On a Saturday night the split air conditioner in a hotel server room stops cooling because its condensate pump has jammed, the BMS temperature sensor on the wall near the ceiling still reads about 25 °C, and two hours later the reservation and key card systems go down because the air in front of the racks has reached 33 °C. This chapter covers server rooms from the building technician’s side: the server room as a dedicated technical space and the division of duties with the IT manager, temperature and humidity measured at the equipment air inlet with the recommended and allowable ranges, heat load, airflow, and precision cooling, power supply, UPS, generator set, and cooling during a power outage, very early warning smoke detection and water leaks, access and cleanliness, and monitoring, alarms, and records. It draws on the US Department of Energy guide for data centers, US military facility criteria, NIST physical security controls, and GSA facility standards. IT configuration, opening racks, shutting down servers, and work on distribution panels are stated as the authority of the IT manager and authorized electrical technicians.
At 21:40 on a Saturday night, the split air conditioner in the server room of a 220-room hotel stops cooling. Its condensate pump has jammed, the float switch has cut out the compressor, and the unit only blows air. There is no standby unit. The BMS temperature sensor is mounted on the wall near the ceiling, far from the racks, with an alarm limit of 30 °C, and for the first hour it still reads about 25 °C. At 23:50 the core switch shuts down from overheating, the reservation and key card systems become unreachable, and the front office opens rooms with a master key. The on-duty technician finds a handheld thermometer reading 33 °C in front of the racks, a pile of brochure boxes on the floor, and the door wedged open with a chair “to let air in.” The next morning the chief engineer asks: what should have been measured, where, against which limits, and who looks after what in that room.
Scope
This chapter covers server rooms in hotels, hospitals, and similar buildings from the building technician’s side: the room and its utilities, not the IT equipment inside the racks. The temperature and humidity ranges are taken from open documents of US agencies and are used as an engineering reference, not as Indonesian regulation; paid standards such as the ASHRAE thermal guidelines, TIA-569, NFPA 75, and NFPA 76 are only named.
UPS, batteries, and backup time are covered in Chapter 107 on UPS in buildings; racks, cables, and switches in Chapter 108 on hotel data networks; the BMS and its alarms in Chapter 32 · Buildings & Facilities on building management systems and Chapter 33 · Buildings & Facilities on alarms, trends, and schedules in the BMS; room air conditioners in Chapter 14 · Fluids & Thermal and air handling units in Chapter 16 · Fluids & Thermal; detectors in Chapter 20 · Buildings & Facilities and alarm panels in Chapter 19 · Buildings & Facilities; gaseous suppression systems in Chapter 49 · Buildings & Facilities on gaseous fire suppression systems in server rooms and panels.
Work outside the building technician’s authority: changing network and server configuration, opening locked racks, shutting down or restarting IT equipment, moving IT equipment power cables, working on live distribution panels or PDUs, opening the UPS, and changing detector or suppression settings. IT configuration and the decision to shut down equipment belong to the IT manager; electrical work belongs to authorized electrical technicians with a work permit according to Chapter 76 on safe work; the UPS belongs to the UPS vendor; detectors and suppression belong to the fire protection contractor. The building technician looks after the room, cooling, water, cleanliness, and the door, reads, records, and reports.
The server room as a dedicated technical space
A server room is an enclosed room containing server racks, switches, data storage, and telecommunications equipment, with cooling and power supply serving that equipment around the clock. In a hotel this room is small, but its power density is high. The facility standards of GSA, the manager of US federal buildings, set a minimum receptacle load of 540 W/m² for technology and server rooms, compared with 14 W/m² for enclosed offices. One square meter of server room carries the load of about 39 m² of office, and almost all of that power becomes heat.
US military facility criteria ask for telecommunications spaces to be dedicated and not shared with electrical rooms, mechanical rooms, or plumbing, to be evaluated for risk from water, dust, and electromagnetic interference, to be kept away from transformers, motors, and generators, and to have access limited to people who work there. In renovations, rooms containing transformers or air handling units are avoided, and suspended ceilings are not installed in telecommunications spaces. Water pipes above the racks, a wall shared with a kitchen or laundry, or a server room that also serves as a storeroom are findings to report.
