Skip to content

Search ARSTEMA

Type a chapter, term, symptom, or tool.

    Fluids & Thermal · Chapter 23Applied

    By Kurnia · Published November 14, 2026 · Version 1 · 21 min read

    Generator diesel tanks and fuel systems

    day tanks and bulk storage tanks, transfer pumps, filters and water in diesel, declining fuel quality, spills, and record keeping

    During a utility power outage on a busy night, a hotel generator set stopped after forty minutes because its fuel filter was clogged with black sludge, and the inspection afterward found water at the bottom of the day tank and a logbook without a single water check. This chapter covers the diesel fuel system of a generator set from the building technician’s side: the arrangement of bulk storage tank, transfer pump, day tank, and filters; calculating how long the generator can run; bunds and overfill prevention under US and English rules; transfer pumps and level controls; water, microbes, and sludge in diesel according to the EPA; declining fuel quality and the B40 and B50 biodiesel blends in Indonesia; spills and the prohibition of hot work on tanks; and record keeping and stock reconciliation. Filling and transferring fuel outside the procedure, entering tanks, cleaning tanks, and hot work are written as limits of authority.

    Section you’re reading: Chapter opening

    On New Year’s Eve, utility power at a hotel failed while the ballroom was full. The generator set started, the transfer switch moved the load, and forty minutes later the engine stuttered and stopped. The duty technician found the fuel filter bowl full of cloudy liquid and black sludge that looked like coffee grounds. The next morning the fuel supplier found a layer of water at the bottom of the day tank. The generator logbook held only the monthly test run hours, with no water checks, filter changes, or stock reconciliation, and the level gauge of the bulk storage tank turned out to have been stuck for three months.

    A tank that is rarely inspected collects water, the water gives microbes a place to live, and their sludge clogs the filter just when the engine is needed. If it leaks or overflows during filling, the same tank contaminates the soil and the storm drains.

    Scope

    This chapter covers the diesel fuel system of a building generator set from the technician’s side: tanks, transfer pumps, filters, running time from stock, bunds, water and sludge, fuel quality, spills, and record keeping. The technician’s role is to inspect, read levels, record, test what the manual permits, and report.

    Generator sets and transfer switches are covered in Chapter 36 · Electrical & Control on generator sets, transfer switches, and standby supply. Used oil, the sequence for handling oil spills, and the containment formula are in Chapter 34 · Water & Water Treatment on used cooking oil, grease, and used oil, while oily water and used absorbents as B3 waste are in Chapter 35 · Water & Water Treatment on B3 waste. Entering tanks is covered in Chapter 11 · Safety on confined spaces, spill kits in Chapter 6 · Safety on chemicals in technician work, fire extinguishers in Chapter 17 · Buildings & Facilities on fire protection, and hot work in Chapter 13 · Mechanical & Mechatronics on welded joints and hot work.

    This chapter gives no steps for filling tanks, transferring fuel between tanks, draining water from tank bottoms, cleaning tanks, or polishing fuel. Filling is done by the supplier’s tanker crew together with the assigned building staff member, and the other work by the assigned staff member or contractor, all according to the building’s written procedure. Tanks are entered only with a confined space entry permit, and hot work near a tank or fuel line is done only with a hot work permit. US and English data are written as data of those countries. Indonesian regulatory figures for building diesel tanks are not given here; as of November 2026 the requirements are to be asked of the building management, the fuel supplier, and the local fire service.

    Arrangement of a generator fuel system

    A bulk storage tank is a large tank that holds the building’s diesel reserve, above ground or buried. A day tank is a small tank near the generator set that feeds the engine directly. A fuel transfer pump moves diesel from the bulk storage tank to the day tank when the day tank level falls. The engine’s fuel pump draws diesel from the day tank through the filters to the injection pump, and the excess returns to the tank through the return line.

