, not by the protection setting. Overload is safe only within the manufacturer’s limits, and ambient temperature and harmonics also matter.

    Common misconception

    The smaller the load, the more efficient the transformer.

    Why is it wrong?

    At low load, the fixed no-load loss becomes a large part of the loss. Maximum efficiency occurs at a load fraction of P0/Pk\sqrt{P_0/P_\text{k}}, not at a load close to zero.

    Common misconception

    Transformer oil may be topped up by staff when the indicator drops.

    Why is it wrong?

    A falling oil level indicates a leak or another problem that must be investigated, the oil type must match, old oil may contain PCBs, and the tank is close to live parts. Topping up oil is work for the maintenance contractor.

    Common misconception

    An efficiency of 99 percent means transformer losses can be ignored.

    Why is it wrong?

    On a 1,000 kVA transformer, a loss of a few kilowatts flowing continuously becomes tens of thousands of kWh per year and becomes heat in the transformer room.

    Chapter 12 on transformers gives the principles and the derivation of maximum efficiency, and Chapter 110 on building medium-voltage substations and service connections places the transformer between the switchgear and the distribution board. Trending temperature and oil follows Chapter 14 · Mechanical & Mechatronics on condition monitoring, planned maintenance is in Chapter 81, thermography in Chapter 21 · Physics, harmonics in Chapter 10, used oil in Chapter 34 · Water & Water Treatment, and hazardous waste in Chapter 35 · Water & Water Treatment.

    Exercises and worked solutions

    The numbers in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. An 800 kVA transformer serves a load with currents of 760 A, 820 A, and 790 A at 230 V. What is its load fraction?

      Check my answer
      See the worked solution

      The apparent power is S=230×(760+820+790)=545,100S = 230 \times (760 + 820 + 790) = 545{,}100 VA, which is 545.1 kVA, so x=545.1/800=0.681x = 545.1/800 = 0.681. That figure is recorded together with the ambient temperature and the transformer temperature so that the trend can be read.

    2. A fully loaded class 185 dry-type transformer stands in a room at 50 °C. What is its estimated hot-spot temperature compared with the class limit, and what does the technician do?

      Check my answer
      See the worked solution

      The estimate is 50+115+30=19550 + 115 + 30 = 195 °C, which is 10 °C above the class limit of 185 °C, because the rating applies to a maximum ambient temperature of 40 °C. The technician reports the room temperature and its cause, such as blocked ventilation, so that the engineer can assess the derating according to the manufacturer’s guidance.

    3. A 630 kVA transformer has P0=0.8P_0 = 0.8 kW and Pk=6.5P_\text{k} = 6.5 kW. At what load fraction is its efficiency highest, and what is its total loss at 60 percent load?

      Check my answer
      See the worked solution

      Efficiency is highest at xmaks=0.8/6.5=0.351x_\text{maks} = \sqrt{0.8/6.5} = 0.351, about 221 kVA. At 60 percent load, the total loss is 0.8+0.62×6.5=3.140.8 + 0.6^2 \times 6.5 = 3.14 kW, with the load loss already larger than the no-load loss.

    4. The oil level indicator has dropped slightly compared with last month and there is an oil stain under a valve. What does the technician do and not do?

      Check my answer
      See the worked solution

      The technician photographs and records the oil level, the location of the stain, the temperature, and the load, then reports to the technical officer in charge and asks the maintenance contractor to check for a leak. The technician does not top up the oil, does not tighten the valve, and does not clean the stain close to live parts, because the cause must be investigated and the oil type must be known.

    5. The manager wants to replace a 1,600 kVA transformer with a peak load of 400 kVA by a more efficient 1,600 kVA transformer. What should be considered first?

      Check my answer
      See the worked solution

      The load fraction is only 400/1,600=0.25400/1{,}600 = 0.25, so the no-load loss dominates and a smaller transformer or one with a low no-load loss may save more. The size of the replacement is set by the engineer from actual load data, planned loads, and manufacturer losses, as the United States maintenance guidance recommends.

    6. A containment pit 1.8 m by 1.5 m and 0.3 m deep serves a transformer holding 520 L of oil. What is the maximum rainwater depth in the pit for all the oil still to be contained?

      Check my answer
      See the worked solution

      The pit volume is 1.8×1.5×0.3=0.811.8 \times 1.5 \times 0.3 = 0.81 m³, and the oil needs 0.52 m³, so the space for water is at most 0.81−0.52=0.290.81 - 0.52 = 0.29 m³. The water depth is at most 0.29/(1.8×1.5)=0.1070.29/(1.8 \times 1.5) = 0.107 m, about 10.7 cm, so water deeper than that is drained according to the procedure.

    References

    External sources

    • TSEWG TP-5: Interior Transformer Ratings and Installationwbdg.org
    • UFC 3-520-01 Interior Electrical Systemswbdg.org
    • UFGS-26 11 16 Secondary Unit Substationswbdg.org
    • UFC 3-550-01 Exterior Electrical Power Distribution, with Change 3wbdg.org
    • UFM 3-550-07 Operation and Maintenance (O&M): Exterior Power Distribution Systemswbdg.org
    • Energy Conservation Program: Energy Conservation Standards for Distribution Transformersenergy.gov
    • Learn about Polychlorinated Biphenylsepa.gov
    • Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 04 Tahun 2009 tentang Aturan Distribusi Tenaga Listrikjdih.esdm.go.id
    • Peraturan Menteri Ketenagakerjaan Nomor 12 Tahun 2015 tentang Keselamatan Dan Kesehatan Kerja Listrik Di Tempat Kerjajdih.kemnaker.go.id
    • Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 10 Tahun 2021 tentang Keselamatan Ketenagalistrikanjdih.esdm.go.id

    Revision history

    DateVersionChange
    November 14, 20261First published

    How to cite

    Kurnia (2026). Building distribution transformers: oil-filled and dry types, rating and loading, temperature and cooling, visual and oil inspection, losses and efficiency, and records. ARSTEMA Academy. Revised November 14, 2026. arstema.com/en/academy/konsep/trafo-distribusi-gedung-jenis-minyak-dan-kering-rating-dan-pembebanan-suhu-dan-pendinginan-pemeriksaan-visual-dan-minyak-rugi-dan-efisiensi-serta-catatan

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated

    Safety limits still apply. This quiz tests reasoning; it doesn’t authorize mixing, adjusting, dismantling, live measurement, or field action.

    1

    An 800 kVA transformer serves a load with currents of 760 A, 820 A, and 790 A at 230 V. What is its load fraction?

    2

    A fully loaded class 185 dry-type transformer stands in a room at 50 °C. What is its estimated hot-spot temperature compared with the class limit, and what does the technician do?

    3

    A 630 kVA transformer has P0=0.8P_0 = 0.8 kW and Pk=6.5P_\text{k} = 6.5 kW. At what load fraction is its efficiency highest, and what is its total loss at 60 percent load?

    Self-assessment progress0%