The division of duties needs to be written down: the IT manager owns the equipment in the racks, the building technician owns the room, cooling, condensate drain, lighting, door, and environmental sensors, and authorized electrical technicians own the panels and circuits. Without that list, an air conditioner that fails at night becomes everyone’s business and nobody acts.
Temperature and humidity at the equipment air inlet
IT equipment draws air in at the front and discharges hot air at the back. What determines its reliability is the inlet air temperature, the temperature of the air directly in front of the equipment intake. The data center guide of the US Department of Energy’s Federal Energy Management Program (FEMP) asks for temperature to be controlled within the recommended range at the equipment intakes, and for supply temperature to be controlled on the basis of equipment inlet air temperature, not return air temperature. A sensor on the wall near the ceiling, as in the opening case, measures mixed air.
The FEMP guide reproduces the ASHRAE 2021 thermal guidelines table for air cooling:
| Range | Dry-bulb temperature | Relative humidity |
|---|---|---|
| Recommended, classes A1 to A4 | 18 to 27 °C (64.4 to 80.6 °F) | 8 to 70 percent |
| Allowable, class A1 | 15 to 32 °C (59 to 89.6 °F) | 8 to 80 percent |
| Allowable, class A2 | 10 to 35 °C (50 to 95 °F) | 8 to 80 percent |
| Allowable, class A3 | 5 to 40 °C (41 to 104 °F) | 8 to 85 percent |
| Allowable, class A4 | 5 to 45 °C (41 to 113 °F) | 8 to 90 percent |
According to the note to that table, if testing shows corrosion levels exceeding their limits, the upper humidity limit drops to 50 percent. The recommended range is the condition aimed for in energy-efficient operation with high reliability, while the allowable range is the limit tested by manufacturers for equipment functionality, not for reliability. So 30 °C in front of a class A1 rack is still “allowable,” but it is already a reason to act. The equipment class is written on the manufacturer’s data sheet and is asked of the IT manager, not guessed.
The FEMP guide suggests keeping the inlet air temperature of the most demanding equipment as close to 80 °F as possible, with a practical setpoint of 77 to 79 °F (about 25 to 26 °C), raised in small steps after the airflow has been put right. Air that is too warm also has a cost: server fans can run 30 percent faster when the inlet air rises from 77 °F to 91 °F, so their fan power more than doubles.
Humidity is read as dew point and relative humidity. According to the FEMP guide, most data centers do not need humidification to maintain the recommended minimum humidity, a dew point of 15.8 °F (about minus 9 °C) or about 10 percent relative humidity; overly tight humidity control wastes energy, and adjacent units can fight each other when their sensors drift and are not recalibrated. In a humid tropical climate, what needs watching is humid outdoor air entering through a wedged door and cold surfaces collecting condensation.
Heat load, airflow, and precision cooling
Almost all the power going into IT equipment becomes heat. The room heat load:
where is the heat load removed by the cooling (kW), is the real power of the IT equipment (kW) read from the UPS or PDU display, not from the nameplate, is the UPS and distribution losses in that room (kW), and is lighting and people (kW). That heat is carried by the air passing through the equipment:
where is the airflow (m³/s), is the density of air (about 1.2 kg/m³), is the specific heat of air (about 1.005 kJ/(kg·K)), and is the air temperature rise from the front to the back of the equipment (K). This formula assumes all the cold air passes through the equipment; air bypassing around the racks does no cooling.
A computer room air conditioner (CRAC), or precision cooling unit, is a cooling unit designed for the dry heat load of an equipment room, working continuously and controlling temperature and humidity with its own sensors. The FEMP guide notes packaged direct expansion units, commonly called CRAC units, as the most common cooling for small data centers. Many hotel server rooms use an ordinary split air conditioner designed for offices and often run on a schedule. Military facility criteria ask for each telecommunications room to have its own thermostat controlling temperature year-round, 24 hours a day, without building time clocks or setback, and, when required by the system owner, for the room to be kept at positive pressure to keep dust out.
