    Buildings & Facilities · Chapter 37Quantitative

    By Kurnia · Published November 13, 2026 · Version 1 · 21 min read

    Building paints and coatings

    what the coating does, surface preparation, moisture and alkali, coating systems, calculating paint quantities, coating defects, and material safety and ventilation

    A hotel corridor wall next to the guest bathrooms is repainted twice in one year, and twice the paint blisters and peels, because the source of the moisture is never looked for. This chapter covers building paints and coatings from the building technician’s side: what the coating does and the parts of a paint, surface preparation, the moisture content of wood and the plastic sheet test on concrete, alkali in new plaster and concrete, coating systems and compatibility between coats, calculating the surface area, the theoretical spreading rate, wet and dry film thickness, the number of coats, and losses, reading coating defects from their causes, and the safety of solvents, volatile organic compounds, old lead paint, and ventilation. Threshold figures come from documents of the NPS, the United States Department of Defense coatings criteria, the EPA, and the HSE, and are written as data from their countries of origin; product spreading rates are read from the technical data sheet. Stripping old lead paint, spraying in enclosed spaces, special coatings, and repairing water sources are set out as work for authorized parties.

    Section you’re reading: Chapter opening

    The fifth-floor corridor wall of a hotel, right next to a row of guest bathrooms, was repainted in February. By June the paint had blistered in spots the size of a fingernail, then peeled down to the plaster. The painter came back, scraped, patched, and repainted with the same paint. In October the same blisters appeared in the same place. What nobody had checked was the bathroom exhaust fan behind that wall, which turned out to have been dead since the start of the year. The United States Department of Defense coatings criteria give an almost identical example: localized peeling on a wall outside a bathroom may come from inadequate bathroom ventilation, and water problems and spaces with inadequate ventilation are corrected before painting.

    The damaged paint in that corridor is a symptom, not the disease. A technician who understands what a surface needs before it is painted and how much paint is really required can break that cycle of repainting.

    Scope

    This chapter covers architectural paints and coatings on walls, ceilings, door frames, and doors from the building technician’s side: coating systems, surface preparation, moisture, paint quantities, coating defects, and materials and ventilation. The threshold figures in this chapter come from United States and United Kingdom documents and are read as data from those countries. The spreading rate, drying time, and weather limits of a product are read from that product’s technical data sheet.

    Chemicals, labels, and safety data sheets are covered in Chapter 6 · Safety on chemicals in technician work, and organic solvents in Chapter 20 · Chemistry on organic chemistry for technicians. Binder polymers are in Chapter 22 · Chemistry on polymers and elastomers, corrosion and protective coatings on metal in Chapter 19 · Chemistry on electrochemical corrosion, and mold in Chapter 9 · Biology & Microbiology on mold in buildings. Personal protective equipment is in Chapter 5 · Safety, work at height and scaffolds in Chapter 10 · Safety, confined spaces in Chapter 11 · Safety, and work permits in Chapter 76 · Electrical & Control. The water sources that damage paint are covered in Chapter 35 on roofs and waterproofing and Chapter 36 on cracks in walls and concrete.

    Outside the building technician’s authority: stripping old paint that may contain lead, using chemical paint strippers, spraying solvent-borne paint in enclosed spaces, coating epoxy floors, drinking water tanks, or structural steel, repainting fire-resistant coatings on steel, and repairing the roofs, gutters, pipes, or cracks that are the source of water. That work belongs to contractors appointed by the building management, with a work permit. The building technician inspects, measures, calculates, paints small areas with low-risk materials when assigned, and reports.

    What the coating does and the parts of a paint

    On wood, the main purpose of painting is to keep water out, because one of the main causes of wood deterioration is water penetration. On plaster and concrete, paint seals the pores, makes cleaning easier, and gives color; on metal, paint acts as a corrosion barrier (Chapter 19 · Chemistry on electrochemical corrosion). Those functions work only while the coating is intact and adhering.

    The binder is the part of a paint that forms the solid film and bonds it to the surface, for example acrylic resin in emulsion paint or oil and alkyd resin in oil paint. Pigment is the powder that gives color and hiding power. The solvent or thinner is the liquid that makes the paint spreadable and then evaporates; in waterborne paint the liquid is mainly water, while in solvent-borne paint it is an organic solvent. Volume solids is the percentage of the liquid paint’s volume that remains as a dry film after the liquid has evaporated. This figure is written on the technical data sheet and is the basis of the spreading rate calculation.

