By Kurnia · Published November 15, 2026 · Version 1 · 20 min read
Rainwater and flooding on a hotel site
rainfall intensity and runoff, drains and culverts, infiltration wells and detention ponds, flood pumps, rainy-season preparation, and responding to standing water
One hour of heavy rain floods the entrance of a hotel lobby, the drain along the parking lot overflows, and water runs down the ramp into the basement parking, while one of the two flood pumps fails to start. This chapter covers rainwater on a hotel site from the building technician’s side: rainfall intensity, duration, and return period, site runoff with the rational method and a composite runoff coefficient, drains, inlets, and culverts, infiltration wells and trenches with infiltration rates and drawdown times from the United States EPA practice sheets, detention ponds and storage volume, flood pumps and pump pits, rainy-season preparation, and responding to standing water according to the UK government and CDC guidance. The rainfall intensities and coefficients in the examples are practice figures; the design intensity is taken from official local rainfall data. Entering culverts, closed drains, infiltration wells, or pump pits requires a confined space permit, and connecting portable pumps to a fixed panel is work for an authorized electrical technician.
That afternoon, heavy rain fell for about an hour over a 220-room hotel. Within twenty minutes, water in the drop-off area in front of the lobby rose to ankle height, the drain along the parking lot overflowed, and water began running down the ramp into the basement parking. In the basement pump pit, the first pump ran, but the second pump did not start even though the high-level alarm was sounding. The city drain in front of the hotel stayed full long after the rain stopped. The technician needs to know whether the hotel drains are too small or only blocked, how much storage is needed, how long the pumps take to drain the basement, and what must not be done while the water is still standing.
Scope
This chapter covers rainwater at the scale of a hotel site, that is, roofs, roads, parking, gardens, and basements. It is based on the report of the Environment Agency of England on runoff, the stormwater practice sheets and flood resilience guide of the United States EPA, the flood guidance of the UK government, and the CDC recommendations; their figures are figures of their countries of origin. In Indonesia, rainwater management on buildings and their lots is regulated by, among others, Minister of Public Works Regulation No. 11/PRT/M/2014, and rainwater use by State Minister of the Environment Regulation No. 12 of 2009; as of November 2026, their content and status could not be confirmed from open documents, so check the JDIH (legal documentation network) of the Ministry of Public Works and Housing, the JDIH of the environment ministry, and the local agency. The design rainfall intensity is taken from official local rainfall data, not from the figures in this chapter.
The Manning formula, drain capacity, and roof rainwater flow with the rational method are covered in Chapter 10 · Buildings & Facilities on drainage hydraulics, gutters in Chapter 35 · Buildings & Facilities on roofs and waterproofing, submersible pumps, floats, and check valves in Chapter 39 on building sewage pumps and sumps, and entering drains and pits in Chapter 11 · Safety on confined spaces. Generators for pumps are covered in Chapter 36 · Electrical & Control, electricity in wet locations in Chapter 37 · Electrical & Control, lift emergency response during floods in Chapter 25 · Buildings & Facilities, and basement parking ventilation in Chapter 42 · Buildings & Facilities.
Work outside the building technician’s authority: entering culverts, closed drains, inspection chambers, infiltration wells, or pump pits; redesigning or enlarging drains and detention ponds; changing the discharge point to the city drain or a river; connecting portable pumps or generators to a fixed panel; and assessing retaining walls, slopes, or flooded structures. That work belongs to a permitted confined space team, a drainage consultant, the local agency, an authorized electrical technician, and a structural engineer. The building technician inspects from the surface, cleans reachable inlets and screens, tests pumps and alarms, calculates, records, puts up temporary barriers, and reports.
Rainfall intensity, duration, and return period
Rainfall intensity is the depth of rain falling per unit of time, usually in mm/h. Rain of 1 mm over 1 m² equals 1 L of water, so rainfall depth converts directly into volume. Intensity is always tied to duration: very heavy rain is usually short, and the average intensity of longer rain is lower even though its total depth is greater.
