Skip to content

Search ARSTEMA

Type a chapter, term, symptom, or tool.

    Buildings & Facilities · Chapter 51Applied

    By Kurnia · Published November 15, 2026 · Version 1 · 20 min read

    Building clean water tanks

    underground tanks and rooftop tanks, float valves and overflow pipes, entry gaps for dirt and animals, draining and disinfection, water quality testing, and the inspection schedule

    Several guests on the upper floors of a business hotel complain that the bathroom water smells and looks slightly cloudy; the technician finds a cracked rooftop tank lid, an overflow pipe without a screen, bird droppings on the lid, and an underground tank whose wall adjoins the kitchen grease trap. This chapter covers building clean water tanks from the technician’s side: the roles of the underground tank and the rooftop tank, water residence time, float valves, overflow pipes and warning pipes, entry gaps for dirt, insects, birds, and rats, water temperature, draining and disinfection according to UK HSE guidance, water quality testing according to the annex of Permenkes 2/2023, and the inspection schedule and records. Entering a tank is confined space work and is mentioned only as a limit; cleaning inside the tank, disinfection, sampling, and water quality decisions belong to licensed contractors, laboratories, management, and the health office.

    Section you’re reading: Chapter opening

    In the dry season, several guests on the seventh and eighth floors of a business hotel in Semarang complain that the bathroom water smells musty and looks slightly cloudy. The duty technician goes up to the roof and finds the rooftop tank lid cracked at one corner, bird droppings on the lid and around its vent, and the end of the overflow pipe open without a screen. In the basement pump room, the underground tank shares a wall with the kitchen grease trap, and the floor near its inspection opening is wet. The rooftop tank was last drained two years ago, with no water quality test records since. The technician needs to establish where the dirt gets in, how long the water stands in the tanks, and who is authorized to drain, disinfect, and take samples.

    Scope

    This chapter covers building clean water tanks, that is, the underground tanks and rooftop tanks of hotels, hospitals, laundries, and similar buildings, from the building technician’s side: the role of the tanks and water residence time, float valves and overflow pipes, entry gaps for dirt and animals, water temperature, draining and disinfection, water quality testing, and the inspection schedule and records. The annex of Permenkes 2/2023 (Minister of Health Regulation) sets environmental health quality standards for drinking water. As of November 2026, JDIH Kemenkes lists Permenkes 2/2023 as no longer in force because it was revoked by Permenkes 3/2026, while Article 99 of Permenkes 3/2026 excludes several of its articles together with the annex from the revocation; check the latest status and its application to your building with the district or city health office. Tank maintenance guidance comes from the UK HSE, WHO, and the United States EPA, and its figures are the figures of those bodies and countries.

    The water supply system is in Chapter 5 on building clean water supply systems, pumps and pressure in Chapter 9 on building water pressure and pumps, valves in Chapter 12 on valves and water control, and the chlorine dose for pipe disinfection in Chapter 14 on testing and commissioning of plumbing installations. Legionella in hot water is in Chapter 13 on building hot water, groundwater in Chapter 27 · Water & Water Treatment on groundwater and boreholes, water microbes and sampling in Chapter 6 · Biology & Microbiology on water microbes and their testing, and biofilm in Chapter 5 · Biology & Microbiology on biofilm in pipes, tanks, and machines. Tank capacity and the connection to the city network are governed by SNI 8153:2015 on plumbing systems, local regulations, and the water supplier.

    Work outside the building technician’s authority: entering a tank for any reason, including cleaning, inspecting the inside, or retrieving a dropped object, because this is confined space work that requires an entry permit, atmospheric testing, an attendant, and a rescue plan as in Chapter 11 · Safety on confined spaces; cleaning and disinfecting the tank; mixing or pouring chemicals into the tank; repairing the tank walls, supports, and structure; taking official samples; and deciding that the water is fit for use again. This work belongs to licensed tank cleaning contractors, plumbing contractors, structural engineers, laboratories, management, and the health office. The building technician inspects from outside, records temperatures and readings, measures chlorine and turbidity if trained, closes simple gaps from outside, isolates the flow according to procedure, and reports.

    Underground tanks, rooftop tanks, and water residence time

    Underground tank is a tank below or at ground level that receives water from the city network or a well and serves as the building reserve. Rooftop tank is a tank at the highest point of the building that is filled by pump from the lower tank and delivers water by gravity to the floors below it, as in Chapter 5. In both tanks the water stops flowing for a while: dirt settles, residual chlorine decays, and the water temperature follows the surroundings.

