    At a 28-story hotel, a glass-cleaning gondola cradle is still working at the 18th floor when the roof anemometer records gusts of 35 km/h, while the pool area below has not been cordoned off and one of the operator’s helpers has no license. This chapter covers facade access from the building technician’s side: building maintenance units and gondolas as personal platforms under Permenaker 8/2020, wire ropes, brakes, and safety devices as concepts, rails, counterweights, and roof anchor points, cradle load, tilt, and platform floor, wind and weather including the prohibition on operating a gondola in wind above 32 km/h, daily checks and statutory inspection and testing, and the division of work. HSE guidance and the UK LOLER regulations are used for comparison and written as UK data. This chapter is learning material, not a work instruction: operating a gondola, adjusting brakes, and bypassing safety devices are not taught, and gondola operators and technicians must hold a K3 license.

    High-risk material

    This material involves real hazards. A concept explanation doesn’t replace site procedures, competency, energy isolation, the latest SDS, or a work permit.

    Section you’re reading: Chapter opening

    At 07:30 on the roof of a 28-story hotel in Jakarta, a glass-cleaning contractor lowered the cradle from a building maintenance unit that travels on rails. The anemometer on the unit’s arm read 22 km/h. At 10:15, with the cradle at the 18th floor, gusts rose to 35 km/h and the cradle began to swing toward the glass. The operator wanted to finish one more column of glass, since only four floors were left. Below that facade was the pool deck, still in use by guests, and barrier tape had been put up only on the lobby side. That morning the building technician also found that one of the two people in the cradle was a new helper who did not yet hold a license. The building technician does not operate the gondola, but they are the one asked whether the work may continue, and they need to know the basis for that decision.

    Scope

    This chapter covers facade access for glass cleaning from the building technician’s side: building maintenance units and gondolas, wire ropes, brakes, and safety devices as concepts, rails, counterweights, and roof anchor points, cradle load and tilt, wind and weather, daily checks and statutory inspection and testing, and the division of work. Its basis is Permenaker 8/2020 (Minister of Manpower Regulation) on K3 for lifting and conveying equipment, which as of November 2026 is listed as in force in the JDIH database of the Ministry of Manpower; some of its articles, including Article 173 paragraph (3) on who carries out inspection and testing, were revoked by Permenaker 11/2026 on labor inspection procedures. HSE guidance and the UK LOLER regulations are used for comparison and written as UK data.

    This chapter is learning material, not a work instruction. It contains no steps for operating a gondola, lowering a cradle in an emergency, adjusting or releasing brakes, setting safety devices, or bypassing limit switches. That work belongs only to gondola operators and technicians holding a K3 license, the manufacturer or its agent, and authorized K3 inspectors and testers. The building technician does not ride in the cradle, does not touch the control panel, and does not repair ropes, motors, or brakes.

    Work at height, harnesses, and ladders are covered in Chapter 10 · Safety, lifting loads and slings in Chapter 9 · Safety, roofs and their membranes in Chapter 35, permits to work in Chapter 76 · Electrical & Control, and how to read contractor reports containing brake and wire rope measurements in Chapter 28 on lift maintenance reports. Cracked or broken glass is covered in Chapter 50 on building glass and windows.

    Building maintenance units and gondolas

    A gondola is lifting equipment for people consisting of a cradle suspended on wire ropes from a structure on the roof and raised and lowered along the facade. Permenaker 8/2020 classifies the gondola as a personal platform, one type of lifting equipment, and lists its components: rails, mast, an arm or boom, winding drum, electric motor, and cradle. A building maintenance unit (BMU) is a permanent gondola installed on the building, usually a carriage on roof rails with an arm that can slew and extend. A temporary gondola is set up for a single job with supports on the roof or with a counterweight.

    The UK HSE describes cradles and building maintenance units as suspended access equipment, a type of specialist access equipment for windows that are hard to reach, and notes that in many cases the equipment is owned and maintained by the building owner. In other words, the glass-cleaning contractor brings the people, but the condition of the unit, its inspection records, and its rescue plan are often the responsibility of the building management.

