By Kurnia · Published November 14, 2026 · Version 1 · 21 min read
Building medium-voltage substations and service connections
20 kV switchgear panels, distribution transformers, PLN metering and limiting equipment, the PLN and customer ownership boundary, substation rooms, and limits of authority
On a night of heavy rain the hotel loses power, the generator set picks up the priority loads, and the duty technician finds the hotel’s outgoing switchgear breaker open with a relay flag dropped, water dripping above it, and a smell like ozone, while the manager asks for the breaker to be switched back on. This chapter covers building medium-voltage substations and service connections from the building technician’s side: what medium voltage means and the medium-voltage customer class, the layout of a substation from the incoming panel to the distribution transformer, the switching devices in 20 kV switchgear panels and their indicators, PLN metering and limiting equipment and its seals, the connection point as the boundary of ownership between PLN and the customer, the substation room, the abnormal signs to check on entering, and the division of authority under Permen ESDM 10/2021, the Electricity Distribution Code, and Permenaker 12/2015. Switching operations, opening switchgear compartments, reclosing a breaker that tripped on a fault, and work on 20 kV equipment are stated as work for PLN or for certified electrical OHS personnel working under a work permit.
This material involves real hazards. A concept explanation doesn’t replace site procedures, competency, energy isolation, the latest SDS, or a work permit.
At 23:40, during heavy rain, the power at a 240-room hotel goes out. The generator set starts and the transfer switch moves the priority loads, but the guest elevators, part of the air conditioning, and the kitchen stay dead. The PLN officer who is called says the 20 kV feeder in the area is normal. The duty technician opens the door of the hotel substation room and sees that the indicator lamp on the outgoing switchgear panel shows the breaker open, a protection relay flag has dropped, water is dripping from the ceiling above the row of panels, and there is a smell like ozone. Over the radio, the night manager asks for the breaker to be “just switched back on” so that the hotel no longer depends on the generator set.
The technician touches nothing. They lock the room, record what they saw, then call the chief engineer and the substation maintenance contractor engaged by the hotel. The next morning a blocked gutter is found and water has seeped into the cable compartment; the breaker tripped on a ground fault. Two questions decided that night: which panels belong to the hotel and which belong to PLN, and who is authorized to close a breaker that tripped on a fault.
Scope
This chapter covers building medium-voltage substations and service connections from the building technician’s side: what a medium-voltage connection means, the layout of a customer substation, switchgear panels and their indicators, PLN metering and limiting equipment, the boundary of ownership and responsibility between PLN and the customer, the substation room, and the division of authority. It is learning material, not a work instruction. This chapter contains no steps for switching operations, opening switchgear panels, replacing medium-voltage fuses, applying work grounding, or testing 20 kV equipment.
Building distribution transformers are covered in detail in Chapter 111, and PLN meters and bills in Chapter 112 on reading PLN electricity meters and bills. Electrical codes are in Chapter 3, the low-voltage supply system and the APP for low-voltage customers in Chapter 13, grounding systems in Chapter 20, isolation and disconnection in Chapter 31, safe work and LOTO in Chapter 76, arc flash in Chapter 77, distribution boards in Chapter 34, surges and lightning in Chapter 35, generator sets and transfer switches in Chapter 36, and confined spaces in Chapter 11 · Safety.
Work outside the building technician’s authority: entering switchgear compartments, operating 20 kV switches or breakers, reclosing a breaker that tripped on a fault, resetting protection relays, replacing medium-voltage fuses, applying or removing work grounding, testing or measuring on the 20 kV side, and touching the APP and its seals. Work on the PLN side belongs to PLN officers. Work on the building side belongs to personnel with competency and electrical OHS certification appointed by the owner, working under a work permit. The building technician inspects from outside, reads indicators, records, keeps the room in order, and reports.
From the 20 kV network to the building
Permen ESDM 10/2021 on Electricity Safety divides voltage into four classes; medium voltage is a rated voltage above 1,000 volts up to and including 35,000 volts. PLN distribution networks in most areas operate at 20 kV, and the Electricity Distribution Code lists the 20 kV consumer connection as one type of connection. As of November 2026 the status of both regulations cannot be confirmed from JDIH ESDM; check it before using them for an audit.
On the tariff side, Permen ESDM 7/2024 defines medium-voltage customers as customers with a power of more than 200 kVA up to less than 30,000 kVA, and large hotels fall into the large business class at medium voltage (B-3/TM). The same power at a voltage 50 times higher needs only one fiftieth of the current (Example 1).