    WHO notes that the integrity of tanks must be maintained, and that in hot climates the water temperature, particularly in under-roof tanks, can rise and support the growth of environmental opportunistic pathogens. HSE asks that the volume of stored cold water be minimized and normally not exceed one day’s water use, with inlet and outlet pipes on opposite sides of the tank and at different heights so the water moves. The one-day figure is UK guidance; the capacity of building tanks in Indonesia is still set by the designer.

    The average residence time of water in a tank is estimated with

    tres=VQt_{res} = \frac{V}{Q}

    where trest_{res} is the residence time (hours or days), VV the volume of water normally held in the tank (m³), and QQ the average use flow leaving the tank (m³/h or m³/day). The formula assumes the water is evenly mixed. If the inlet and outlet pipes are close together, part of the water short-circuits and another part stands much longer than trest_{res} (Example 1). HSE also asks that daily water use be recorded whenever the building’s use pattern changes, to confirm the water is not stagnating in the tank. Floors closed for renovation are such a change.

    Float valves, overflow pipes, and warning pipes

    Float valve is a valve on the inlet pipe that closes when its float is lifted by the water level. On a pump-filled tank, a level switch also starts and stops the fill pump, as in Chapter 9. If the float valve sticks open, water keeps coming in and leaves through the overflow pipe.

    Overflow pipe is a pipe near the rim of the tank that discharges water when the level rises above the working limit. Chapter 5 asks that the overflow pipe discharge freely above a drain, so the overflow is visible and dirty water from the drain cannot rise back into the tank. The overflow pipe must be able to discharge the largest inflow, for example the fill pump flow when the float valve sticks open. Its capacity is estimated with

    Qoverflow=v AQ_{overflow} = v \, A

    where QoverflowQ_{overflow} is the flow that can be discharged (m³/s), vv the average water velocity in the overflow pipe (m/s), and AA the internal cross-sectional area of the pipe (m²). The achievable velocity depends on the water height above the pipe mouth and the pressure loss along the pipe, so the design value of vv is taken from the designer; technicians use the formula to check the order of magnitude (Example 2). A blocked screen or a submerged pipe end reduces QoverflowQ_{overflow}.

    Warning pipe is a small pipe whose end is deliberately placed where it can be seen, so that water dripping from it signals that the float valve is not closing. HSE includes the overflow pipe, the warning pipe, and the vents in the annual tank inspection. A pipe that keeps dripping is a water loss that can be calculated (Example 3) and usually shows up on the water meter, as in Chapter 40 · Water & Water Treatment on water meters and the building water balance.

    Entry gaps for dirt, insects, birds, and rats

    HSE asks that cold water storage tanks have secure, tightly fitting lids to keep dirt and microbial nutrients out, and that every pipe open to the atmosphere, such as the overflow pipe and the vent, be fitted with an insect and vermin screen installed so it does not hold water. WHO writes that unprotected tanks are at risk of fecal contamination from birds and vermin.

    A United States EPA paper on finished water storage tanks records that microbial contamination from birds and insects is a major water quality problem in tanks, and that most sanitary defects stem from roof hatches and vents that do not provide a watertight seal. The problems tank inspectors report most often are vents and overflows without bug screens and unlocked access hatches. The Salmonella outbreak in Gideon, Missouri, in December 1993 came from pigeon droppings on the tank roof that were carried by wind and rain through a gap in the hatch frame.

    Underground tanks have other entry routes. Chapter 5 asks that groundwater and rainwater be kept out of the tank. WHO describes an outbreak in a multipurpose building in Kanagawa Prefecture, Japan: the basement drinking water tank shared a perforated concrete wall with a night-soil tank and a wastewater tank. When the wastewater pump broke down, contaminated water got in; 461 of the 736 people investigated reported illness, and Cryptosporidium parvum was found in stool, tap water, and the tank.

    For the technician, these entry gaps are inspected from outside: the lid, the screens, pipe connections that pass through the tank wall or lid, seepage or waste pipes touching the underground tank, and nests or animal traces. Pest control around the tank is covered in Chapter 12 · Biology & Microbiology on pests in kitchens, laundries, and buildings.