    A coat that has just been applied is called the wet film, and once dry it is called the dry film. Many acrylic and alkyd paints are dry to the touch in about one hour, while traditional linseed oil paint can need several days to several weeks to dry fully. A second coat applied before the first coat is dry can sag or crack, so the time between coats is taken from the technical data sheet.

    Surface preparation

    The surface, new or old, must be sound and able to take paint, and before painting an interior, leaks from roofs, gutters, pipes, or heaters are found and repaired first. The United States Department of Defense coatings criteria set out the same order: rotten wood is replaced, roofs and drainage are repaired, room ventilation is put right, and then cracks and holes are filled.

    Preparation consists of five steps:

    1. Find and stop the source of water or water vapor, then let the surface dry.
    2. Clean off dirt, oil, and chalk from old paint; concrete and brick surfaces are best cleaned with water and detergent.
    3. Scrape off loose paint and feather the edges; paint that is still firmly bonded does not need to be stripped.
    4. Fill cracks and holes with a material that is compatible with the paint to be used.
    5. Check the moisture (next section), then apply the primer.

    Dark spots on paint can be dirt or mold. Mold can live only in shady, warm, moist places, so the lasting remedy is to change those conditions. Cleaning mold is covered in Chapter 9 · Biology & Microbiology on mold in buildings. Old buildings also need a lead check before their old paint is scraped or sanded, as covered in the safety section.

    Moisture and alkali

    Wood moisture content is the mass of water in wood compared with the mass of the dry wood, in percent, measured with a moisture meter. The guide to exterior wood paints published by the NCPTT, the preservation technology center under the United States National Park Service, records that at moisture contents above 15 percent new coatings are generally not recommended because adhesion and penetration suffer, that most manufacturers ask for a moisture content no higher than 15 percent, that blistering and peeling of existing paint are likely above 15 percent and extremely likely above 20 percent, and that wood above 20 percent is at high risk from decay fungi and insects. The same guide recommends measuring the moisture content every year, even when the paint looks good, to find out whether water is trapped in the wood.

    Concrete and plaster can look dry while they still carry water vapor from inside or from the ground. The plastic sheet test is a simple test that detects that vapor: a sheet of plastic is taped tightly to the surface, and after 24 hours the inside is checked; if there is condensation, the moisture is not yet acceptable.

    Alkali in plaster and concrete comes from lime and cement. Oil and alkyd paints are not applied directly to concrete or brick, because the alkali in concrete breaks down the oil binder and the paint peels; a waterborne paint can serve as the first coat, with oil paint applied over it if a harder surface is needed. For plaster, the NPS guide to painting interiors states that gypsum plaster can be painted once its water has evaporated, and lime plaster can be primed almost as soon as it is dry with an alkali-resistant primer such as acrylic latex. For new cement plaster, the waiting time and the type of primer are taken from the technical data sheet.

    Efflorescence is a white salt deposit left on the surface when water from inside the wall evaporates. The deposit is cleaned off before painting, but its appearance shows that water is still moving inside the wall.

    Coating systems

    A coating system is the sequence of primer, an intermediate coat if any, and a finish coat chosen for one type of surface and one service condition. The primer is the first coat, which is partly absorbed by the surface below it and is also compatible with the paint above it. The finish coat gives color, washability, and weather resistance.

    For wood, a two-coat system is usually enough. Recoats added during repairs build up the system until the whole coating comes off, so the United States military coatings criteria state that generally no more than three or four recoats are applied over an existing system, after which some or all of the old coating is removed. For concrete and brick, a two-coat waterborne system gives a breathing film that is not strongly affected by moisture in the concrete; the waterborne paint also serves as its own primer unless stated otherwise.

    Compatibility between coats decides whether a new coat bonds to the old one. The general rule from the NPS guide to painting interiors is that softer or weaker paints always go over harder or stronger paints; oil paint can go over well-bonded latex, but the reverse risks failure. When latex paint is to be applied over smooth old alkyd paint, the old surface is lightly sanded, wiped, and given a suitable transition primer. For that reason the coating system is chosen with the supplier, stating the surface, the old paint, and the service conditions.

    Calculating paint quantities

    The paint quantity calculation has four steps: surface area, theoretical spreading rate, losses, and the number of containers.

    Surface area is the area that is actually painted:

    A=∑(pi×hi)−∑AopeningsA = \sum (p_i \times h_i) - \sum A_{openings}

    where AA is the net area in m², pip_i the length of each surface in m, hih_i its height in m, and AopeningsA_{openings} the area of doors, windows, and other surfaces that are not painted.