In a customer substation, the 20 kV cable from the network enters a medium-voltage switchgear panel (Indonesian kubikel), a metal cabinet containing medium-voltage switches, breakers, or fuses together with busbars and auxiliary equipment. After the incoming panel comes the metering panel where the medium-voltage APP is installed, then the outgoing panel that protects the distribution transformer. The transformer steps the voltage down to 400/230 V, and from its low-voltage side the loads are distributed at the building’s main distribution board (Chapter 34). The exact arrangement differs between buildings and is shown on the substation single-line diagram.
That single-line diagram is the first document the technician looks for. HSE describes the network diagram as an important reference for the operation and maintenance of high-voltage switchgear; it should include prospective fault current values and the capability of each item of switchgear, and it needs to be kept up to date; in a building with several substations, a copy is kept in each substation.
20 kV switchgear panels: types of switching device and their indicators
HSE distinguishes switches, isolators, switch-fuses, contactors, and circuit breakers, which differ in their switching and fault-handling capability; failing to recognize the type can endanger the operator. The arc-interrupting medium is oil, air, SF6 gas, or vacuum. The main differences:
- A load-break switch can open normal load current but is not designed to interrupt fault current; some are designed to close onto a fault.
- A circuit breaker can interrupt fault current when its protection relay commands it.
- A switch-fuse combines a load-break switch with a medium-voltage fuse that interrupts faults.
- A disconnector only separates a circuit that is already carrying no load.
HSE records accidents on oil switches in ring main units: an operator switched to the ground position by mistake, then reflexively reversed it, so the switch was forced to interrupt fault current beyond its capability, failed, and seriously injured the operator. Switchgear failures are rare, but are most likely during or shortly after operation, and oil-filled switchgear can eject burning oil and gas.
From outside the panel, HSE asks routine inspections to check whether ammeters, voltmeters, position indicators, protection indicators, oil level, or gas pressure on sight glasses or gauges are working and showing acceptable values, whether protection flags have dropped as a warning, and whether labels, padlocks, and key interlocks are present. Circuit breakers usually open and close from a battery supply; failure of the battery or its charger leaves the switchgear unable to operate, so HSE recommends battery condition monitoring with an alarm.
SF6 (sulphur hexafluoride) is the insulating and arc-interrupting gas in many modern switchgear panels. In its pure state the gas is inert, colorless, non-flammable, and non-toxic, but it is heavier than air and can accumulate in cable trenches, pits, and tunnels; a concentration above 19 percent by volume in air can cause asphyxiation, that is, oxygen deficiency. An electric arc decomposes SF6 into by-products that can appear as a white powder and irritate the skin, eyes, and respiratory tract. Owners of SF6 switchgear therefore need a procedure for leaks, and HSE asks for a written notice about SF6 to be posted inside the substation.
PLN metering and limiting equipment
The APP (utility metering and limiting device, Indonesian alat pengukur dan pembatas) is the PLN equipment that measures the energy sold to the customer and limits power according to the contract. For medium-voltage connections, the Distribution Code sets the quantities to be measured, namely kWh, kVArh, and maximum kVA, and metering may be direct or indirect through instrument transformers, that is, current transformers and voltage transformers. The meter in the metering panel reads the current and voltage on the secondary side of those instrument transformers.
Metering equipment is protected by the rules. The Distribution Code states that every change made to the metering equipment by the seller must be witnessed by the buyer and recorded in minutes signed by both, and that changes to the original data stored in the meter are not permitted. Permen ESDM 27/2017 classifies unauthorized use of electricity, including violations that affect energy metering or the power limit, which are subject to a supplementary bill, temporary disconnection, or removal. The building technician does not touch the seals on the APP and the metering panel, and damage to a seal is reported.
Protection on the customer side is also tied to the network. The Distribution Code requires the customer’s protection equipment to be coordinated with the distribution system protection, and every transformer connected to the distribution system to have lightning protection and overload and short-circuit protection in the form of fuse switches or circuit breakers. The relay settings in the outgoing panel are therefore not values the building technician may change: a wrong setting can trip the PLN feeder and cut supply to other customers.