Return period is the reciprocal of the average annual probability that an event is exceeded. Rain with a 10-year return period has a probability of 1/10 of being exceeded every year; it does not happen exactly once every ten years. The probability of being exceeded at least once in years is
where is the return period (years) and the period considered (years). This formula assumes that the years are independent and that the climate does not change.
The assumption of a fixed climate is being abandoned. The 2013 report of the Environment Agency of England gives a factor of 1.2 for rainfall intensity for buildings with a design life extending to 2080 or beyond, following a 2011 English guidance document; that is an English figure, and the guidance in force there now may differ.
Runoff and the rational method on a site
Runoff is rainwater that flows over the surface toward a drain, pipe, or water body. The runoff coefficient is the proportion of total rainfall that becomes runoff volume after subtracting depression storage, infiltration, and interception.
The rational method is a simple method used in many countries to calculate the peak discharge in a drainage system, mainly for pipe sizing. For a site with mixed surfaces:
where is the peak discharge (L/s), the design rainfall intensity (mm/h), and the runoff coefficient and area (m²) of surface part , and the composite coefficient of the site. The divisor 3,600 converts L/h into L/s. The intensity used is the intensity for a duration equal to the time of concentration, which is the time water takes to travel from the most distant point of the site to the point being considered. The method gives only one peak value, assumes rain is uniform over the whole site, and suits small sites; storage volume is calculated another way.
In England, the same report states that stormwater pipe networks are often sized initially with the rational method and a constant intensity of 35 mm/h, and historically 50 mm/h, which is more conservative. The English water industry guidance it cites assumes 100 percent runoff from impervious surfaces and 0 percent from pervious surfaces; that assumption is described as fairly safe for pipe design but less appropriate for long extreme rainfall. Both figures illustrate a way of thinking, not values for a hotel in Indonesia.
Drains, inlets, and culverts
Water from the surface enters the drain through an inlet, which is an opening or grate at the edge of a road, a parking deck, or the bottom of a depression. Open channels and pipes carry the water to a culvert, which is a short closed channel under a road or building, and then to the discharge point, usually the city drain. The capacity of each part is calculated with the Manning formula in Chapter 10 · Buildings & Facilities. For the technician, the design capacity applies only when the cross section is clean.
Drains on a hotel site generally fail for four reasons: inlet grates covered with leaves, plastic, or sand so that water flows over the grate even though the pipe is empty; sediment that reduces the cross-sectional area; a full city drain so that water is held back or flows back into the hotel drain; or a capacity that is genuinely too small for the design intensity (Example 2).
The EPA flood resilience guide for pump stations recommends gates and backflow prevention devices on the inlet and overflow lines so that the station is not flooded from the drain side. At a hotel, a flap valve, which is a one-way gate at the end of the discharge pipe, keeps city drain water out of the hotel drain. A flap valve stuck open by trash or stuck shut by corrosion causes flooding either way, so it is checked from the surface before the rainy season.
Culverts, closed drains, and inspection chambers are confined spaces. Inspection is done from outside with a flashlight, mirror, pole camera, or measuring rod; entry is only with a confined space entry permit (Chapter 11 · Safety). A blockage that cannot be reached from outside is handed over to a drain cleaning contractor.
Infiltration wells and infiltration trenches
An infiltration well is a vertical pit that holds rainwater and lets it soak into the ground through its bottom and walls. An infiltration trench is a gravel-filled trench that lets rainwater soak into the ground, often fitted with an overflow, an underdrain, and a settling basin in front of it so that it does not clog quickly. In the United States, infiltration wells deeper than they are wide are classed as Class V injection wells and regulated, because rainwater can carry oil, sediment, metals, and microbes into groundwater.