    Theoretical spreading rate is the area that one liter of paint can cover at a given dry film thickness when no paint is lost. One liter of paint with volume solids of VsV_s percent leaves Vs/100V_s/100 liter of solids, that is, Vs×10−5V_s \times 10^{-5} m³. That volume is spread to a thickness of tk×10−6t_k \times 10^{-6} m, so:

    St=10×VstkS_t = \frac{10 \times V_s}{t_k}

    where StS_t is the theoretical spreading rate in m²/L, VsV_s the volume solids in percent, and tkt_k the dry film thickness in micrometers (µm). For a paint with 100 percent solids, this formula is equivalent to the statement in the 2004 edition of the United States military coatings criteria that one gallon of paint applied evenly at 1 mil (0.001 inch) wet covers 1,600 square feet.

    Wet film thickness is the thickness of the paint just after it is applied, which can be measured with a wet film comb gauge. The dry thickness equals the wet thickness multiplied by the volume solids and divided by 100, so the wet thickness that has to be reached is:

    tb=100×tkVst_b = \frac{100 \times t_k}{V_s}

    This relationship holds only for paint as received from the manufacturer. Thinner lowers the volume solids, so the value must be recalculated before the formula is used, and the amount of thinner must not exceed the manufacturer’s recommendation.

    Loss is paint that is bought but does not become film: what is left in the can and roller, drips, spray mist that misses, and paint absorbed by rough surfaces. If kk is the loss fraction, the volume of paint for nn coats is:

    V=A×nSt×(1−k)V = \frac{A \times n}{S_t \times (1 - k)}

    with VV in liters. The value of kk depends on the application method, the surface, and skill, so the actual consumption of earlier jobs is recorded to estimate the next kk. The number of containers is VV divided by the contents of one container, rounded up.

    Coating defects and their causes

    Coating defects are read from their shape, their location, and which layer shows at their base. The NPS guide to exterior paint on wood gives the following descriptions and causes.

    DefectAppearanceMain causeDirection of treatment
    Chalkingpowdery surface, powder washed down by rainnatural weathering of the binder; excessive in certain formulationsclean off the chalk, rinse, dry, paint with a non-chalking paint
    Crazingfine interconnected cracks in the top coata thick coating that has become hard and brittlesand, then repaint before water gets in
    Intercoat peelingnew coat separates from the old coatdirty old surface or incompatible paint typesscrape off the loose coat, apply a compatible primer
    Solvent blisteringsmall blisters with a paint layer at their basesolvent-rich paint applied in direct sunlight, the surface dried too fastscrape, sand, paint in the shade
    Wrinklingtop coat puckeredpaint too thick, second coat before the first was dryscrape and sand smooth
    Peeling to the substratepaint off, wood or plaster visiblewater from inside or outside collecting behind the paintfind and stop the water source first
    Alligatoringdeep cracks through all layers, like reptile skinvery thick, brittle coating that no longer follows the movement of the woodremove all layers on that surface after lead has been checked

    The way to tell solvent blistering from moisture blistering is to cut one blister open: if another layer of paint shows at its base, solvent blistering is more likely; if bare wood shows, moisture is more likely the cause. For peeling caused by water, there is no sense in repainting before the water problem is dealt with, because the new paint will simply fail again. That is what happened in the hotel corridor in the opening case.

    The location of a defect also gives clues. Peeling near bathrooms, kitchens, or laundry rooms points to water vapor from inside, peeling below gutters or window sills to water from outside, and peeling that follows a crack line to Chapter 36 on cracks in walls and concrete.

    Material safety and ventilation

    Volatile organic compounds (VOCs) are organic substances that evaporate from liquids or solids at room temperature; paints, varnishes, and waxes contain organic solvents. The EPA records that levels of several organic compounds inside homes average 2 to 5 times the levels outside, and that during and for several hours after activities such as paint stripping, the levels can reach 1,000 times the outdoor background level. The EPA advises: increase ventilation when using products that emit VOCs, follow label precautions, do not store opened paint containers inside the building, and buy only as much as will be used right away.