The PLN and customer ownership boundary
The connection point is the point where the customer’s installation meets the PLN distribution system. For 20 kV consumer connections, the Distribution Code states that the connection point is located after the APP, and the distribution operator may set another location on special technical and economic grounds. PLN’s FAQ page states that providing materials up to the APP is PLN’s responsibility, and that for consumers above 200 kVA the construction of the civil substation on the PLN side is PLN’s responsibility, while the land is provided by the consumer on a loan-for-use basis governed by the electricity sale and purchase agreement (SPJBTL). That page was written around 2014; the arrangement for an individual building is read from its SPJBTL and handover drawings.
The practical rule: the incoming panel and the metering panel with the APP are the PLN side, even though they stand on hotel land and in a room whose key the hotel holds. The outgoing panel, the cable to the transformer, the transformer, and the low-voltage distribution board are the customer side, unless the SPJBTL states otherwise. In the opening case, the breaker that tripped is in the hotel’s outgoing panel, so investigating it is the hotel’s responsibility, not PLN’s.
Ownership also brings obligations. Permen ESDM 10/2021 requires every operating electrical installation to hold a Certificate of Operational Worthiness (Sertifikat Laik Operasi, SLO), and Permen ESDM 27/2017 requires a utilization installation to hold an SLO before PLN connects it. The amendment status of Permen ESDM 27/2017 as of November 2026 cannot be confirmed. The substation SLO is kept with the handover drawings and the SPJBTL.
Maintenance of an installation is carried out by its owner, through a licensed maintenance service company or in-house technical staff holding competency certificates, and covers inspection, servicing, repair, and retesting. HSE states the same principle for the United Kingdom: even when operation and maintenance are contracted to a service provider, the owner of the switchgear keeps the legal responsibility for its safety.
Maintenance on the customer side often needs an outage from PLN, and the Distribution Code requires a large consumer, a consumer with a connected power greater than 1 MVA or as determined by the distribution operator, to submit the schedule of maintenance that needs an outage in writing at least two weeks beforehand, and the distribution operator to reply at least one week before the work. The same code states that each party is responsible for the safety of its own personnel within its responsibilities and that each has a person responsible for OHS.
The substation room
The substation room is a restricted-access area. The annex to Permen ESDM 10/2021 requires places housing equipment at medium voltage or higher to carry safety signs showing the potential hazard or a restricted area accessible only to authorized parties. HSE suggests that doors be locked, keys controlled, entry limited to appointed people, and every visit recorded.
According to HSE, routine inspection of the substation building confirms that:
- there are no signs of water ingress;
- the room is clean, tidy, and not used as storage;
- lighting and telephones are working;
- doors and windows are secure and locked where required;
- there is no damage to, or interference with, the equipment or the building;
- access is not obstructed by vegetation or goods; and
- there are no signs of rodents or other animals.
HSE also asks for the presence of emergency lighting, tripping batteries, heaters, battery chargers, fire detection and extinguishing systems, portable fire extinguishers, the substation log book, and the network diagram to be checked. HSE also warns that gas-based automatic extinguishing systems can endanger people inside the room, so the entry procedure for a room with automatic fire protection needs to be communicated. Portable fire extinguishers and fire classes are covered in Chapter 17 · Buildings & Facilities.
The cable trench below the switchgear needs particular attention. Leaking SF6 collects in low places, and HSE asks for an assessment of whether cable trenches or tunnels are classified as confined spaces. The building technician does not open or enter substation cable trenches; confined spaces are covered in Chapter 11 · Safety.
Limits of authority
Permen ESDM 10/2021 governs the operation of an electrical installation once it holds an SLO, by the installation owner or by an operating service company appointed by the owner, with standard operating procedures and an organizational structure whose technical staff hold competency certificates. The electricity safety management system (SMK2) applies to utilization installations with a capacity of at least 200 kVA, and the installation owner must have an electricity safety officer (Indonesian penanggung jawab keselamatan ketenagalistrikan, PJK2), the technical officer given authority to make decisions on electricity safety. Buildings with a medium-voltage connection fall within that scope, so the PJK2 is the first person to receive the technician’s reports about the substation.
Permenaker 12/2015 on electrical OHS in the workplace applies to activities operating at more than 50 volts alternating current or 120 volts direct current. Planning, installation, modification, and maintenance are carried out by an Electrical OHS Expert, while installation and maintenance may be carried out by an Electrical OHS Technician, within the company or at an OHS service company. A company with electricity generation of more than 200 kVA must have an Electrical OHS Expert. As of November 2026 JDIH Kemnaker lists its status as in force.