    Water temperature and standing water

    HSE writes that incoming water temperature in the UK should be well below 20 °C for most of the year, and asks that the tank water temperature remote from the float valve and the incoming water temperature be measured and recorded every year in summer. That guidance was written for the UK and cannot simply be transferred to buildings in the tropics. What the technician can do is measure and record the tank water and incoming water temperatures at the same time of day, keep the rooftop tank shielded from direct sun, and make sure the water does not stand for long.

    Water that stands for long in a warm tank loses its residual chlorine and gives microbes time to grow in the sediment and on the walls as biofilm, as in Chapter 5 · Biology & Microbiology. HSE gives examples of tank conditions found at inspection, including moderate fouling suggesting cleaning should be done within the next 12 months, heavy debris and internal corrosion, and failed glass reinforced plastic coating with dark spots of biological fouling; severe stagnation could indicate that the tank is oversized or not being used.

    Draining and disinfection

    Draining a tank is emptying its contents to the designated drain to remove sediment and prepare for cleaning. Disinfection of a tank is applying a disinfectant at a set concentration and contact time to kill the microbes that remain after cleaning. HSE asks for cleaning and disinfection of the water system, among other occasions, when routine tank inspection finds significant contamination or stagnation, when the system has been substantially altered or entered for maintenance, when sampling results show microbial contamination, and during or after an outbreak or suspected outbreak of legionellosis.

    Before cleaning and disinfection start, HSE asks for a safe system of work or a site-specific method statement based on a risk assessment of hazards such as confined spaces, work at height, electricity, chemicals, and waste disposal, together with evidence of the workers’ competence. A storage tank is an easily recognized example of a confined space. Inside a rusting steel tank oxygen can be depleted, gas can enter from connected pipes, and the people killed in confined spaces include those who try to rescue others without proper training and equipment. For that reason this chapter contains no steps for entering a tank (Stop condition 1).

    HSE guidance states that disinfection of a water system is normally based on chlorine dosed at 50 ppm for a minimum contact period of one hour, and at the end of the contact period the free chlorine concentration should not be less than 30 ppm; lower concentrations with longer contact times are also acceptable under the British standard BS 8558. The HSE example procedure asks that pH values above 7.6 be avoided because chlorine efficacy depends on pH, that the concentration be tested with a quantitative test kit and rechecked during the contact period, that the process be restarted if the concentration falls below the minimum, that the solution be neutralized before discharge and flushing, and that warning signs be fitted at outlets during the process. Microbiological samples to confirm the result are taken two to seven days after the system is refilled, because samples taken immediately after disinfection may give false negative results.

    The technician uses these concentrations to read the contractor’s records, not to mix chemicals personally (Example 5); chlorine mass, neutralization, and discharge are covered in Chapter 14. While the tank is empty, the technician arranges valve isolation according to procedure, as in Chapter 4 · Safety on non-electrical energy isolation.

    Water quality testing

    The annex of Permenkes 2/2023 sets the mandatory parameters for drinking water, including Escherichia coli and total coliform 0 CFU/100 ml, turbidity less than 3 NTU, color 10 TCU, no odor, pH 6.5 to 8.5, and residual chlorine 0.2 to 0.5 mg/L with a contact time of 30 minutes. Drinking water in that annex covers water for drinking, cooking, washing eating utensils, bathing, and washing food ingredients, so hotel bathroom water is included.

    The same annex describes internal monitoring by drinking water providers: daily operational monitoring in the form of observation and testing of turbidity, pH, and chlorine residual, and periodic testing at least once a month for physical and microbiological parameters and once every six months for chemical parameters, with results reported to the health office every six months. Whether a hotel that treats or stores its own water counts as a provider bound by that schedule should be asked of the district or city health office. Official testing is done by an accredited laboratory or one designated by the local government.

    The technician’s daily readings are residual chlorine, turbidity, and temperature at the faucets nearest to and farthest from the rooftop tank. Residual chlorine that drops on the far floors indicates that the water stands too long or that there is chlorine demand in the tank and pipes (Example 4). How to take microbiological samples and read the results is in Chapter 6 · Biology & Microbiology. The technician does not pour calcium hypochlorite into the tank to raise the residual chlorine; changing the dose belongs to the water treatment provider or the contractor.

    Inspection schedule and records

    HSE asks for an annual inspection of cold water storage tanks covering the condition inside and outside and the water in them: the lid closely fitted and in good condition, the screens on the overflow pipe, warning pipe, and vents intact, the insulation in good condition, and the water surface clean with no visible contamination; if debris or traces of vermin are found, the inspection is done more often.