    Before a gondola is chosen, the first question is whether work at height can be avoided. HSE guidance on working at height sets an order: avoid work at height where reasonably practicable, where it cannot be avoided prevent falls, and where falls cannot be prevented minimize the distance and consequences. Guidance on cleaning glass with water-fed poles, prepared by a UK window cleaners’ association with contributions from HSE, notes that this method can clean windows up to about 24 m from the ground without working at height. Glass on the lower floors, canopies, and lobby can often be cleaned from the ground; the gondola is used for the parts that genuinely cannot be reached.

    Wire ropes, brakes, and safety devices

    The cradle hangs on main wire ropes that are wound on a drum or pass through a hoist. Permenaker 8/2020 requires gondola suspension wire ropes to have a safety factor of at least 8, an independent wire rope core (IWRC), corrosion resistance, flexibility, the ability to resist torsional moment, attachment with clamps, and inspection at first installation, every day before operation, and once a week. The safety factor is the ratio of a rope’s breaking force to the working force it carries:

    Ksafe=FbreakFwork,Fwork=msusp×gNropeK_{safe} = \frac{F_{break}}{F_{work}}, \qquad F_{work} = \frac{m_{susp} \times g}{N_{rope}}

    where KsafeK_{safe} is the safety factor, FbreakF_{break} is the rope’s minimum breaking force from its certificate (N), FworkF_{work} is the force on one rope (N), msuspm_{susp} is the mass of the cradle, hoists, people, and equipment (kg), g=9.81g = 9.81 m/s², and NropeN_{rope} is the number of main ropes sharing the load. This formula covers static load only; shock loads, sheave friction, and uneven load sharing make the real force larger, so the official calculation belongs to the manufacturer and the authorized K3 inspector. The visual inspection in the gondola inspection form looks for cracks, wear, corrosion, and deformation.

    The same form lists the safety devices that are checked: the safety lock, the safety rope, the upper limit switch, the load limit switch, the emergency stop, the rubber bumpers, the life line, and the harness. In concept, the brake on the hoist holds the drum or sheave when the motor stops or the power fails, while the safety lock is a second device that grips the safety rope if the cradle descends too fast or tilts excessively. The UK LOLER regulations use the same principle: a suspended carrier for people should not fall if the primary means of support fails, for example through multiple ropes with independent anchorages or safety gear.

    These devices only work if they are left unaltered. A brake adjusted in the field so that the cradle does not judder, a limit switch wedged so that the cradle can rise higher, and a safety lock tied back so that it locks less often are bypasses that remove the last layer of protection. When a safety device operates, it is a sign that something is wrong and the unit is checked by a licensed technician, not a matter of finding a way around it.

    Rails, counterweights, and roof anchor points

    The whole load of the gondola is ultimately carried by the roof structure. Permenaker 8/2020 requires the gondola rails, mast, and arm to be made of steel with a safety factor of 5. A permanent gondola is installed firmly on its track rails, fitted with locks, with the rails firmly fixed to supports on the roof, and given a clearance of at least 90 cm from the outer side of the cradle except on the side facing the building. A temporary gondola is installed on supports on the roof, or uses a counterweight and a mast reinforced with tie ropes hooked to anchors in the building structure.

    A counterweight is the mass at the rear end of a temporary gondola’s arm that resists the overturning moment of the cradle hanging from the front end. The required ratio of restoring moment to overturning moment and the counterweight mass are set by the manufacturer and checked during statutory inspection and testing, so the counterweight is never reduced, moved, or replaced with other objects. The gondola inspection form records the front and rear arm lengths, the distance from the counterweight to the arm, clamps, turnbuckles, tie ropes, and connecting bolts.

    Permenaker also requires the gondola to be fitted with a life line tied to the building structure, with the operator wearing a harness attached to that line. The attachment point of the life line is separate from the cradle suspension point, so that the failure of one system does not bring people down with the cradle. Selecting and inspecting harnesses and fall protection lines is covered in Chapter 10 · Safety.

    The building technician visually checks what is part of the building: rails that have shifted or rusted, loose support bolts, a roof membrane that is torn or leaking around the feet of the supports (Chapter 35), rusted anchors, and objects blocking the track. Findings are recorded and reported; rails, anchors, and supports are not repaired by the technician.