The EPA practice sheet for infiltration trenches gives site conditions that are useful for comparison:
| Condition | Value in the EPA sheet |
|---|---|
| Soil infiltration rate | 0.5 to 3 inches per hour, that is 12.7 to 76.2 mm/h |
| Clay content | no more than 20 percent, and silt plus clay less than 40 percent |
| Distance from trench bottom to seasonal high groundwater table | at least 4 feet (1.2 m), as low as 2 feet (0.6 m) near large water bodies; follow local standards |
| Drawdown time | treated volume infiltrates within 48 hours, ideally 24 hours |
| Karst areas | not used, because of sinkhole and groundwater contamination hazards |
Drawdown time matters because a well that is still full when the next rain comes holds nothing. If water infiltrates only through the bottom, the drawdown time of the well is
where is the drawdown time (h), the water depth in the well (m), and the soil infiltration rate (m/h). This formula does not depend on diameter. The well walls add infiltration, so the result tends to be too long, but silted walls may infiltrate nothing at all. The infiltration rate is measured in the field by a soil specialist; general soil data are only for a preliminary estimate.
Water from a stormwater hot spot, which is a surface whose rainwater is far more polluted, for example fueling stations, workshops, and waste storage areas, is not sent to an infiltration trench before it is treated. At a hotel, kitchen loading docks and wet waste areas belong here. The maintenance EPA recommends includes clearing inlets of trash, sediment, and oil every month and inspecting the settling basin twice a year, and replacing the gravel when clogged; an observation well, a perforated pipe down to the trench bottom, lets staff measure the drawdown rate from the surface.
Detention ponds and storage volume
A detention pond is a pond or tank that holds runoff temporarily and then releases it slowly to the downstream drain, so the peak flow leaving is smaller than the peak flow entering. A dry detention pond holds water for a certain minimum time, for example 24 hours, so that particles and pollutants settle; the EPA sheet states that the treated volume is held for between 12 and 48 hours, and that the settling forebay in front of the pond is about 10 percent of the treated volume.
A preliminary estimate of the storage volume for one rain of depth and duration :
where is the storage volume (m³), the rainfall depth (mm), the allowed outflow or the flow the downstream drain can accept (L/s), and the rain duration (s). This formula assumes that the outlet runs full throughout the rain, whereas early in the rain its flow is still small, so the result tends to be too low. The actual design uses hydrographs and is prepared by a drainage consultant.
An open pond holding water is a drowning hazard, especially for guests’ children. Fencing, signs, gentle edge slopes, and no entry during rain are part of the pond itself. A closed underground storage tank is a confined space (Chapter 11 · Safety).
Flood pumps and pump pits
Basement parking, underground plant rooms, and ramp bottoms that lie below the city drain depend on a flood pump, which is a pump that lifts rainwater from the pump pit to the drain above. The arrangement of pit, submersible pump, float, alarm, and check valve is the same as the sewage sump in Chapter 39. The difference lies in the flow: runoff from an open ramp can exceed the pump capacity.
The time to drain standing water is calculated with
where is the drain-down time (s), the standing water volume (L), the total flow of the pumps running (L/s), and the flow of water still coming in (L/s). If , the water does not go down at all. The pump flow is taken from the pump curve at the actual head, not from the nameplate (Chapter 9 · Buildings & Facilities).
The EPA flood resilience guide for pump stations gives several measures that also apply to building flood pumps:
- providing temporary barriers, for example sandbags, for minor floods;
- waterproofing or raising motor controls, variable frequency drives, computers, and electrical panels to a higher level;
- de-energizing electrical systems before the flood arrives to reduce damage;
- storing spare or temporary pumps outside the flood zone, and keeping a list of pump suppliers for emergencies.
For power supply, the same guide recommends that generators be placed above the flood level, have automatic controls, and be sized appropriately, with fuel tanks that are also raised and secured so they do not float. Backup controls that need no electricity, such as float switches, are recommended where possible. Generators and transfer switches are covered in Chapter 36 · Electrical & Control; a portable generator is never run inside a basement or an enclosed room.
Rainy-season preparation
Preparation starts a few weeks before the rainy season and is repeated after every heavy rain:
- Inlet grates, roof strainers, gutters, and open channels are cleaned; sediment in reachable drains is removed.
- Flap valves at the discharge points are checked from the surface for free movement.
- Infiltration wells and trenches are checked for drawdown rate through the observation well after rain.