    The UK HSE explains that solvents enter the body by breathing, because paint gives off solvent vapor as it is applied, dries, and cures, and also through the skin, the eyes, and contaminated food. Low exposure can cause irritation, headaches, nausea, and dizziness that increase the risk of accidents, while high concentrations of some solvents can cause unconsciousness and death. The HSE gives several control pointers:

    • Consider products with no or little organic solvent, for example waterborne paint.
    • Spraying puts more solvent into the air than a brush or roller.
    • Ventilation is always required; the higher the risk, the more ventilation is needed, and natural ventilation may not be enough for more hazardous work.
    • Keep lids on cans, use sealed containers for solvent-contaminated waste, and do not leave solvent-soaked rags lying around.
    • Particulate filters protect against spray mist but not against solvent vapor, which needs the right gas and vapor filter.

    The type of solvent and the VOC content are read from the label and the safety data sheet (Chapter 6 · Safety on chemicals in technician work), and selecting a respirator is covered in Chapter 5 · Safety on personal protective equipment.

    Lead paint is the hazard of old paint. In the United States, the sale of lead-based paint for homes, childcare facilities, and preschools was banned by the federal government in 1978, and paid work that disturbs painted surfaces in housing and child-occupied facilities built before 1978 must be done by certified parties using lead-safe work practices.

    The NPS guide states that virtually all paints made before 1950 used a lead compound as the white pigment; scraping and dry sanding release lead dust, and heating paint produces lead fumes. Stripping with an open flame is not recommended, among other reasons because of the danger of lead fumes. These are United States data. For buildings in Indonesia whose paint is old or of unknown origin, the technician does not dry sand, scrape large areas, or heat the paint before its lead content has been checked by a party authorized to test it.

    Worked example

    The numbers in the examples below are practice numbers, unless their origin is stated.

    Example 1: area of the corridor walls. A hotel corridor 40 m long with a wall height of 2.8 m is painted on both sides. The corridor has 20 room doors measuring 0.9 m by 2.1 m. The gross area is 2×40×2.8=2242 \times 40 \times 2.8 = 224 m², the door area 20×0.9×2.1=37.820 \times 0.9 \times 2.1 = 37.8 m², so the net area is 224−37.8=186.2224 - 37.8 = 186.2 m². The room doors are painted separately with a wood coating system.

    Example 2: theoretical spreading rate and wet thickness. The technical data sheet of an emulsion paint states volume solids of 40 percent, and the system calls for a dry film thickness of 35 µm per coat. The theoretical spreading rate is St=10×40/35=11.43S_t = 10 \times 40/35 = 11.43 m²/L. To get a dry thickness of 35 µm, the painter has to apply a wet thickness of tb=100×35/40=87.5t_b = 100 \times 35/40 = 87.5 µm. That figure of 87.5 µm is what is checked with the comb gauge during the work.

    Example 3: paint for two coats with a roller. For the corridor in Example 1 with the paint in Example 2, two coats, and a roller loss of 15 percent, V=186.2×2/(11.43×0.85)=38.3V = 186.2 \times 2/(11.43 \times 0.85) = 38.3 L. With 5 L containers, the number of containers is 38.3/5=7.738.3/5 = 7.7, rounded up to 8 containers or 40 L. Without losses, the calculation gives 186.2×2/11.43=32.6186.2 \times 2/11.43 = 32.6 L, that is 7 containers, and the second coat would run short of paint.

    Example 4: roller compared with spray. If the same corridor is sprayed with a loss of 35 percent, V=186.2×2/(11.43×0.65)=50.1V = 186.2 \times 2/(11.43 \times 0.65) = 50.1 L, about 12 L more than with a roller. If the paint contains 50 g/L of VOC, the VOC released during the roller job is 38.3×50=1,91538.3 \times 50 = 1{,}915 g, about 1.9 kg, and during the spray job 50.1×50=2,50550.1 \times 50 = 2{,}505 g, about 2.5 kg. The workers’ exposure differs far more, because spraying puts more solvent into the air and uses more paint in a shorter time. That is why spraying in a corridor occupied by guests is handed over to a contractor with planned ventilation and scheduling.

    Example 5: moisture content of a door frame before painting. The technician measures the moisture content at four points on a wooden frame: 13, 14, 17, and 22 percent. The first two points are below 15 percent and can be painted after sanding. The 17 percent point is above the figure most manufacturers ask for, so painting that part is postponed and it is measured again after drying. The 22 percent point, at the bottom of the frame near the floor, is above 20 percent, so the wood is probed with a blunt tool to look for soft areas and the water source is looked for. If the wood is soft, the frame is reported for repair by a carpenter.