A cold aisle and hot aisle arrangement places racks back to back so that all rack fronts face an aisle receiving cold air and all rack backs discharge heat into another aisle. The FEMP guide asks for vacant rack slots to be blocked off on the intake side, cable openings in floors and ceilings to be sealed as tightly as possible, and abandoned cables to be removed because they obstruct the airflow. The cover for an empty slot is called a blanking panel. Open slots, boxes in front of intakes, or supply openings covered by stored items can be seen without opening a rack.
N+1 redundancy means the cooling capacity remains sufficient for the whole load when the largest single unit fails. Two air conditioners that each cannot carry the whole load are not a backup (Example 4).
Power supply, UPS, generator set, and cooling during a power outage
IT equipment is supplied through a UPS. The NIST security controls for information systems state that a UPS provides near-instantaneous protection when the main power source is lost, with a relatively short backup time that is enough to start a generator or shut the system down properly. The UPS is covered in Chapter 107, and a whole-building outage in Chapter 118 on total building power outages and recovery.
What is often forgotten is cooling. The room air conditioner is usually not on the UPS, so heat keeps building up while the generator has not started or if the air conditioner is not part of the generator load. The GSA standard includes the UPS and the HVAC systems of server rooms, UPS rooms, and communications rooms among the loads supplied by the generator standby system. The US Air Force fire protection guide for IT equipment rooms notes that loss of cooling can produce ceiling and room temperatures exceeding those expected in a fire and can even activate gaseous suppression or sprinkler systems, and it asks for an interlock that disconnects power to IT equipment when the minimum cooling capacity is lost. How fast the room heats up is calculated in Example 3.
An emergency power off is a switch that disconnects power to the equipment in that room in an emergency. NIST asks for that switch to be easily reached by authorized personnel and protected from operation by unauthorized people. According to the Air Force guide, the procedure is permanently posted at the disconnect location, at the operator’s location, and at the main exit, and is exercised jointly with the fire service at least once a year. The building technician knows where it is and who is authorized to use it.
Early fire detection and water leaks
Cables, circuit boards, and batteries can smolder for a long time before they flame, and the cooling airflow dilutes smoke so that ordinary spot detectors react late. That is why military facility criteria ask for electronic equipment areas to be protected by very early warning smoke detection, a system listed as capable of very early warning protection according to NFPA 76, with a maximum coverage of 18.5 m² per detector or per sampling point. A common form is the aspirating smoke detector, which draws air through perforated pipes into a highly sensitive measuring chamber (Chapter 20 · Buildings & Facilities on fire detectors).
That detection gives at least two alarm levels for increasingly dense smoke, all reported to the operators and, when the room is not constantly attended, to an alarm receiving location that is always staffed. According to the Air Force guide, the alert level activates notification in the equipment room so that operators can correct the condition while it is still small, without building evacuation; the alarm level sends an alarm to the receiving center and starts evacuation. In a hotel, the alert level is received by the on-duty technician and the IT manager, and the action is to check from outside the racks for smell, heat, or smoke, then call the IT manager (Chapter 19 · Buildings & Facilities on fire alarm panels).
Water is the second hazard: pipes running through, a clogged condensate drain, a leaking roof, or a broken sprinkler head. NIST asks for master shutoff or isolation valves that are accessible, working properly, and known to key personnel, plus sensors that detect water near the system and alert designated personnel. The choice of suppression is set by the designer; the GSA standard, for example, requires wet-pipe sprinklers throughout IT equipment rooms and does not permit gaseous systems unless supported by a risk assessment and approved by the regional fire protection engineer.
Access, cleanliness, and items in the room
The server room is a restricted room, and for a hotel it is also a matter of guest data. NIST asks for authorization to be verified before people enter, access records to be kept, visitors to be escorted, keys and combinations to be secured, inventoried, and changed when lost or when their holders move or leave. Visitor records contain name and organization, identification, date, entry and exit times, purpose, and the person visited, and access records are reviewed for anomalies such as entry outside working hours or staying inside too long. A door wedged open with a chair defeats all of this at once and lets in dust and humid air.