    The EPA paper summarizes practice for city water tanks in the United States: routine exterior inspections daily to weekly, periodic inspections every 1 to 4 months, comprehensive inspections with the tank drained every 3 to 5 years, and most tank cleaning programs using an interval of 2 to 5 years. Those figures are for large utility tanks. The annex of Permenkes 2/2023 asks that containers used to store water be cleaned at least once a week; whether that container provision applies to building tanks should be asked of the health office.

    The schedule below is compiled from the guidance above for hotel tanks; stricter intervals from local rules take precedence.

    IntervalOutside inspection and readings
    Dailyresidual chlorine, turbidity, and temperature at the nearest and farthest outlets; water odor and color; warning pipe not dripping; fill pump not cycling too often
    Weeklylid locked and intact; screens on the overflow pipe, warning pipe, and vents intact and dry; no puddles, seepage, or nests around the tank
    Monthlymeter records and daily use; rooftop tank supports and pipe supports; laboratory testing if required
    Annuallyfull tank inspection according to HSE, including tank water and incoming water temperatures in the hot season; decision on cleaning and disinfection
    After an eventcleaning, disinfection, and sampling two to seven days after refilling, if there was contamination, repair, or long standing water

    Records hold the date, inspector, readings, findings, photos, actions, and who received each action; the contractor’s disinfection records (initial and final concentration, contact time, sample results) are kept with them.

    Worked example

    The numbers in the examples below are practice numbers, unless their origin is stated.

    Example 1: residence time in the lower tank and the rooftop tank. The hotel’s underground tank normally holds 60 m³ and average use is 40 m³/day, so tres=60/40=1.5t_{res} = 60/40 = 1.5 days, longer than the HSE one-day guidance. A rooftop tank holding 12 m³ with daytime use of 3 m³/h gives tres=12/3=4t_{res} = 12/3 = 4 hours. When two floors are closed and use drops to 25 m³/day, the residence time of the lower tank rises to 60/25=2.460/25 = 2.4 days, so the finding is reported to the designer to lower the working water level temporarily.

    Example 2: whether the overflow pipe is large enough. The rooftop tank fill pump delivers 7.2 m³/h, that is 7.2/3,600=0.0027.2/3{,}600 = 0.002 m³/s. An overflow pipe with a 50 mm internal diameter has A=π×0.0252=0.00196A = \pi \times 0.025^2 = 0.00196 m². If the designer uses a velocity of 0.8 m/s, Qoverflow=0.8×0.00196=0.00157Q_{overflow} = 0.8 \times 0.00196 = 0.00157 m³/s, less than 0.002 m³/s, so when the float valve sticks open the water level can rise over the tank rim. A 65 mm pipe gives 0.8×π×0.03252=0.002650.8 \times \pi \times 0.0325^2 = 0.00265 m³/s, above the pump flow; the pipe change is handed to the plumbing contractor.

    Example 3: water lost through the warning pipe. The warning pipe drips 0.25 L/min because the float valve does not close tightly. The daily loss is 0.25×60×24=3600.25 \times 60 \times 24 = 360 L, and the yearly loss 360×365/1,000=131.4360 \times 365/1{,}000 = 131.4 m³. Besides the waste, this flow keeps the float valve slightly open, so a valve replacement is scheduled and the warning pipe is not plugged.

    Example 4: reading residual chlorine and laboratory results. The morning residual chlorine reading is 0.4 mg/L at the faucet nearest the rooftop tank and 0.1 mg/L on the farthest floor. The nearest reading is within the Permenkes range of 0.2 to 0.5 mg/L, while the farthest is below 0.2 mg/L, so there is a drop of 0.4−0.1=0.30.4 - 0.1 = 0.3 mg/L along the pipes and tank. The laboratory result for the same sample shows total coliform 4 CFU/100 ml and turbidity 3.8 NTU, exceeding the limits of 0 CFU/100 ml and less than 3 NTU, so the result is handed to management and the health office under Stop condition 3.

    Example 5: checking the contractor’s disinfection record. A 10 m³ rooftop tank is disinfected with a target of 50 ppm. The chlorine mass required is m=50×10=500m = 50 \times 10 = 500 g of available chlorine, as in the mass balance in Chapter 14. The contractor’s record shows an initial concentration of 52 ppm and 26 ppm after 60 minutes. Because 26 ppm is less than 30 ppm, the HSE procedure restarts the process; the drop of 52−26=2652 - 26 = 26 ppm, half the initial concentration, also shows that the tank was not yet clean of the dirt that consumes chlorine.