    Example 6: measured wet thickness and dew point. The paint system in Example 2 calls for a total dry thickness of 70 µm. The comb gauge shows that the painter reaches only a wet thickness of 75 µm per coat, that is a dry thickness of 75×40/100=3075 \times 40/100 = 30 µm. The number of coats needed is 70/30=2.3370/30 = 2.33, rounded up to 3 coats, or the application is improved to reach 87.5 µm wet. That morning the wall surface temperature is 26 °C and the dew point of the air is 24.5 °C, a difference of 26−24.5=1.526 - 24.5 = 1.5 K. The 2004 edition of the United States military criteria asks for a surface temperature at least 5 °F above the dew point, that is 5/1.8=2.85/1.8 = 2.8 K, so painting is postponed until the difference is large enough or until the figure in the product’s technical data sheet is met.

    Stop conditions

    1. Old paint in an old building, or paint of unknown origin, is about to be scraped over large areas, dry sanded, or heated: do not start; ask the building management to have the lead content tested by a party authorized to test it, and hand the stripping over to a contractor able to work lead-safe.
    2. Workers or occupants complain of dizziness, nausea, headache, or eye irritation during or after painting: stop the work, get people out of the room, close the cans, add outdoor air, and report to the occupational safety supervisor.
    3. The job calls for spraying or for solvent-borne paint in a windowless room, an archive room, an electrical panel room, or a confined space: do not do it with natural ventilation only; hand it over to a contractor with mechanical ventilation and a work permit, and confined spaces follow Chapter 11 · Safety.
    4. The job calls for a chemical paint stripper, a strong solvent, or a material whose safety data sheet is not available: do not use it until the safety data sheet has been read and the supervisor has approved the method; chemical stripping is handed over to a contractor.
    5. The wood moisture content is above 20 percent, the wood feels soft when probed, the plaster is hollow or loose, or the plastic sheet test shows condensation: do not paint; report to the building management for repair by a carpenter or plasterer after the water source has been stopped.
    6. Paint peels repeatedly in the same place, or there are seepage stains, efflorescence, or a widening crack: do not repaint; trace the water source according to Chapter 35 on roofs and waterproofing and Chapter 36 on cracks in walls and concrete.
    7. The surface to be painted is on a facade, a high ceiling, or a roof edge: do the work only with access and a permit according to Chapter 10 · Safety on work at height.
    8. The surface is a fire-resistant coating on steel, the seals or strips of a fire-resistant door, an epoxy floor, a drinking water tank, or rusted structural steel: the technician must not paint it; hand it over to the specialist contractor appointed by the building management.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    The thicker the paint, the longer it lasts.

    Why is it wrong?

    A coating that is too thick becomes hard and brittle, then cracks and comes off as a whole; paint applied too thick can also wrinkle.

    Common misconception

    The spreading rate on the can is the real requirement.

    Why is it wrong?

    The spreading rate on the technical data sheet is a theoretical figure without losses; the real requirement is larger, as Example 3 shows.

    Common misconception

    A wall that looks dry is ready to paint.

    Why is it wrong?

    Concrete and plaster can carry water vapor from inside even when the surface looks dry. A 24-hour plastic sheet test or a moisture meter gives an answer that can be recorded.

    Common misconception

    Repainting fixes peeling.

    Why is it wrong?

    Peeling to the substrate usually comes from water behind the paint. As long as the water source is not stopped, the new paint fails again, as in the hotel corridor in the opening case.

    Common misconception

    Waterborne paint is safe, so no ventilation is needed.

    Why is it wrong?

    Waterborne paint lowers the solvent risk but does not remove it; the HSE states that ventilation is always required.

    Chapter 35 on roofs and waterproofing and Chapter 36 on cracks in walls and concrete cover the water sources that most often damage paint. Chapter 6 · Safety on chemicals in technician work completes the safety section, and Chapter 38 on door frames, doors, and locks covers fire-resistant doors whose seals must not be covered with paint.

    Exercises and worked solutions

    The numbers in the questions are used for practice.

    Try to answer first, then open the worked solution.

    1. A hotel room measuring 4 m by 3.5 m with a wall height of 2.7 m has one door of 0.9 m by 2.1 m and one window of 1.5 m by 1.2 m. How many liters of paint are needed for two coats if the theoretical spreading rate is 10 m²/L and the loss is 10 percent?