    US military facility criteria require a separate day tank for each generator set fed from a bulk storage tank, fuel management, fuel maintenance, and leak detection for the bulk storage tank, and duplex filters so that the engine keeps running while one filter is changed. Their design list also names the location, venting, and elevation of the day tank relative to the injectors, fuel level controls, the transfer pump, and the supply and return line routing. Small generator sets often use a tank under the engine frame as the day tank.

    The technician traces this arrangement from the handover drawings to the field: every valve is labeled with its normal position, every tank has a readable level gauge, and every filter has a record of its change date.

    Capacity: how many hours the generator can run

    How long a generator can run is calculated from the usable volume and the consumption rate:

    t=VusableV˙t = \frac{V_\text{usable}}{\dot{V}}

    where tt is the running time (h), VusableV_\text{usable} is the volume of diesel the pump can draw (L), and V˙\dot{V} is the fuel consumption (L/h) from the generator data sheet at the expected load. The usable volume is smaller than the capacity because the suction pipe does not reach the bottom, the top space is left empty, and water and sludge at the bottom must not be drawn in. Full load gives the shortest running time.

    How many hours must be available is set by building management together with the owners of the services the generator protects, for example hospital operating rooms or hotel lifts. For comparison, US military criteria require at least seven days of fuel, from an on-site tank or from a supplier confirmed to be able to deliver during long outages; when the supplier covers this, each generator set still has a local 24-hour tank at full-load consumption. That figure is a requirement for military facilities in another country, not a requirement for hotels in Indonesia, but it shows that tank capacity is a decision about how long an outage the building wants to ride through (Example 1).

    Tanks, bunds, and overfill prevention

    The US oil spill prevention rule, Spill Prevention, Control, and Countermeasure (SPCC), applies to facilities with an aggregate aboveground oil storage capacity of more than 1,320 US gallons or a completely buried storage capacity of more than 42,000 US gallons, where a spill could reasonably be expected to reach navigable waters. What counts is the container capacity, not the amount currently stored, and only containers of 55 US gallons or more. The EPA page updated in November 2026 still uses the same thresholds.

    The EPA’s prevention measures include containers suitable for the oil, overfill prevention such as a high-level alarm or an audible vent, a bund for the bulk storage tank that holds the full tank capacity plus possible rainfall, and general containment such as sorbents, drip pans, or curbing where oil is transferred. According to the EPA, a double-walled tank may also suffice.

    A bund is an oil-tight wall and floor around a tank that holds the tank’s contents if the tank leaks. The oil storage guidance for businesses in England and Wales applies to oil containers with a capacity of 201 liters or more, including standby generators with a supply tank of 201 liters or more. The guidance requires a bund to hold 110 percent of the tank capacity; if one bund holds several tanks, its capacity is the greater of 110 percent of the largest tank or one quarter of the combined capacity; and a drip tray for drums holds at least one quarter of the capacity of the drums it can hold. The bund must be impermeable to oil and water, must have no pipe, valve, or opening for draining it, and every part of the tank and its valves must be inside it. Unlike the EPA, the guidance does not count double-walled tanks as secondary containment.

    Other requirements of that guidance are easy to check in the field: tanks and pipes are protected from vehicle impact; sight gauges are fixed with brackets and fitted with a self-closing valve; a tank whose vent and body cannot be seen from the fill point has an automatic overfill prevention device; and remote filling uses a drip tray at the fill point. Remote fill is filling a tank from a fill point outside the bund, often at the edge of the tanker access road.

    Transfer pumps and level control

    A level switch in the day tank starts the transfer pump when the level falls to the low point and stops it at the high point. Above the high point there is usually a high-level alarm, and many day tanks have an overflow pipe that returns the excess to the bulk storage tank. A low-level alarm is fitted because an empty day tank stops the generator even when the bulk storage tank is still full.