    Load, tilt, and the cradle floor

    Permenaker 8/2020 requires a gondola to be operated without exceeding the maximum permitted load, raised and lowered slowly without shock loading, with its suspension ropes free of obstructions, and without the cradle tilting more than 15°. HSE says the same about load: the manufacturer’s safe working load is never exceeded by the weight of people and equipment. The load is calculated from everything that goes into the cradle:

    mtotal=∑mpeople+∑mequip≤mSWL,sin⁡θ=ΔhLs,δmax=Lr60m_{total} = \sum m_{people} + \sum m_{equip} \le m_{SWL}, \qquad \sin\theta = \frac{\Delta h}{L_s}, \qquad \delta_{max} = \frac{L_r}{60}

    where mSWLm_{SWL} is the safe working load on the cradle plate (kg), θ\theta is the cradle tilt, Δh\Delta h is the height difference between the two ends of the cradle (m), LsL_s is the cradle length (m), δmax\delta_{max} is the permitted deflection of the working floor (m), and LrL_r is the length of the working floor frame (m). Water, buckets, hoses, and cleaning tools are included.

    Permenaker prohibits using a gondola when the working floor frame of the cradle deflects more than 1/60 of the frame length, and prohibits hanging the cradle from an arm that has not been fully installed. The cradle must also have anti-impact devices in the form of rollers and soft padding along the bumper, plus toeboards. Missing rollers and bumpers let a swinging cradle strike the glass, and that impact can crack the glass (Chapter 50).

    Wind and weather

    Wind is the most frequent reason for stopping gondola work. Permenaker 8/2020 requires the gondola to be fitted with a wind direction and speed indicator, and prohibits anyone from operating a gondola when the wind speed exceeds 32 km/h. HSE says that suspended access equipment is not used in weather conditions outside the manufacturer’s quoted safe ranges. Both limits apply together, so the lower one is used. To compare units:

    v [m/s]=v [km/h]3.6v\,[\text{m/s}] = \frac{v\,[\text{km/h}]}{3.6}

    The LOLER guidance explains how to read the wind properly. Weather forecasts give a general picture but do not show the wind at that moment in that place, so a reliable means of measuring the wind, including gusts, is needed. The anemometer is fixed in the most exposed position, and hand-held instruments or estimates on the Beaufort scale may not show the wind at that position. Wind on the roof of a tall building is often much stronger than at street level, and a sheltered part of the facade can suddenly open to the wind at the corner of the building.

    The same guidance uses a wind action level, the wind speed that triggers additional measures such as stopping until the wind dies down or lowering the load, and notes that these measures can apply to suspended access systems. For other weather, the LOLER guidance names excessive wind speed, poor visibility due to fog, lightning, and heavy rain as reasons to stop lifting in the open air. For a hotel, the action level is written into the work plan: which figure stops the work, who reads the anemometer, and who decides.

    Daily checks, statutory inspection and testing, and documents

    Gondola inspection works in layers. The first layer happens before operation: Permenaker 8/2020 requires the wire ropes to be inspected every day before operation and once a week. In the field this check is done by the contractor’s gondola operator or technician; the building technician does not replace it, but makes sure the result is recorded before the cradle goes down.

    The next layer is riksa uji, the statutory inspection and testing of lifting equipment required by regulation. Permenaker 8/2020 requires inspection and testing at design, manufacture, installation, use, repair, and modification, and divides it into first, periodic, special, and repeat inspection and testing. Periodic inspection and testing is carried out no later than 2 years after the first inspection, then once every 1 year; special inspection is carried out after a work accident, fire, or explosion. Permenaker 11/2026 provides that the test report is the basis for a certificate stating that the equipment does or does not meet K3 requirements, and where it does not, the labor inspector prohibits or stops the work process.

    In the UK, LOLER requires lifting equipment for lifting people that is exposed to conditions causing deterioration to be thoroughly examined at least every 6 months or under an examination scheme, and each time exceptional circumstances occur. HSE guidance for employers adds that a serious defect reported by the competent person means the equipment must be taken out of service immediately until it is put right. This UK figure does not replace the Indonesian schedule, but it shows that there, lifting equipment for people is examined twice as often as other lifting equipment, whose interval is 12 months.

    HSE also lists the documents the building owner prepares for the glass-cleaning contractor: site-specific instructions on accessing the equipment, the operating and maintenance instructions, copies of the examination certificate together with inspection, maintenance, and testing records, and the emergency procedures and rescue plan. In a hotel, that list becomes the file the building technician checks every time the contractor arrives.