Cleanliness means little dust, no combustible materials, and no water. Boxes, paper, and old equipment are not stored inside. Floors are cleaned with a vacuum cleaner or a damp cloth wrung dry, not a wet mop. Cleaning staff enter together with a technician or IT staff and do not touch racks, cables, or buttons. Drilling, cutting the ceiling, or sanding is done with a work permit and coordination with the IT manager and the fire protection contractor, because dust can trigger highly sensitive detectors and, in a room with gaseous suppression, start the release sequence (Chapter 49 · Buildings & Facilities). New cable holes are sealed again with firestop material.
Monitoring, alarms, and records
NIST asks for temperature and humidity to be maintained and monitored at a defined frequency, with an alarm or notification when changes occur that could harm people or equipment. The FEMP guide asks for temperature and humidity sensors at the equipment intakes at the heights given by the ASHRAE thermal guidelines, monitoring of the supply temperature and humidity of each CRAC unit, and all measured values to be trended and archived for at least one year. A minimum point list for a hotel server room:
- Inlet air temperature at the top and bottom of the hottest rack.
- Room relative humidity or dew point.
- Status and supply temperature of each air conditioner or CRAC.
- Water leak sensors under the air conditioners, along the condensate drain, and under pipes running through.
- UPS status: on battery, alarm, and remaining backup time.
- Door held open longer than a set limit.
- Alert and alarm levels of the very early warning smoke detection, through the fire alarm panel.
Alarms are sent to a location that is always staffed and to the IT manager’s phone. Temperature limits should have two levels, for example a warning at the upper limit of the recommended range and an emergency alarm a few degrees below the upper limit of the allowable range, with a time delay and hysteresis (Chapter 33 · Buildings & Facilities). Sensor accuracy has to suit the purpose: the FEMP guide notes that a pair of sensors accurate to plus or minus 1.5 °F is of no use for measuring a temperature difference that can be as low as 5 °F. Sensors are compared against a reference thermometer, and the date is recorded.
The most commonly used efficiency measure is PUE (power usage effectiveness), the ratio of the annual energy of the whole facility to the annual energy of the IT equipment:
where is the total energy of the facility including cooling, UPS, and lighting (kWh), and is the energy of the IT equipment (kWh). The FEMP guide notes an average data center PUE of 1.6 and some very efficient data centers below 1.1. Without a submeter for the server room cooling, the PUE of a small room is only a guess.
Worked example
The numbers in the examples below are practice numbers unless their origin is stated.
Example 1: reading ranges in Fahrenheit. With , the recommended range becomes °C to °C, and the upper limit of the class A1 allowable range °C. In the opening case, the thermometer reads 26.5 °C in front of the bottom of the rack and 33 °C at the top. The bottom reading is still recommended; the top reading is already outside the class A1 allowable range. The decision to shut down equipment belongs to the IT manager, but the technician should have called them before 27 °C was passed.
Example 2: heat load and airflow. The UPS display shows 7.6 kW, UPS and distribution losses are 0.6 kW, and lighting and one person 0.2 kW, so kW. With a 12 K temperature rise across the rack, m³/s, that is m³/h. A much smaller airflow, or one blown in the wrong direction, does not keep the equipment inlet air in range.
Example 3: how fast the room heats up. A room 5 m by 4 m by 3 m holds m³ of air with a mass of kg. If the cooling fails and the 8.4 kW load keeps running from the UPS, the air alone heats up at K/s, that is K per minute. Walls, racks, and equipment absorb part of the heat; if the effective thermal mass is taken as ten times the mass of the air, the rate is 0.70 K per minute, and the room goes from 24 °C to 32 °C in minutes, shorter than the backup time of many UPS units.
Example 4: are two air conditioners N+1. The room in Example 2 uses two air conditioners of 7.0 kW each. Together kW, enough for 8.4 kW, but if one fails only 7.0 kW remain, short by kW. That room is not N+1. Three 7.0 kW units give kW when one fails; another option is two units of at least 8.4 kW each plus a margin for load growth. Capacity at the local outdoor temperature is set by the HVAC designer.
Example 5: sampling points for very early warning smoke detection. A room 6 m by 7 m has an area of m². With a coverage of 18.5 m² per point, , rounded up to 3 points at ceiling level. Final locations follow the manufacturer’s listing, the air conditioner airflow, and the aisle layout, and are set by the fire protection contractor. A single spot detector in the middle of the room cannot be called very early warning detection.