    The England and Wales guidance requires a pump on a fixed tank to have a valve in its feed line that prevents the tank from emptying if the pump or its pipe is damaged, to be protected from impact, and to be secured against theft, for example by locking it or cutting its power when not in use. In routine inspection the technician looks for weeping at pump seals, joints, and hoses, reads and compares the levels of both tanks, and confirms that level alarms appear on the generator panel or the building system. Alarm and pump tests are run by the assigned staff member according to the manual. Work on the motor, pump panel, and level switches is the work of an electrician with energy isolation as in Chapter 76 · Electrical & Control on safe work and LOTO.

    Symptoms to report: the pump runs longer than usual, the pump cycles on and off frequently, the high-level alarm sounds, and the bulk storage tank level does not change although the generator has just run.

    Water in diesel and filters

    A tank breathes through its vent as the temperature rises and falls, and water vapor from the air condenses on the cold inner walls of the tank. Rainwater enters through a fill cap that does not seal or a damaged vent, and a small amount of water can be carried in with a delivery. Water is heavier than diesel, so it collects at the bottom of the tank.

    The EPA notes that regularly checking for and removing water at the bottom of diesel tanks is widely recognized as a critical preventive method for reducing corrosion. In EPA research in 2016 on 42 underground diesel tank systems, 35 of them, or 83 percent, showed moderate or severe corrosion of metal components inside the tank, and fewer than 25 percent of their owners had reported corrosion before the tank was inspected internally. The cause has not been confirmed, but microbiologically influenced corrosion appears to play a large part. Owners with corrosion sometimes find sludge like coffee grounds clogging their filters, and the EPA recommends visual inspection of filters and tank access points even when there are no symptoms yet. Those data come from underground tanks in the United States; a similar mechanism can occur in building diesel tanks.

    Microbiologically influenced corrosion is corrosion accelerated by the products of microbial metabolism; in diesel tanks the microbes live mainly at the boundary between the water layer and the diesel and form slime and sludge that are carried to the filters.

    A fuel water separator is a fuel filter with a bowl underneath in which water separated from the diesel collects. A bowl that contains water or sludge indicates that the tank upstream needs to be checked. Water at the bottom of a tank is checked with a dipstick coated with water-finding paste, a paste that changes color when it touches water, or with a bottom sampler. In a horizontal cylindrical tank, the measured depth of the water layer is converted to a volume with the area of a circular segment:

    V=[r2arccos⁡(r−hr)−(r−h)2rh−h2]LV = \left[r^2 \arccos\left(\frac{r-h}{r}\right) - (r-h)\sqrt{2rh-h^2}\right] L

    where VV is the volume of liquid below height hh (m³), rr is the inner radius of the tank (m), hh is the liquid height from the bottom (m), LL is the tank length (m), and arccos is in radians. The formula applies for 0≤h≤2r0 \le h \le 2r in a level tank with the ends taken as flat; a sloping tank collects a thicker water layer at one end (Example 4). Water drained from tank bottoms and filter bowls is mixed with diesel and is handled as B3 waste as in Chapter 35 · Water & Water Treatment.

    Declining fuel quality

    Diesel stored for a long time changes in quality. The fuel reacts with oxygen to form gums and sediment, and water and microbes add sludge at the bottom. Standby generators make this worse because the monthly test run uses only a small part of the tank contents, so most of the diesel stays for years.

    US military facility criteria state that fuel for tanks of 24-hour capacity or more should not be biodiesel, because a one-hour test run never uses all the fuel in the tank. The EPA lists biodiesel and ultra-low sulfur diesel among emerging fuels that may not always be compatible with all tank systems and can sometimes increase corrosion.

    In Indonesia, the diesel on the market is blended with biodiesel. The government set diesel with a 40 percent palm-based biodiesel blend (B40) from January 1, 2025, on the basis of ESDM Ministerial Decision 341.K/EK.01/MEM.E/2024. The B50 mandate was launched by the Ministry of Energy and Mineral Resources (ESDM) on July 9, 2026. As of November 2026 the legal basis and full schedule of B50 cannot be confirmed; check with the Ministry of ESDM and the supplier.