HSE adds two points. First, the person authorized to operate switchgear, often called an authorised person, is appointed in writing for particular switchgear and duties, and someone trained to close a breaker as part of an isolation procedure is not necessarily authorized to close the same breaker after it has operated because of a fault. Second, work on high-voltage switchgear is controlled by a permit to work, which is never issued for equipment that is still live. Work permits are covered in Chapter 76.
In short, PLN officers work on the PLN side. Certified personnel appointed by the owner, under the PJK2, operate and maintain the building side under a work permit. A building technician without that certification and appointment operates nothing on the 20 kV side.
Inspecting from outside and keeping records
HSE asks for the check for abnormal conditions to be made immediately on entering a substation, and if danger is suspected, the inspection is stopped and investigated by someone with the necessary knowledge and experience. The signs HSE lists:
- high temperature in the building;
- smoke;
- a smell of hot substances, such as oil or compound;
- audible discharge or arcing;
- a smell of ozone;
- a nauseous odor that can indicate a release of SF6;
- signs of leaked oil around oil-filled equipment;
- signs of freshly leaked compound; and
- enclosures that are distorted or sooty.
In the opening case, water, an ozone smell, and a relay flag appeared; not going any further was the right decision.
The building technician’s routine inspection records the date and time, room temperature, the condition of the building, the position and indicator lamps of each panel as seen from outside, protection flags, the battery charger alarm, gas pressure or oil level where gauges are fitted, load meter readings on the low-voltage side, and the findings reported. The records show trends: rising room temperature, recurring alarms, or a load approaching the contracted power.
The load is read on the low-voltage side. Three-phase apparent power is calculated from the current in each phase:
where is apparent power (VA), is the phase-to-neutral voltage (V), and , , are the phase currents (A). For a balanced load, the current on the other side of the transformer is calculated from
where is the line current (A) and is the line-to-line voltage (V). This formula is an estimate that neglects transformer losses; readings on the 20 kV side are not the building technician’s task.
Worked example
The numbers in the examples below are practice figures unless their source is stated.
Example 1: current at two voltage levels. A hotel with a contracted power of 1,000 kVA is connected at 20 kV. Its line current is A. If the same power were delivered at 400 V, A, which is times larger.
Example 2: large consumer and outage schedule. Hotel A has a connected power of 1,000 kVA, which is 1 MVA, and Hotel B has 1,730 kVA. Both are medium-voltage customers because they are above 200 kVA, but only Hotel B is greater than 1 MVA and automatically counts as a large consumer under the Distribution Code; Hotel A counts as a large consumer only if the distribution operator so determines. Hotel B plans maintenance on its outgoing panel on the 21st. The written schedule is submitted no later than day , and PLN’s reply is received no later than day .
Example 3: headroom before adding load. Monthly records show a maximum demand of 812 kVA on a contracted power of 1,000 kVA, which is or 81.2 percent, with kVA remaining. Management wants to add a 180 kVA chiller. If the peaks coincide, the load becomes kVA or 99.2 percent of the contract, with no margin at all. The decision to increase the contracted power or rearrange the loads is made by the engineer together with PLN.
Example 4: transformer load from low-voltage currents. At peak hour, the main distribution board currents read 1,050 A, 980 A, and 1,010 A, with a phase-to-neutral voltage of 230 V. The apparent power is VA, which is 699.2 kVA, or of a 1,000 kVA transformer. The current on the 20 kV side is about A.
Example 5: SF6 in a cable trench. The cable trench below the switchgear measures 6 m by 0.6 m by 0.8 m, with a volume of m³. A concentration of 19 percent by volume is reached when m³ of gas collects there. If 0.6 m³ of SF6 from a leaking panel sinks and fills the trench, its concentration is , which is 20.8 percent, above 19 percent. A heavy gas does not spread evenly, so the bottom of the trench can be even more concentrated.
Example 6: two transformers in parallel. A building has two 1,000 kVA transformers with 5 percent impedance, each supplying half of the distribution board, with a bus coupler between them. Assuming a very strong upstream network, the short-circuit current on the 400 V side of one transformer with a rated current of 1,443.4 A (Example 1) is about A, which is 28.9 kA. If the coupler is closed while both transformers are running, both contribute fault current, so the current is about kA. A distribution board breaker with a 50 kA breaking capacity becomes too small. HSE notes that paralleling transformers increases fault energy and asks for interlocks or clear operating instructions to prevent it. Breaker breaking capacity is covered in Chapter 23.