    Example 6: setting the sampling dates after cleaning. The rooftop tank was cleaned, disinfected, flushed, and refilled on Monday, March 2. Under HSE guidance the microbiological sample is taken two to seven days after refilling, that is between Wednesday, March 4, and Monday, March 9. If monthly monitoring also applies, a year has at least 1212 microbiological and physical tests and 12/6=212/6 = 2 chemical tests.

    Stop conditions

    1. The work requires a person’s body, head, or hands to enter the tank, for example to clean, to inspect the inside, or to retrieve a dropped object: do not enter and do not let anyone else enter without a confined space entry permit, atmospheric testing, an attendant, and a rescue plan; hand the work to a licensed tank cleaning contractor.
    2. A dead animal, bird or rat droppings inside the tank, wastewater or seepage entering the underground tank, or an open tank lid is found: stop using that water for drinking and food preparation, report to management, and hand cleaning, disinfection, and testing to the contractor and the laboratory; the water is not used again until test results meet the quality standard.
    3. Laboratory results show E. coli or total coliform above 0 CFU/100 ml, or the water smells, is colored, or is cloudy beyond the quality standard: do not pour calcium hypochlorite or any other chemical into the tank; report to management, the laboratory, and the health office for the decision on use and recovery.
    4. Two or more guests or staff have diarrhea, fever, or pneumonia suspected to be linked to the building water: do not drain, clean, or disinfect the tank before the health office decides on sampling; prepare the records and hand the decision to management and the health office.
    5. Disinfection or chemical mixing is requested without a method statement, training, a concentration test kit, and personal protective equipment: postpone and hand the work to the contractor or the water treatment provider.
    6. The rooftop tank support is cracked, tilted, or corroded, the tank wall bulges, or the tank body leaks: do not fill it completely; lower the water level if the procedure allows and hand the assessment to a structural engineer and the contractor.
    7. The rooftop tank inspection would have to be done at an unguarded roof edge, on a ladder, or on a slippery surface without fall protection: postpone until safe access is available according to Chapter 10 · Safety on work at height.
    8. Water keeps flowing from the overflow pipe, the water level rises over the tank rim, or water overflows near an electrical panel: have the designated person stop the fill pump from a panel outside the wet area and call the plumbing contractor; if there is water in the panel, hand it to an authorized electrician.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    Water from the city network is already chlorinated, so the tank does not need inspecting.

    Why is it wrong?

    Residual chlorine decays while the water stands in a warm tank, and dirt from gaps in the lid or vent gets in afterward.

    Common misconception

    A bigger tank is always safer.

    Why is it wrong?

    A large tank lengthens the residence time and adds stagnation. HSE asks that stored cold water normally not exceed one day’s use, and the capacity is still decided by the designer.

    Common misconception

    A dripping warning pipe can simply be plugged.

    Why is it wrong?

    The drip is a sign that the float valve is not closing. Plugging it removes the sign and does not stop the water coming in.

    Common misconception

    The screen on the overflow pipe blocks the overflow, so it is better removed.

    Why is it wrong?

    Without a screen, insects, birds, and rats get a way in. The screen stays in place, is chosen and positioned so it does not hold water, and is cleaned during routine inspection.

    Common misconception

    Adding calcium hypochlorite to the tank is a quick fix when test results are bad.

    Why is it wrong?

    Dosing without cleaning does not remove sediment and biofilm, can produce concentrations unsafe for users, and destroys evidence if there is a disease case. Disinfection follows a method statement and is verified by sampling.

    The tank is part of the water supply system in Chapter 5, and the fill pump and its level switch are covered in Chapter 9. Pipe disinfection after repairs and the chlorine mass balance are in Chapter 14, disinfectants and pH in Chapter 4 · Biology & Microbiology, and chlorination systems in Chapter 26 · Water & Water Treatment on chlorination systems. The daily use used to calculate residence time is read from meters as in Chapter 40 · Water & Water Treatment, and daily water demand is covered in Chapter 8 on water demand and pipe sizing.

    Exercises and worked solutions

    The numbers in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. A rooftop tank holds 18 m³ and night use is only 1.5 m³/h. What is the night residence time, and what should be watched?