    The generator’s diesel stock is therefore monitored together with its turnover. Fuel turnover is the average time diesel stays in the tank before it is used, that is, the stock volume divided by the annual consumption (Example 6). Fuel quality is tested by the supplier or a laboratory; for microbial contamination, the EPA names the industry guide ASTM D6469. Storage limits and the fuel quality the engine accepts are asked of the generator manufacturer and the supplier. Fuel polishing is filtering diesel and separating water from it in the tank with a circulating unit, done by a contractor according to the building procedure; cleaning inside a tank that requires a person to enter follows Chapter 11 · Safety.

    Spills and fire

    Diesel spills most often happen at the fill point during delivery, at the joints and hoses of the transfer pump, and at a day tank that overflows because a level switch has failed. The sequence for handling oil spills is covered in Chapter 34 · Water & Water Treatment and spill kits in Chapter 6 · Safety. For diesel tanks, storm drains and floor drains near the fill point and the bund are covered first, because diesel that enters a drain leaves the building. Rainwater in an open bund is not drained until the assigned staff member has confirmed that it is free of oil; oily water is handled as waste as in Chapter 35 · Water & Water Treatment.

    Diesel does not ignite as easily as gasoline at room temperature, but an empty diesel tank can explode when heated. HSE records incidents in vehicle repair workshops in which workers suffered serious burns when the diesel tanks they were repairing exploded; the common feature was that the tanks had not been properly cleaned and gas-freed before hot work. HSE asks for a risk assessment before welding, cutting, or grinding, and for cold methods or replacement to be considered. Hot work on or near tanks and fuel lines is therefore a stop condition until there is a hot work permit as in Chapter 13 · Mechanical & Mechatronics. Fire extinguishers for liquid fires are covered in Chapter 17 · Buildings & Facilities.

    Record keeping and periodic inspection

    The EPA requires facilities covered by the SPCC rule to inspect aboveground pipes and tanks visually according to industry standards and to keep a written record of those inspections. An SPCC Plan includes, among other things, a facility diagram, secondary containment, inspections, personnel training, record keeping, and a five-year plan review. Buildings in Indonesia are not bound by that rule, but its structure is useful as a framework for the logbook.

    The generator fuel logbook contains at least:

    1. The levels of both tanks, with date, time, and the name of the reader.
    2. Every delivery: the ordered volume, the volume on the tanker meter, the levels before and after, and the document number.
    3. Generator running hours, load, and type of run: test, outage, or maintenance.
    4. Water checks at tank bottoms and filter bowls, and water drained by the assigned staff member.
    5. Filter changes, the condition of the old filter, and fuel quality test results.
    6. Visual inspection of tanks, bund, pipes, pump, alarms, and any weeping or spills.

    Fuel reconciliation is the comparison between the fuel that has left the tank and the fuel that should have been used:

    ΔV=Vstart+Vreceived−Vend\Delta V = V_\text{start} + V_\text{received} - V_\text{end}

    where VstartV_\text{start} and VendV_\text{end} are the stock at the start and end of the period (L) and VreceivedV_\text{received} is the volume received (L). If ΔV\Delta V is well above the consumption expected from the running hours, there is a leak, theft, or an error in the level gauge or the records, and the difference is reported (Example 5).

    Worked example

    The numbers in the examples below are practice numbers unless their origin is stated. The hotel uses a generator set consuming 95 L/h at full load and 40 L/h at test load, a horizontal cylindrical bulk storage tank 1.6 m in diameter and 4.0 m long with a nominal capacity of 8,000 L, and a 1,000 L day tank.