    Work boundaries and the building technician’s role

    Permenaker 8/2020 provides that a gondola is operated by a gondola operator wearing a harness attached to the life line. An operator of a personal platform, including a gondola, must have at least a junior secondary education, at least 1 year of experience assisting in the field, a medical certificate of fitness from a doctor, a minimum age of 19 years, a competency certificate, and a K3 license. The regulation also prohibits anyone from changing or modifying a gondola without first reporting to the labor inspection unit.

    HSE stresses that only competent, trained, and instructed operators use suspended access equipment, and that all tools taken into the cradle are secured, for example with a tool lanyard. Objects falling from the cradle are a hazard to people below, so the area beneath the facade is managed before work starts.

    The LOLER guidance calls for a reliable means of rescue if lifting equipment for people malfunctions, with communication devices that are regularly inspected, and notes that emergency lowering and self-rescue equipment are appropriate only where the users are trained and competent. The rescue plan for people stranded in the cradle is prepared by the contractor together with the building management before the work, not improvised when the cradle gets stuck.

    In a hotel, the division of work looks like this. Licensed gondola operators and technicians operate, check daily, and maintain the unit. Labor inspectors and K3 testers handle statutory inspection and testing and the certificates under Permenaker 11/2026. The building technician checks the file and licenses, records the wind, arranges the permit to work (Chapter 76 · Electrical & Control), cordons off the area beneath the facade, tells the front office to keep guests away, sets up communication with the cradle, and stops the work if any stop condition occurs.

    Worked example

    The numbers in the examples below are practice figures unless their origin is stated.

    Example 1: reading the anemometer against the wind limit. The Permenaker limit of 32 km/h is equivalent to 32/3.6=8.8932/3.6 = 8.89 m/s. The anemometer in the opening case recorded gusts of 35 km/h, or 35/3.6=9.7235/3.6 = 9.72 m/s, exceeding the limit by 35−32=335 - 32 = 3 km/h. If the manufacturer’s manual sets a limit of 10 m/s, or 10×3.6=3610 \times 3.6 = 36 km/h, the limit used is still 32 km/h because it is lower. The operator brings the cradle down according to their procedure and the work stops, even though only four floors are left.

    Example 2: load in the cradle. The cradle plate states a safe working load of 250 kg. Two operators of 78 kg and 84 kg carry tools, buckets, and water weighing 38 kg, so mtotal=78+84+38=200m_{total} = 78 + 84 + 38 = 200 kg and the remaining capacity is 250−200=50250 - 200 = 50 kg. A third person weighing 70 kg makes the load 200+70=270200 + 70 = 270 kg, exceeding the safe working load, so that person is not allowed to board.

    Example 3: rope safety factor from the certificate. A cradle and hoists weighing 320 kg carry a load of 200 kg on 2 main ropes, so Fwork=(320+200)×9.81/2=2,550.6F_{work} = (320 + 200) \times 9.81/2 = 2{,}550.6 N, about 2.55 kN. The rope certificate states a minimum breaking force of 30 kN, so Ksafe=30/2.55=11.8K_{safe} = 30/2.55 = 11.8, above 8. If the certificate that arrives turns out to be for an 18 kN rope, Ksafe=18/2.55=7.1K_{safe} = 18/2.55 = 7.1, below 8, and the mismatch is reported to the building management and the contractor before the unit is used. This calculation checks documents; it does not replace the manufacturer’s calculation.

    Example 4: a tilted cradle. A 6 m cradle is seen to be 1.2 m lower at one end. Its tilt is sin⁡θ=1.2/6=0.2\sin\theta = 1.2/6 = 0.2, or θ=11.5°\theta = 11.5°, still below 15°. The height difference at the 15° limit is 6×sin⁡15°=1.556 \times \sin 15° = 1.55 m. A tilt that keeps increasing is a sign of a fault in one of the hoists or ropes, so the operator stops the movement and calls a licensed technician.

    Example 5: working floor and clamps. A working floor frame 4.8 m long may deflect by at most 4.8/60=0.084.8/60 = 0.08 m, or 80 mm. A measured deflection of 55 mm is still below the limit, but a deflection of 85 mm exceeds 80 mm and the cradle is not used. For a rope with a breaking force of 30 kN, the cradle attachment clamps must have a tensile strength of at least 1.5×30=451.5 \times 30 = 45 kN.