      Check my answer
      See the worked solution

      The room perimeter is 2×(4+3.5)=152 \times (4 + 3.5) = 15 m, so the gross area is 15×2.7=40.515 \times 2.7 = 40.5 m², minus the door at 1.89 m² and the window at 1.8 m², giving 36.81 m². The requirement is V=36.81×2/(10×0.9)=8.18V = 36.81 \times 2/(10 \times 0.9) = 8.18 L, so two 5 L containers are enough with some left over for small repairs.

    2. A contractor proposes alkyd paint directly on a new concrete wall so that it is more washable. What does the technician answer?

      Check my answer
      See the worked solution

      The alkali in concrete breaks down the oil binder, so alkyd paint applied directly will peel. If a harder surface is needed, the concrete is first given a waterborne primer and the oil paint is applied over it, according to the supplier’s technical data sheet.

    3. The meter shows a moisture content of 18 percent on a wooden window sill the day before the scheduled painting. What is the decision?

      Check my answer
      See the worked solution

      The figure of 18 percent is above the 15 percent that most manufacturers ask for, so painting is postponed. The technician looks for why the wood is wet, for example rainwater from the sill or the gutter, then measures again after the source has been stopped and the wood is dry.

    4. The 2004 edition of the United States military criteria states that one gallon of paint at a wet thickness of 1 mil covers 1,600 square feet. Show that this figure agrees with the metric spreading rate formula.

      Check my answer
      See the worked solution

      With 100 percent solids and a thickness of 25.4 µm, St=10×100/25.4=39.37S_t = 10 \times 100/25.4 = 39.37 m²/L, and one gallon of 3.785 L covers 39.37×3.785=149.039.37 \times 3.785 = 149.0 m². Since 1 m² equals 10.764 square feet, that area is 149.0×10.764=1,604149.0 \times 10.764 = 1{,}604 square feet, which the criteria round to 1,600.

    5. The wall paint next to the dishwashing room of a hotel kitchen peels every six months. What is the technician’s order of actions?

      Check my answer
      See the worked solution

      Repeated peeling next to a wet room points to water vapor from inside, so repainting without fixing the source will fail again. The technician checks the exhaust fan of the dishwashing room, looks for pipe seepage behind the wall, measures the wall moisture, and only after the source has been dealt with chooses a coating system for damp rooms together with the supplier.

    6. A painter wears a dust mask while painting a windowless archive room with solvent-borne paint, then complains of dizziness. What went wrong?

      Check my answer
      See the worked solution

      A dust mask filters only particles, while solvent vapor needs the right gas and vapor filter, and a windowless room lets the vapor build up. The work is stopped, outdoor air is brought into the room, the complaint is reported, and the work continues with low-solvent paint and mechanical ventilation, or is handed over to a contractor.

    References

    External sources

    • Preservation Brief 10: Exterior Paint Problems on Historic Woodworknps.gov
    • Preservation Brief 28: Painting Historic Interiorsnps.gov
    • Understanding Traditional and Modern Paints and Stains for Exterior Woodnps.gov
    • UFC 3-190-06 Protective Coatings and Paints (1 March 2021)wbdg.org
    • UFC 3-190-06 Protective Coatings and Paints (16 January 2004, cancelled)wbdg.org
    • Volatile Organic Compounds' Impact on Indoor Air Qualityepa.gov
    • Lead Renovation, Repair and Painting Programepa.gov
    • Construction hazardous substances: Solventshse.gov.uk

    Revision history

    DateVersionChange
    November 13, 20261First published

    How to cite

    Kurnia (2026). Building paints and coatings: what the coating does, surface preparation, moisture and alkali, coating systems, calculating paint quantities, coating defects, and material safety and ventilation. ARSTEMA Academy. Revised November 13, 2026. arstema.com/en/academy/konsep/cat-dan-pelapis-bangunan-fungsi-lapisan-persiapan-permukaan-kelembapan-dan-alkali-sistem-lapisan-menghitung-kebutuhan-cat-cacat-lapisan-serta-keselamatan-bahan-dan-ventilasi

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated
    1

    A hotel room measuring 4 m by 3.5 m with a wall height of 2.7 m has one door of 0.9 m by 2.1 m and one window of 1.5 m by 1.2 m. How many liters of paint are needed for two coats if the theoretical spreading rate is 10 m²/L and the loss is 10 percent?

    2

    A contractor proposes alkyd paint directly on a new concrete wall so that it is more washable. What does the technician answer?

    3

    The meter shows a moisture content of 18 percent on a wooden window sill the day before the scheduled painting. What is the decision?

    Self-assessment progress0%