    Example 1: running time from stock. If 90 percent of the day tank is usable, that tank alone gives t=900/95=9.5t = 900/95 = 9.5 h at full load. Consumption for 24 hours at full load is 24×95=2,28024 \times 95 = 2{,}280 L, so this tank does not meet the local 24-hour tank in the US military criteria. With 90 percent of the bulk storage tank also usable, the usable stock becomes 0.9×8,000+900=8,1000.9 \times 8{,}000 + 900 = 8{,}100 L, that is, 8,100/95=85.38{,}100/95 = 85.3 h or about 3.6 days. Seven days at full load would require 7×24×95=15,9607 \times 24 \times 95 = 15{,}960 L. The technician reports the 85 hours as the running time without a new delivery; adding a tank or securing deliveries is a management decision.

    Example 2: the SPCC threshold if the hotel were in the United States. One US gallon equals 3.785 L. The bulk storage tank is 8,000/3.785=2,1148{,}000/3.785 = 2{,}114 gallons and the day tank 264 gallons. A 200 L oil drum holds 200/3.785=52.8200/3.785 = 52.8 gallons, below 55 gallons, so it is not counted. The total is 2,114+264=2,3782{,}114 + 264 = 2{,}378 gallons, more than 1,320 gallons, so a facility like this in the United States would be covered by the SPCC rule if its spills could reach navigable waters. For a hotel in Indonesia, this calculation only practices reading a threshold stated as capacity.

    Example 3: height of the bulk storage tank bund. Under the England and Wales guidance, the bund for an 8,000 L tank holds 1.1×8,000=8,8001.1 \times 8{,}000 = 8{,}800 L, that is, 8.8 m³. The bund floor is 6.0 m by 3.0 m, an area of 18 m². Ignoring the tank, the height is 8.8/18=0.498.8/18 = 0.49 m. The cylindrical tank stands on saddles 0.3 m high, and the part of the tank below the liquid surface takes up space. With a trial height of 0.53 m, the tank is immersed 0.53−0.3=0.230.53 - 0.3 = 0.23 m, and the immersed tank volume is calculated with the segment formula in the section on water in diesel, with r=0.8r = 0.8 m, h=0.23h = 0.23 m, and L=4.0L = 4.0 m, giving 0.71 m³. The containment capacity is 18×0.53−0.71=8.8318 \times 0.53 - 0.71 = 8.83 m³, just above 8.8 m³, so the required liquid height is about 0.53 m, before extra space for rainwater if the bund is open.

    Example 4: water at the bottom of the bulk storage tank. The paste on the dipstick changes color up to 6 cm from the bottom. The segment formula with r=0.8r = 0.8 m, h=0.06h = 0.06 m, and L=4.0L = 4.0 m gives 0.098 m³, that is, 98 L of water. The full tank capacity by the same formula is π×0.82×4.0=8.04\pi \times 0.8^2 \times 4.0 = 8.04 m³, consistent with the nominal capacity of 8,000 L. The finding is reported so that the water is drained by the assigned staff member and its source is found, for example a fill cap or vent.

    Example 5: monthly stock reconciliation. Starting stock 6,200 L, no deliveries, ending stock 5,450 L. The fuel that has left the tank is ΔV=6,200+0−5,450=750\Delta V = 6{,}200 + 0 - 5{,}450 = 750 L. The records show the generator ran 6.5 hours at test load, so the expected consumption is 6.5×40=2606.5 \times 40 = 260 L. The difference of 750−260=490750 - 260 = 490 L is too large to be a level gauge reading error. The technician checks for weeping, compares the level gauge with the dipstick, and reports the difference.

    Example 6: diesel turnover for a standby generator. Every month the generator is tested for one hour at test load, 12×40=48012 \times 40 = 480 L per year, and last year’s outages totaled 10 hours at an average consumption of 70 L/h, that is, 700 L. Annual use is 480+700=1,180480 + 700 = 1{,}180 L. With an average stock of 8,000 L, the turnover is 8,000/1,180=6.88{,}000/1{,}180 = 6.8 years. That biodiesel-blended diesel stays in the tank for years, a reason to ask the supplier for periodic quality tests, to ask the manufacturer about storage limits, and to review the stock size with management.