      Check my answer
      See the worked solution

      The residence time is tres=18/1.5=12t_{res} = 18/1.5 = 12 hours, much longer than the daytime residence time. Water standing overnight in a warm rooftop tank loses residual chlorine, so the morning chlorine reading at the farthest faucet needs to be recorded and used to judge whether the designer should change the water level or the use pattern.

    2. The fill pump delivers 9 m³/h. The overflow pipe has a 50 mm internal diameter and the designer uses a velocity of 0.8 m/s. Is the pipe adequate?

      Check my answer
      See the worked solution

      The pump flow is 9/3,600=0.00259/3{,}600 = 0.0025 m³/s, while the capacity of the 50 mm pipe at 0.8 m/s is only 0.8×0.00196=0.001570.8 \times 0.00196 = 0.00157 m³/s. The pipe is not adequate when the float valve sticks open, so the finding is handed to the plumbing contractor to enlarge the pipe or add another.

    3. The technician finds the rooftop tank vent screen torn and a bird nest under its lid. What is done?

      Check my answer
      See the worked solution

      A torn screen and a bird nest are a way in for bird droppings, which WHO and EPA record as a source of tank contamination. The technician photographs and reports, the screen is replaced and the nest removed by an authorized person, and if droppings have already got in, the water is not used for drinking until the tank is cleaned, disinfected, and tested.

    4. The contractor reports an initial chlorine concentration of 50 ppm and 34 ppm after 60 minutes. What does the HSE procedure say?

      Check my answer
      See the worked solution

      A concentration of 34 ppm is not less than 30 ppm at the end of the one-hour contact time, so under the HSE procedure the disinfection meets the concentration requirement. The solution still has to be neutralized and flushed, and a sample taken two to seven days after refilling, before the water is declared safe.

    5. A sample is taken one day after the tank is disinfected and the result is negative. Why is that result not enough?

      Check my answer
      See the worked solution

      HSE writes that samples taken immediately after disinfection may give false negative results, because the remaining disinfectant temporarily suppresses microbes. The confirmation sample is taken two to seven days after the tank is refilled.

    6. Residual chlorine at a far-floor faucet is 0.15 mg/L and staff propose pouring calcium hypochlorite into the rooftop tank. What is the technician’s answer?

      Check my answer
      See the worked solution

      A reading of 0.15 mg/L is below the Permenkes range of 0.2 to 0.5 mg/L, but pouring calcium hypochlorite into the tank without a procedure can produce unsafe concentrations and does not solve the cause. The technician records the reading, checks the residence time and the tank condition, and reports to the water treatment provider or the contractor authorized to change the dose.

    References

    External sources

    • Legionnaires' disease: Technical guidance. Part 2: The control of legionella bacteria in hot and cold water systems (HSG274 Part 2)hse.gov.uk
    • Water safety in buildingsiris.who.int
    • Finished Water Storage Facilitiesepa.gov
    • Peraturan Menteri Kesehatan Nomor 2 Tahun 2023 tentang Peraturan Pelaksanaan Peraturan Pemerintah Nomor 66 Tahun 2014 tentang Kesehatan Lingkunganjdih.kemkes.go.id
    • Peraturan Menteri Kesehatan Nomor 3 Tahun 2026 tentang Penanggulangan Penyakitjdih.kemkes.go.id
    • Confined spaces: A brief guide to working safely (INDG258)hse.gov.uk

    Revision history

    DateVersionChange
    November 15, 20261First published

    How to cite

    Kurnia (2026). Building clean water tanks: underground tanks and rooftop tanks, float valves and overflow pipes, entry gaps for dirt and animals, draining and disinfection, water quality testing, and the inspection schedule. ARSTEMA Academy. Revised November 15, 2026. arstema.com/en/academy/konsep/tangki-air-bersih-gedung-tangki-bawah-tanah-dan-tangki-atap-pelampung-dan-pipa-luapan-celah-masuk-kotoran-dan-hewan-pengurasan-dan-disinfeksi-uji-mutu-air-serta-jadwal-pemeriksaan

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated
    1

    A rooftop tank holds 18 m³ and night use is only 1.5 m³/h. What is the night residence time, and what should be watched?

    2

    The fill pump delivers 9 m³/h. The overflow pipe has a 50 mm internal diameter and the designer uses a velocity of 0.8 m/s. Is the pipe adequate?

    3

    The technician finds the rooftop tank vent screen torn and a bird nest under its lid. What is done?

    Self-assessment progress0%

    Nearby chapters