Stop conditions
- On opening the substation room door there is a smell of heat, ozone, or a pungent odor, smoke is visible, a hiss, an unusual hum, or a bang is heard, or the room feels hot: do not enter; close the door, keep people away, and report to the chief engineer, then contact PLN for the PLN side and electrical OHS personnel or the substation maintenance contractor for the building side. If there is fire, follow the building fire procedure and tell the fire service that the room contains 20 kV equipment.
- Water has entered the substation room, is dripping near a switchgear panel or the transformer, or the floor is flooded: do not step into the water and do not touch the equipment; report to the chief engineer. De-energizing and inspection are carried out by PLN and licensed electrical OHS personnel.
- A breaker in a building-owned switchgear panel has tripped with a relay flag dropped or a protection alarm: do not reclose the breaker and do not reset the relay, including when a superior asks; record and report. Reclosing is decided by authorized personnel after the cause of the fault has been investigated.
- There is a request to operate a 20 kV switch or breaker, open a switchgear compartment door, replace a medium-voltage fuse, or apply work grounding: stop; that work belongs to PLN on the PLN side and to certified electrical OHS personnel under a work permit on the building side.
- A seal on the APP or the metering panel is broken or damaged, the meter appears to have been opened, or someone offers to “adjust” the meter: do not touch it and do not respond to the offer; report to management and PLN.
- There is a nauseous odor near SF6 switchgear, white powder is visible, or the gas pressure indicator shows an alarm: do not go any further and do not open the cable trench; leave the room, report, and contact the maintenance contractor or the switchgear supplier. The trench is treated as a confined space.
- A switchgear enclosure is dented, distorted, or sooty, or there are signs of freshly leaked oil or compound: do not stay in front of that panel longer than necessary and do not operate anything near it; report it for inspection by authorized personnel.
- The substation room is unlocked, hazard signs are missing, the room is used as storage, or unauthorized people have entered: ask the people to leave, lock the room, and report; stored goods are moved under the direction of authorized personnel.
Common misinterpretations
Guess what’s wrong first, then open the explanation.
Common misconception
All the equipment in the substation room belongs to PLN.
Why is it wrong?
For 20 kV connections, the connection point is located after the APP. The outgoing panel, the transformer, and the low-voltage distribution board generally belong to the customer, unless the SPJBTL states otherwise, and the customer is responsible for maintaining them.
Common misconception
Because the switchgear belongs to the hotel, the hotel technician may operate it.
Why is it wrong?
Ownership is not the same as authority. Operation and maintenance are carried out by technical staff with competency certificates and appointed electrical OHS personnel, under a work permit.
Common misconception
A tripped breaker may be switched on once to try.
Why is it wrong?
A breaker that tripped on a fault can close onto a fault that is still present, and switchgear failure is most likely during operation. The cause of the trip is investigated first by authorized personnel.
Common misconception
A substation room that is rarely entered is a safe place to store things.
Why is it wrong?
The substation room is a restricted area that must be clean and not used as storage. Goods block the way out, add fuel, and hide abnormal signs.
Common misconception
SF6 is not toxic, so a leak is not dangerous.
Why is it wrong?
Pure SF6 is indeed non-toxic, but it is heavier than air, can cause asphyxiation above 19 percent by volume, and its decomposition products after an arc irritate the skin, eyes, and respiratory tract.
Links to other chapters
Chapter 111 on building distribution transformers continues this chapter into the transformer: types, loading, temperature, oil, and losses. Chapter 13 on the low-voltage supply system covers connections and the APP for low-voltage customers, and Chapter 112 on reading PLN electricity meters and bills covers the figures on the meter. Safe conditions and work permits are in Chapter 76 and Chapter 2 · Safety, arc flash and PPE in Chapter 77, planned maintenance in Chapter 81, and the generator set that picks up the load when the substation is out in Chapter 36.
Exercises and worked solutions
The numbers in the exercises are for practice.
Try to answer first, then open the worked solution.
An office building with a contracted power of 555 kVA is connected at 20 kV. What is the line current on the 20 kV side, and is the building a medium-voltage customer?