    Stop conditions

    1. The work would require a person to enter the bulk storage tank or the day tank, or to put their head and body through the manhole: postpone; the work proceeds only with a confined space entry permit as in Chapter 11 · Safety, and a tank cleaning contractor takes over.
    2. The work would require welding, cutting, grinding, or heating a tank, a fuel line, or anything near them: stop; the work proceeds only with a hot work permit as in Chapter 13 · Mechanical & Mechatronics, after the tank has been declared clean and gas-free by the competent party.
    3. Diesel is dripping or spilling from a tank, pump, hose, or fill point, or the day tank is overflowing: switch off the transfer pump from a safe location if the procedure permits, cover nearby drains, keep ignition sources away, and report to the chief engineer; a large spill or one that enters a drain is handled by the building emergency response team as in Chapter 34 · Water & Water Treatment.
    4. Someone has asked for a tank to be filled, fuel to be transferred between tanks, or water to be drained from a tank bottom without a written procedure and without an assigned person: refuse and postpone until the chief engineer assigns a staff member and the procedure is available.
    5. The filter bowl repeatedly contains water or sludge, filters clog quickly, or the generator stutters during a test: record and report; the fuel supplier or a polishing contractor checks the fuel quality, and the generator technician checks the engine fuel system.
    6. A level alarm, the transfer pump, or a level switch does not work when tested, or the repair would require opening an electrical panel: the generator is recorded as having reduced readiness, and an authorized electrician does the work with energy isolation as in Chapter 76 · Electrical & Control.
    7. The bund is cracked, its drain valve is open, or the stock reconciliation shows a large unexplained difference: report to the chief engineer; the tank and bund are inspected by a tank contractor before refilling.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    A full tank means the generator is ready.

    Why is it wrong?

    A full tank with water and sludge at the bottom can still stop the generator within an hour, as in the opening case.

    Common misconception

    Diesel does not go bad even when stored for years.

    Why is it wrong?

    Diesel ages, collects water, and gives microbes a home, while the stock of a standby generator can stay for years, as in Example 6.

    Common misconception

    A few centimeters of water do not matter.

    Why is it wrong?

    In Example 4, a 6 cm layer at the bottom of a horizontal tank is already almost 100 L.

    Common misconception

    A double-walled tank never needs a bund anywhere.

    Why is it wrong?

    The EPA accepts it as one form of containment, while the England and Wales guidance does not. The form of containment follows local rules.

    Common misconception

    An empty diesel tank is safe to weld.

    Why is it wrong?

    HSE records serious burns when empty diesel tanks that had not been cleaned and gas-freed were repaired with hot work.

    Chapter 36 · Electrical & Control on generator sets and transfer switches covers the electrical side of the generator this system supplies. Chapter 34 · Water & Water Treatment on used oil gives the spill sequence and the containment formula, and Chapter 35 · Water & Water Treatment on B3 waste handles oily water and used absorbents. Chapter 11 · Safety on confined spaces and Chapter 13 · Mechanical & Mechatronics on hot work set the limits for work inside and on tanks, and Chapter 19 on carbon footprint calculates emissions from the diesel recorded in this logbook.

    Exercises and worked solutions

    The numbers in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. A 600 L day tank is 85 percent usable, and the generator consumes 60 L/h at the expected load. How many hours does the day tank last if the transfer pump fails?

      Check my answer
      See the worked solution

      The usable volume is 0.85×600=5100.85 \times 600 = 510 L, so the day tank lasts 510/60=8.5510/60 = 8.5 hours. The low-level alarm gives time to respond to a pump failure before the generator stops, so that alarm is also tested on schedule.

    2. One bund holds three separate tanks of 2,000 L, 2,000 L, and 1,500 L that are not connected to each other. Under the England and Wales guidance, what bund capacity is required?

      Check my answer
      See the worked solution

      The largest tank is 2,000 L, so 110 percent of it is 2,200 L, while one quarter of the combined capacity is 0.25×5,500=1,3750.25 \times 5{,}500 = 1{,}375 L. The bund holds the larger, 2,200 L, because a leak from the largest tank must be fully contained.