- Flood pumps are tested by filling the pit until the float operates, the high-level alarm is tested, and the standby pump is confirmed to alternate.
- Generator fuel is topped up and a load test is carried out according to Chapter 36 · Electrical & Control.
- Sandbags or door barriers are prepared near the lobby, the basement ramp, and plant rooms.
- A contact list is drawn up: fire service, local agency, pump supplier, drain cleaning contractor, and electrical technician.
The UK government recommends a personal flood plan, a group plan for those responsible for organizations such as schools, hospitals, and care homes, and a business flood plan, kept together with essential items. At a hotel, the plan names who decides to close the basement ramp, when guest vehicles are moved to high ground, who switches off equipment in rooms about to flood, and how guests are informed. The UK health agency notes that flood alerts in England are generally issued 2 hours to 2 days in advance, and flood warnings half an hour to one day in advance; such short notice is only enough if the plan has already been prepared.
Responding to standing water
The UK government advises people not to walk, cycle, or drive through flood water, because flood water may contain sewage and hide rubbish, wreckage, uneven roads, and broken drain and manhole covers. Gas, electricity, and water are turned off if it is safe, and electrical switches are not touched while standing in water; people do not put themselves at risk to move vehicles or belongings. CDC adds that flood water may contain downed power lines, human and animal waste, and chemical waste, and that swiftly moving shallow water can be deadly.
On the hotel site, the technician’s steps while water is still standing:
- Close access to flooded areas with barricades, especially the basement ramp, detention ponds, and open channels that cannot be seen under the water.
- Keep people away from manhole covers that are lifted or missing, and mark their location.
- Monitor the water level in the pump pit and the alarm from a dry place.
- Report to the emergency coordinator if the water approaches electrical panels, the transformer room, the generator room, or the lift machine room.
If a person really has to enter the water, CDC recommends rubber boots, rubber gloves, and goggles, and washing skin that has touched flood water with soap and clean water. A submerged vehicle battery may still carry an electrical charge.
After the water recedes, the UK government advises that water, gas, and electricity are not turned back on until checked by the utility company or a qualified engineer. In England, pumping water out of a property into a river, public sewer, or street drain may need a permit from the relevant authority; in Indonesia, the pump discharge point is checked with the local drain operator. Depth, duration, extent, water entry points, and submerged equipment are recorded for the reassessment of the drains.
Worked example
The figures in the examples below are practice figures, unless their origin is stated.
Example 1: composite runoff coefficient. A 12,000 m² hotel site consists of roofs 4,000 m² (), asphalt roads and parking 3,500 m² (), paving blocks 1,500 m² (), and gardens 3,000 m² (). The sum m², so . If 1,000 m² of garden is replaced by asphalt, rises by m², and the peak discharge rises by percent.
Example 2: peak discharge and drain capacity. With a design intensity of 120 mm/h for a duration equal to the site time of concentration, the peak discharge is L/s. If the capacity of the main drain to the city drain by Manning calculation (Chapter 10 · Buildings & Facilities) is 200 L/s, the shortfall is L/s, which is percent of the peak discharge. Cleaning the inlets alone does not remove this flooding; the finding is reported to the drainage consultant.
Example 3: detention tank volume. Rain of 80 mm falls in 60 minutes, and during heavy rain the city drain accepts only 60 L/s from the hotel. The runoff volume is m³, and the volume that can leave is m³. The storage needed is m³. A 20 m by 12 m storage tank with an effective depth of 2 m has a volume of m³, enough with 20 m³ to spare. After the rain stops, the tank empties in seconds, about 2.1 hours, if the city drain can already accept 60 L/s.
Example 4: infiltration well and drawdown time. A 150 m² service building roof () receives 40 mm of rain, so the runoff volume is m³. One well with a diameter of 1.0 m and an effective water depth of 2.0 m holds m³, so , that is 4 wells, are needed. At the lowest infiltration rate in the EPA sheet, 12.7 mm/h, the drawdown time is hours, far above 48 hours. At the highest rate, 76.2 mm/h, hours. The field-tested infiltration rate decides whether wells are suitable or the soil needs a wider trench.