Check my answer
See the worked solution
The current is A. The building is a medium-voltage customer because its power is more than 200 kVA, but it is not a large consumer because its power is not more than 1 MVA, unless the distribution operator so determines.
A staff member sees a dropped relay flag on the hotel’s outgoing switchgear panel after a power outage, while PLN states that its network is normal. Who investigates, and what must that staff member not do?
Check my answer
See the worked solution
The outgoing panel is located after the connection point, so investigating it is the hotel’s responsibility through certified personnel appointed by the owner, with the PJK2 as the decision maker. The staff member does not reclose the breaker and does not reset the relay, because the breaker can close onto a fault that is still present; they record and report.
During a monthly inspection, the technician finds traces of water on the floor in front of the switchgear and a rat’s nest in the cable trench. What is recorded and reported, and what is not done?
Check my answer
See the worked solution
The technician records the signs of water ingress, their location, and the signs of animals, then reports to the chief engineer so that the water source and the animal entry points are fixed. The technician does not open or enter the cable trench, because a substation trench can be classified as a confined space and lies close to 20 kV cables.
The main distribution board currents read 620 A, 700 A, and 660 A at 230 V. What is the load on an 800 kVA transformer in percent?
Check my answer
See the worked solution
The apparent power is VA, which is 455.4 kVA. The load is or 56.9 percent of the transformer, a figure recorded for trends and not for changing anything in the substation.
A hotel with a connected power of 2,180 kVA plans transformer maintenance that needs an outage on the 28th. By when must the written schedule be submitted, and by when must PLN reply?
Check my answer
See the worked solution
The hotel is a large consumer because its power is more than 1 MVA, so the written schedule is submitted no later than day . PLN replies no later than day , and the outage is carried out only after written approval.
A contractor offers to lower the relay settings on the outgoing panel to make it “more sensitive.” Why is that proposal not decided by the building technician?
Check my answer
See the worked solution
The customer’s protection must be coordinated with the distribution system protection, so settings changed carelessly can trip the PLN feeder or leave the transformer unprotected. A change of settings is studied by a protection engineer, coordinated with PLN, and carried out by authorized personnel.
References
External sources
- Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 10 Tahun 2021 tentang Keselamatan Ketenagalistrikanjdih.esdm.go.id
- Peraturan Menteri Ketenagakerjaan Nomor 12 Tahun 2015 tentang Keselamatan Dan Kesehatan Kerja Listrik Di Tempat Kerjajdih.kemnaker.go.id
- Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 04 Tahun 2009 tentang Aturan Distribusi Tenaga Listrikjdih.esdm.go.id
- Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 27 Tahun 2017 tentang Tingkat Mutu Pelayanan dan Biaya yang Terkait dengan Penyaluran Tenaga Listrik oleh PT Perusahaan Listrik Negara (Persero)jdih.esdm.go.id
- Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 7 Tahun 2024 tentang Tarif Tenaga Listrik yang Disediakan oleh PT Perusahaan Listrik Negara (Persero)jdih.esdm.go.id
- FAQpln.co.id
- Keeping electrical switchgear safe, HSG230 (2nd edition)hse.gov.uk
Revision history
| Date | Version | Change |
|---|---|---|
| November 14, 2026 | 1 | First published |
How to cite
Kurnia (2026). Building medium-voltage substations and service connections: 20 kV switchgear panels, distribution transformers, PLN metering and limiting equipment, the PLN and customer ownership boundary, substation rooms, and limits of authority. ARSTEMA Academy. Revised November 14, 2026. arstema.com/en/academy/konsep/gardu-dan-sambungan-tegangan-menengah-gedung-kubikel-20-kv-trafo-distribusi-alat-pengukur-dan-pembatas-pln-batas-milik-pln-dan-pelanggan-ruang-gardu-serta-batas-kewenangan
Self-check · 3 questions
Check your understanding before moving on
Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.
Safety limits still apply. This quiz tests reasoning; it doesn’t authorize mixing, adjusting, dismantling, live measurement, or field action.
An office building with a contracted power of 555 kVA is connected at 20 kV. What is the line current on the 20 kV side, and is the building a medium-voltage customer?
A staff member sees a dropped relay flag on the hotel’s outgoing switchgear panel after a power outage, while PLN states that its network is normal. Who investigates, and what must that staff member not do?
During a monthly inspection, the technician finds traces of water on the floor in front of the switchgear and a rat’s nest in the cable trench. What is recorded and reported, and what is not done?