    Example 6: inspection and testing schedule and rope checks. A building maintenance unit completed its first test on April 14, 2025. Periodic inspection and testing is due no later than April 14, 2027, then every year in 2028 and 2029. If the unit operates 200 days a year, the ropes receive 200 daily checks plus 52 weekly checks. For comparison, the UK schedule with a thorough examination every 6 months gives 48/6=848/6 = 8 examinations in 4 years.

    Stop conditions

    1. The wind speed or gusts on the roof exceed 32 km/h or the manufacturer’s limit, whichever is lower, or there is lightning, heavy rain, or fog: work stops; the operator brings the cradle down according to the manufacturer’s procedure, and the contractor’s supervisor and the building technician record the time.
    2. The cradle tilts toward 15°, gets stuck partway down the facade, a rope is snagged, or the safety lock has engaged: do not try to pull the cradle, release the brake, set the safety lock, or lower the cradle from the roof; the contractor’s supervisor carries out the rescue plan with a trained team, and emergency services are called if needed.
    3. A wire rope has broken wires, rust, kinks, crushing, or abnormal slack, or a limit switch, emergency stop, or communication device is not working: the unit is not used until a licensed gondola technician repairs it and, if needed, the unit undergoes repeat inspection and testing.
    4. The inspection and testing certificate is missing or expired, there is no daily check record, or the operator does not hold a K3 license: the work does not start; the building management and the contractor sort out the documents first.
    5. The load in the cradle would exceed the safe working load, or an additional person without a license is present: that person or item does not board.
    6. The rails, supports, arm, counterweight, anchors, or tie ropes on the roof are damaged, loose, displaced, or being modified, or the cradle working floor deflects more than 1/60 of its length: the unit is not used; repairs are by the manufacturer or a licensed technician, and modifications are reported to the labor inspection unit.
    7. The area beneath the facade has not been cordoned off, guests or workers are below the cradle, or cracked glass is found during cleaning: work on that column stops; security clears the area, and the glass is handed over to the glazing contractor (Chapter 50).
    8. A person is hanging in a harness after falling from the cradle: call emergency services and the trained rescue team immediately; do not wait for the person to rescue themselves.

    Common misinterpretations

    Guess what’s wrong first, then open the explanation.

    Common misconception

    The wind is calm on the street, so the gondola is safe.

    Why is it wrong?

    Wind on the roof of a tall building and at the corners of the facade can be much stronger. What counts is the anemometer reading at the most exposed position, including gusts.

    Common misconception

    The gondola belongs to the hotel, so the hotel technician may operate it.

    Why is it wrong?

    A gondola is operated only by an operator who meets the requirements and holds a K3 license, whoever owns the unit.

    Common misconception

    A safety lock that engages often should be tied back so the work goes smoothly.

    Why is it wrong?

    A safety lock that engages is a sign of a fault. Tying it back or bypassing it removes the last protection against the cradle falling.

    Common misconception

    Annual inspection and testing is enough, so daily checks can be skipped.

    Why is it wrong?

    Wire ropes are inspected every day before operation and once a week, in addition to periodic inspection and testing.

    Common misconception

    A harness alone is enough, and its attachment point can be on the cradle.

    Why is it wrong?

    The life line is tied to the building structure, separate from the cradle suspension system, so that a cradle failure does not drag people down with it.

    Harnesses, fall protection lines, and the principle of avoiding work at height are covered in Chapter 10 · Safety on work at height, while safe working load, slings, and center of gravity are in Chapter 9 · Safety on lifting loads. Gondola supports and rails penetrate or stand on the roof covered in Chapter 35, and roof work requires a permit to work under Chapter 76 · Electrical & Control. Maintenance reports containing brake and wire rope data are read as described in Chapter 28, and glass that cracks or breaks during cleaning is handled according to Chapter 50 on building glass and windows.

    Exercises and worked solutions

    The numbers in the exercises are for practice.

    Try to answer first, then open the worked solution.

    1. The roof anemometer shows an average of 26 km/h with gusts of 34 km/h, while the manufacturer’s manual sets a limit of 12 m/s. May work proceed?

      Check my answer
      See the worked solution

      The manufacturer’s limit of 12 m/s is equivalent to 12×3.6=43.212 \times 3.6 = 43.2 km/h, so the Permenaker limit of 32 km/h still applies because it is lower. Gusts of 34 km/h exceed 32 km/h, so the work does not start or is stopped even though the average is below the limit.