Example 5: draining the basement parking. Water 0.12 m deep floods 800 m² of basement parking, that is m³ or 96,000 L. Two pumps of 12 L/s each are running, and water from the ramp is still coming in at 5 L/s. The drain-down time is seconds, about 84 minutes. With one pump, seconds, about 3.8 hours. If water from the ramp rises to 15 L/s and only one pump runs, and the water level keeps rising at L/s, that is m³ per hour. That is why the second pump is tested before the rainy season.
Example 6: return period and climate factor. The probability that rain with a 10-year return period is exceeded at least once in 5 years is , that is 41 percent. For a 50-year return period over 25 years, , that is 40 percent. If the intensity of Example 2 is multiplied by the English factor of 1.2, L/s, and the drain shortfall becomes L/s.
Stop conditions
- Inspection or cleaning would require entering a culvert, closed drain, inspection chamber, manhole, infiltration well, storage tank, or pump pit: stop until a confined space entry permit has been issued, the air tested, and the attendant and rescue plan are ready (Chapter 11 · Safety).
- Water is standing near or approaching electrical panels, socket outlets, pump motors, the transformer room, or a generator, or there is a cable in the water: do not enter the water and do not touch switches; ask the designated person to disconnect the supply from a dry place, and hand over to an authorized electrical technician (Chapter 37 · Electrical & Control).
- Water is flowing fast across roads, parking, the ramp, or open channels, or manhole covers are lifted or missing: no one crosses; put up barricades and wait for the water to recede.
- Water in the basement parking or plant room keeps rising even though the pumps are running: get people out of the basement, report to the emergency coordinator, and follow the lift procedure for floods (Chapter 25 · Buildings & Facilities); vehicles are not moved once water has entered.
- A portable pump would have to be connected to a fixed panel, or a portable generator is about to be run in the basement or an enclosed room: stop; the connection is made by an authorized electrical technician, and the generator is placed outside enclosed rooms (Chapter 36 · Electrical & Control).
- Pumped water is about to be discharged into the city drain, a river, or a neighbor’s land outside the approved discharge point, or the discharge point is about to be changed: postpone until approved by the building management and the local drain operator.
- Ground subsidence, a landslide, or a cracked or seeping retaining wall or detention pond edge: keep people away and hand over to a structural or geotechnical engineer.
- Standing water is mixed with sewage from the wastewater drain, smells of fuel, or carries an oil film: keep people away, wear protection if approaching is necessary, and report (Chapter 39 on building sewage pumps and sumps).
Common misinterpretations
Guess what’s wrong first, then open the explanation.
Common misconception
A 50-year rain comes only once in 50 years.
Why is it wrong?
A 50-year return period means a 2 percent probability every year. Over 25 years, the probability of being exceeded at least once is about 40 percent (Example 6).
Common misconception
A drain that is dry in the dry season must be big enough.
Why is it wrong?
Capacity is tested at the peak discharge of the design rain, not at everyday flow. Blocked inlets and a full city drain also make an adequate drain look too small.
Common misconception
The more infiltration wells the better, in any soil.
Why is it wrong?
Wells in slowly draining soil are still full when the next rain comes, and water from hot spots or soil with shallow groundwater can contaminate groundwater.
Common misconception
One big pump is enough for the basement.
Why is it wrong?
Pumps can fail, power can go out, and inflow can exceed one pump. Standby pumps, alarms, and backup power that does not flood with them are part of the capacity.
Common misconception
Ankle-deep standing water is safe to walk through.
Why is it wrong?
Flood water can hide uncovered manholes, power cables, and sewage, and according to CDC swiftly moving shallow water can be deadly.
Links to other chapters
Chapter 10 · Buildings & Facilities on drainage hydraulics gives the drain capacity that is compared with the peak discharge in this chapter, and Chapter 35 · Buildings & Facilities covers the gutters that form the roof part of site runoff. The pump pit follows Chapter 39, pump curves Chapter 9 · Buildings & Facilities, entering drains Chapter 11 · Safety, backup power Chapter 36 · Electrical & Control, and electricity in wet areas Chapter 37 · Electrical & Control.