Example 6: PUE from submeters. Over one month, the UPS output submeter records 5,600 kWh for IT equipment, the air conditioner submeter 2,700 kWh, UPS losses from the difference between the input and output meters 560 kWh, and lighting 100 kWh. Facility energy is kWh, so . After blanking panels are installed and the supply temperature is raised in steps, air conditioner energy falls to 2,200 kWh and . The comparison only means something if the inlet air temperature stays within the recommended range.
Stop conditions
- The inlet air temperature has passed the upper limit of the recommended range and keeps rising, or the server room air conditioner has failed with no standby unit: phone the IT manager and the chief engineer at once, call the HVAC technician, and record the temperature every few minutes; do not open racks, do not shut down servers, and do not wedge the door open. The decision to shut down equipment belongs to the IT manager.
- There is water on the floor, dripping from the ceiling or the condensate drain, or a leak sensor in alarm near a rack or PDU: do not touch wet equipment or cables and do not mop around live equipment; close the water valve serving that room if its location is known and it can be reached without touching wet equipment, then call the IT manager and an authorized electrical technician.
- There is a burning smell, visible smoke, or the very early warning smoke detection gives an alert or alarm level: do not open racks or panels; report to the IT manager and the fire alarm duty officer, and at the alarm level or when flame is seen, carry out the building fire procedure. In a room with gaseous suppression, leave at once when the pre-discharge alarm sounds according to Chapter 49 · Buildings & Facilities.
- The UPS is running on battery without a power outage, is in alarm, or its battery cabinet smells, is hot, or is swollen: stop any work in that room and hand over to the UPS vendor according to Chapter 107.
- Work on a distribution panel, PDU, or circuit in the server room is needed: hand it over to an authorized electrical technician with a work permit according to Chapter 76, after the IT manager has approved the timing.
- Dusty work, hot work, or making holes in the walls, floor, or ceiling is planned: postpone until there is a work permit, notification to the IT manager, and coordination with the fire protection contractor; detectors are isolated only by an authorized person according to Chapter 19 · Buildings & Facilities.
- The door cannot lock, a key or access card is lost, or there is an unauthorized person inside: report to security and the IT manager, and do not leave the room open without a guard.
- Boxes, paper, cleaning materials, or other stored items are found in the server room: remove items not attached to equipment after informing the IT manager, and report to management.
Common misinterpretations
Guess what’s wrong first, then open the explanation.
Common misconception
The colder the server room, the safer.
Why is it wrong?
The recommended range starts at 18 °C, and the FEMP guide suggests equipment inlet air as close to its upper limit as possible once airflow is managed. A room at 16 °C wastes energy.
Common misconception
The wall thermostat reads the server temperature.
Why is it wrong?
What matters is the temperature in front of the equipment intake. A sensor near the ceiling can read 25 °C while the air in front of the top of the rack is already 33 °C.
Common misconception
Humidity must be held tightly at 50 percent.
Why is it wrong?
The recommended range is wide, and tight control makes units fight each other. What must be kept is no condensation and not too dry, with calibrated sensors.
Common misconception
The servers are on a UPS, so a power outage is not dangerous for the room.
Why is it wrong?
The UPS keeps the servers running, not the air conditioner. Without cooling, a small room heats up by several degrees per minute, so cooling needs to be on the generator load.
Common misconception
An alert level from very early warning smoke detection means everyone is evacuated.
Why is it wrong?
The alert level is intended for operators to check and correct the condition while it is small. Evacuation starts at the alarm level or when flame is seen.
Links to other chapters
The server room depends on the UPS in Chapter 107, the network in Chapter 108, and the BMS in Chapter 32 · Buildings & Facilities and Chapter 33 · Buildings & Facilities. Its cooling is covered in Chapter 14 · Fluids & Thermal and Chapter 16 · Fluids & Thermal, fire alarms in Chapter 19 · Buildings & Facilities to Chapter 23 · Buildings & Facilities, fire protection in Chapter 17 · Buildings & Facilities, gaseous suppression in Chapter 49 · Buildings & Facilities, and total power outages in Chapter 118.