    2. The cradle plate states 240 kg. Three people of 72 kg each want to board together with 25 kg of tools. What is the decision?

      Check my answer
      See the worked solution

      The load is 3×72+25=2413 \times 72 + 25 = 241 kg, exceeding 240 kg even if only by 1 kg. The safe working load must not be exceeded, so only two people board or the tools are reduced until the load is below the limit.

    3. A 5 m cradle tilts with a height difference of 1.5 m. What does this mean against the Permenaker limit?

      Check my answer
      See the worked solution

      sin⁡θ=1.5/5=0.3\sin\theta = 1.5/5 = 0.3, so θ=17.5°\theta = 17.5°, beyond the 15° limit. The operator stops the movement and a licensed technician investigates the cause, because a tilt that large indicates a fault in the hoist or rope on one side.

    4. The unit’s first inspection and testing took place on February 2, 2024, and its first periodic inspection and testing on February 1, 2026. In November 2026, is the unit still within its schedule, and when is the next inspection and testing due?

      Check my answer
      See the worked solution

      The first periodic inspection and testing is done within 2 years after the first test, then every year, so the next one is due no later than February 1, 2027. In November 2026 the unit is still within its schedule, provided its certificate states that it meets K3 requirements and the daily checks are recorded.

    5. The cradle judders while descending, and the contractor’s operator asks the building technician to help adjust the brake from the roof. What is the technician’s answer?

      Check my answer
      See the worked solution

      The building technician refuses, because adjusting the brake is work for a licensed gondola technician or the manufacturer, not something someone else does from the roof. The cradle is not used again after the operator has brought it down, the event is reported to the contractor’s supervisor, and the unit waits for inspection by a licensed technician.

    6. The hotel’s windows on floors 2 to 5, up to about 18 m from the ground, have always been cleaned with the gondola. What should be considered?

      Check my answer
      See the worked solution

      Under the HSE order, work at height is avoided where reasonably practicable. Water-fed poles can clean windows up to about 24 m from the ground, so windows up to 18 m can be assessed for cleaning from the ground, taking into account obstructions in front of them and power lines above them.

    References

    External sources

    • Peraturan Menteri Ketenagakerjaan Nomor 8 Tahun 2020 tentang Keselamatan dan Kesehatan Kerja Pesawat Angkat dan Pesawat Angkutjdih.kemnaker.go.id
    • Specialist access equipmenthse.gov.uk
    • L113: Safe use of lifting equipment. Lifting Operations and Lifting Equipment Regulations 1998. Approved Code of Practice and guidancehse.gov.uk
    • Peraturan Menteri Ketenagakerjaan Nomor 11 Tahun 2026 tentang Tata Cara Pengawasan Ketenagakerjaanjdih.kemnaker.go.id
    • Working at height: A brief guidehse.gov.uk
    • Safety in window cleaning using Water-fed Pole Systemshse.gov.uk
    • Thorough examination of lifting equipment: A simple guide for employershse.gov.uk

    Revision history

    DateVersionChange
    November 15, 20261First published

    How to cite

    Kurnia (2026). Gondolas and facade access for glass cleaning: building maintenance units, wire ropes and brakes, roof anchor points, daily checks, wind and weather, and work boundaries. ARSTEMA Academy. Revised November 15, 2026. arstema.com/en/academy/konsep/gondola-dan-akses-fasad-untuk-pembersihan-kaca-unit-pemeliharaan-bangunan-tali-baja-dan-rem-titik-jangkar-atap-pemeriksaan-harian-angin-dan-cuaca-serta-batas-pekerjaan

    Self-check · 3 questions

    Check your understanding before moving on

    Write your answer in your own words, then compare it with the worked solution from this chapter’s exercises. The system doesn’t judge open answers as right or wrong; you decide which parts you’ve understood.

    0/3rated

    Safety limits still apply. This quiz tests reasoning; it doesn’t authorize mixing, adjusting, dismantling, live measurement, or field action.

    1

    The roof anemometer shows an average of 26 km/h with gusts of 34 km/h, while the manufacturer’s manual sets a limit of 12 m/s. May work proceed?

    2

    The cradle plate states 240 kg. Three people of 72 kg each want to board together with 25 kg of tools. What is the decision?

    3

    A 5 m cradle tilts with a height difference of 1.5 m. What does this mean against the Permenaker limit?