Exercises and worked solutions
The figures in the exercises are for practice.
Try to answer first, then open the worked solution.
Asphalt parking of 2,000 m² () and a garden of 1,000 m² () drain to one inlet. Calculate the composite coefficient and the peak discharge at 100 mm/h.
Check my answer
See the worked solution
The sum m², so . The peak discharge is L/s, which is compared with the capacity of the inlet and its pipe.
The drain in front of the lobby overflows even though the calculation shows its capacity is sufficient. What is checked first?
Check my answer
See the worked solution
The first checks are inlet grates covered with leaves or trash, sediment on the bottom of the drain and culvert, and the water level of the city drain at the discharge point and its flap valve. The capacity calculation applies only to a clean cross section and a free discharge point, so these three things can make an adequate drain overflow.
An infiltration well with an effective water depth of 1.5 m is in soil with an infiltration rate of 20 mm/h. What is its drawdown time, and what is the conclusion?
Check my answer
See the worked solution
Its drawdown time is hours, above the 48 hours in the EPA sheet. The well is likely to still hold water when the next rain comes, so it needs a larger infiltration area, for example a trench, or another approach assessed by a consultant.
A site with m² receives 60 mm of rain in one hour, and the downstream drain accepts 40 L/s. What is the estimated storage volume?
Check my answer
See the worked solution
The runoff volume is m³ and the outflow volume is m³, so the storage is about m³. This is a preliminary estimate that tends to be low, because the outlet is not yet running full early in the rain.
A pump pit holds 30 m³ of standing water. An 8 L/s pump runs and water is still coming in at 3 L/s. How long does it take to drain?
Check my answer
See the worked solution
The drain-down time is seconds, that is 100 minutes. If inflow rises to 8 L/s or more, the water does not go down, so the standby pump is made ready.
What is the probability that rain with a 25-year return period is exceeded in any one year, and at least once in 10 years?
Check my answer
See the worked solution
The probability in one year is , that is 4 percent. Over 10 years, , about 34 percent, because the yearly chances add up even though they are independent.
References
External sources
- Rainfall runoff management for developments, Report SC030219assets.publishing.service.gov.uk
- Stormwater Best Management Practice: Dry Detention Pondsepa.gov
- Flood Resilience: A Basic Guide for Water and Wastewater Utilitiesepa.gov
- Stormwater Best Management Practice: Infiltration Trenchepa.gov
- Stormwater Drainage Wellsepa.gov
- What to do before or during a floodgov.uk
- How to respond to floodinggov.uk
- Safety Guidelines: Floodwatercdc.gov
- What to do after a floodgov.uk
- Prepare for floodinggov.uk
Revision history
| Date | Version | Change |
|---|---|---|
| November 15, 2026 | 1 | First published |
How to cite
Kurnia (2026). Rainwater and flooding on a hotel site: rainfall intensity and runoff, drains and culverts, infiltration wells and detention ponds, flood pumps, rainy-season preparation, and responding to standing water. ARSTEMA Academy. Revised November 15, 2026. arstema.com/en/academy/konsep/air-hujan-dan-banjir-di-kawasan-hotel-intensitas-hujan-dan-limpasan-saluran-dan-gorong-gorong-sumur-resapan-dan-kolam-tampung-pompa-banjir-persiapan-musim-hujan-serta-tanggap-genangan
Self-check · 3 questions
Check your understanding before moving on
Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.
Asphalt parking of 2,000 m² () and a garden of 1,000 m² () drain to one inlet. Calculate the composite coefficient and the peak discharge at 100 mm/h.
The drain in front of the lobby overflows even though the calculation shows its capacity is sufficient. What is checked first?
An infiltration well with an effective water depth of 1.5 m is in soil with an infiltration rate of 20 mm/h. What is its drawdown time, and what is the conclusion?