Exercises and worked solutions
The numbers in the exercises are for practice.
Try to answer first, then open the worked solution.
A sensor in front of a rack reads 81 °F. Is it still within the recommended range?
Check my answer
See the worked solution
°C, slightly above the upper limit of the recommended range of 27 °C. The equipment is still within the class A1 allowable range, but the condition is recorded and reported to the IT manager so that the cause is found before the temperature keeps rising.
The heat load of a server room is 5.0 kW and the air temperature rise across the equipment is 10 K. What airflow must pass through the equipment?
Check my answer
See the worked solution
m³/s, about 1,490 m³/h. That airflow must actually pass through the equipment; air bypassing through empty slots does not count, so blanking panels and the aisle layout also matter.
Why did the BMS temperature sensor in the opening case fail to give a warning, and where should it have been installed?
Check my answer
See the worked solution
The sensor was mounted on the wall near the ceiling, far from the racks, so it read mixed air that was cooler than the air in front of the top of the rack. The sensor should have been installed at the equipment intakes, at the top and bottom of the hottest rack, with an alarm limit referenced to the inlet air temperature range.
A server room uses two air conditioners of 5.0 kW each for a 6.0 kW load. Does the room have N+1 backup?
Check my answer
See the worked solution
Together they give 10.0 kW, but if one fails only 5.0 kW remain, 1.0 kW short of the load. The room is not N+1, so the failure of one unit makes the temperature rise immediately; the HVAC designer needs to add a unit or increase capacity.
A cleaner asks whether the server room floor may be wet-mopped every day. What is the technician’s answer?
Check my answer
See the worked solution
No; the floor is cleaned with a vacuum cleaner or a damp cloth wrung dry, because water near cables and live equipment is dangerous and raises humidity. Cleaning staff enter together with a technician or IT staff and do not touch racks, cables, or buttons.
A server room 4 m by 9 m is to be fitted with very early warning smoke detection. What is the minimum number of sampling points based on the coverage per point?
Check my answer
See the worked solution
The area is m², and , rounded up to 2 points. That is the minimum by area; final locations follow the air conditioner airflow and the manufacturer’s listing, and are set by the fire protection contractor.
References
External sources
- Best Practices Guide for Energy-Efficient Data Center Designenergy.gov
- UFC 3-580-01 Information and Communications Technology Infrastructure Planning and Designwbdg.org
- UFC 3-600-01 Fire Protection Engineering for Facilitieswbdg.org
- TSFPEWG G 3-600-01.01-18 Air Force Fire Protection Engineering Criteria and Technical Guidance for Mission Continuity of Electronic, Information Technology, and Telecommunications Equipment Installationswbdg.org
- NIST SP 800-53 Rev. 5 Security and Privacy Controls for Information Systems and Organizationsnvlpubs.nist.gov
- P100 Facilities Standards for the Public Buildings Servicegsa.gov
Revision history
| Date | Version | Change |
|---|---|---|
| November 15, 2026 | 1 | First published |
How to cite
Kurnia (2026). Hotel server rooms from the building technician’s side: temperature and humidity, power supply and UPS, precision cooling, early fire detection, access and cleanliness, and monitoring. ARSTEMA Academy. Revised November 15, 2026. arstema.com/en/academy/konsep/ruang-server-hotel-dari-sisi-teknisi-gedung-suhu-dan-kelembapan-catu-daya-dan-ups-pendingin-presisi-deteksi-kebakaran-dini-akses-dan-kebersihan-serta-pemantauan
Self-check · 3 questions
Check your understanding before moving on
Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.
A sensor in front of a rack reads 81 °F. Is it still within the recommended range?
The heat load of a server room is 5.0 kW and the air temperature rise across the equipment is 10 K. What airflow must pass through the equipment?
Why did the BMS temperature sensor in the opening case fail to give a warning, and where should it have been installed?
Nearby chapters
Reading order by shelf: Electrical & Control · Chapter 120.
Reading order by shelf: Electrical & Control · Chapter 118.