    3. Why does water collect at the bottom of a tank even though the delivered diesel is clean?

      Check my answer
      See the worked solution

      The tank breathes through its vent as the temperature changes, and water vapor from the air condenses on the cold tank walls; rainwater also enters through the fill point and a damaged vent. Water is heavier than diesel, so it collects at the bottom even when the delivered diesel is clean.

    4. In last month’s reconciliation, starting stock was 4,000 L, a delivery of 3,000 L arrived, ending stock was 6,500 L, and the generator was tested for 2 hours at 40 L/h. What does the technician conclude?

      Check my answer
      See the worked solution

      The fuel that has left the tank is 4,000+3,000−6,500=5004{,}000 + 3{,}000 - 6{,}500 = 500 L, while the expected consumption is only 2×40=802 \times 40 = 80 L. The difference of 420 L can come from a delivery smaller than the document, a faulty level gauge, a leak, or theft, so the technician checks the documents, measures with the dipstick, looks for weeping, and reports.

    5. A contractor wants to weld a new bracket onto a day tank that has been emptied. What is the technician’s answer?

      Check my answer
      See the worked solution

      The technician refuses the plan, because an empty diesel tank can explode when heated, as in the incidents recorded by HSE. The work proceeds only with a hot work permit after the tank has been declared clean and gas-free, or with a cold method such as a bolted bracket approved by the chief engineer.

    6. The fuel water separator bowl has contained water at every check for three months. What does the technician do, and what does the technician not do alone?

      Check my answer
      See the worked solution

      The technician records the findings, checks for water at the bottom of both tanks with the dipstick and paste, checks the fill caps and vents, and then reports to the chief engineer. Draining water from tank bottoms and polishing the fuel are not done alone without an assignment and a written procedure, because that work transfers fuel and produces B3 waste.

    References

    External sources

    • Spill Prevention, Control, and Countermeasure (SPCC) Regulation, 40 CFR part 112: A Facility Owner/Operator’s Guide to Oil Pollution Preventionepa.gov
    • Does the Spill Prevention, Control, and Countermeasure (SPCC) Rule Apply to Your Facility?epa.gov
    • Oil storage regulations for businessesgov.uk
    • UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby Power Applications, Change 3wbdg.org
    • Notice Of Corrosion Risks In Underground Storage Tanks Storing Diesel Fuelepa.gov
    • Emerging Fuels and Underground Storage Tanksepa.gov
    • Fire and explosionhse.gov.uk
    • Wujudkan Ketahanan Energi dan Kurangi Impor, Menteri ESDM: Mandatori B40 Berlaku 1 Januari 2025esdm.go.id
    • Luncurkan Mandatori B50, ESDM Tegaskan Kesiapan Indonesia Perkuat Kedaulatan Energiesdm.go.id

    Revision history

    DateVersionChange
    November 14, 20261First published

    How to cite

    Kurnia (2026). Generator diesel tanks and fuel systems: day tanks and bulk storage tanks, transfer pumps, filters and water in diesel, declining fuel quality, spills, and record keeping. ARSTEMA Academy. Revised November 14, 2026. arstema.com/en/academy/konsep/tangki-dan-sistem-bahan-bakar-solar-genset-tangki-harian-dan-tangki-timbun-pompa-transfer-saringan-dan-air-dalam-solar-mutu-bahan-bakar-yang-menurun-tumpahan-serta-pencatatan

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated
    1

    A 600 L day tank is 85 percent usable, and the generator consumes 60 L/h at the expected load. How many hours does the day tank last if the transfer pump fails?

    2

    One bund holds three separate tanks of 2,000 L, 2,000 L, and 1,500 L that are not connected to each other. Under the England and Wales guidance, what bund capacity is required?

    3

    Why does water collect at the bottom of a tank even though the delivered diesel is clean?

    Self-assessment progress0%